Toronto Hydro's Conditions of Service and six reference documents are changing. The proposed implementation date is January 1, 2027. We've outlined the proposed changes in the following documents.
Proposed Conditions of Service updates (effective January 1, 2027)
Proposed main document
Proposed reference documents
- Reference 3. Distributed Energy Resource Requirements (PDF, 1.3 MB)
- Reference 4. Requirements for the Design and Construction of Customer-Owned High Voltage Substations (PDF, 2.6 MB)
- Reference 5a. Requirements for the Design and Construction of Customer-Owned Structures (PDF, 444 KB)
- Reference 5b. Construction Standards referenced in Requirements for the Design and Construction of Customer-Owned Structures (PDF, 36.1 MB)
- Reference 6. Metering Requirements 750 Volts or Less (PDF, 1.8 MB)
- Reference 9. Electric Vehicle Charging Connection Requirements for Toronto Hydro Customers (PDF, 178 KB)
The proposed main document and proposed reference documents are currently in draft form. Customers can review the proposed changes and submit comments until December 11, 2026. Customers can submit comments using the contact information at the bottom of this page.