Toronto Hydro's Conditions of Service and five reference documents are changing. The proposed implementation date is January 1, 2026.
The revisions focus on updating technical requirements, enhancing policy clarity and improving customer service. These changes provide customers with clearer guidance on their roles and obligations when interacting with Toronto Hydro while ensuring alignment with current processes, standards and regulatory requirements. For more information, refer to the Summary of Proposed Revisions document below.
Proposed main document
Proposed reference documents
- Reference 1. Economic Evaluation Model for Distribution System Expansion (PDF, 264 KB)
- Reference 3. Distributed Energy Resource Requirements (PDF, 1.4 MB)
- Reference 5a. Requirements for the Design and Construction of Customer-Owned Structures (PDF, 301 KB)
- Reference 5b. Construction Standards referenced in Requirements for the Design and Construction of Customer-Owned Structures (PDF, 34.9 MB)
- Reference 6. Metering Requirements 750 Volts or Less (PDF, 1.7 MB)
The proposed main document and proposed reference documents are currently in draft form. Customers can review the proposed changes and submit comments until December 22, 2025. Customers can submit comments using the contact information at the end of this page.
View or download our Conditions of Service
Conditions of Service - Main Document (PDF, 2.2 MB)
Additional documents
Revision summary
The Conditions of Service - Revision #24 Summary (PDF, 162 KB) highlights the latest revisions made to the Conditions of Service document.
Reference documents
The Conditions of Service reference documents provide further background information:
- Reference 1. Economic Evaluation Model for Distribution System Expansion (PDF, 104 KB)
- Reference 2. Standard Connection Agreements - Terms of Conditions (PDF, 70 KB)
- Reference 3. Distributed Energy Resource Requirements (PDF, 16.3 MB)
- Reference 4. Requirements for the Design and Construction of Customer-Owned High Voltage Substations (PDF, 3.2 MB)
- Reference 5a. Requirements for the Design and Construction of Customer-Owned Structures (PDF, 303 KB)
- Reference 5b. Construction Standards referenced in Requirements for the Design and Construction of Customer-Owned Structures (PDF, 30.5 MB)
- Reference 6. Metering Requirements 750 Volts or Less (PDF, 1.9 MB)
- Reference 7. Metering Requirements for 13.8kV and 27.6kV Customer-Owned Substations (PDF, 1,000 KB)
- Reference 8. Metering Services and Charges (PDF, 447 KB)
- Reference 9. Electric Vehicle Charging Connection Requirements for Toronto Hydro Customers (PDF, 147 KB)
Please note: Our Conditions of Service are subject to change. They are regulated by the Ontario Energy Board, and Toronto Hydro will submit any changes to the Ontario Energy Board.
Questions or comments?
Feedback regarding the latest revisions to our Conditions of Service can be emailed to conditionsofservice@torontohydro.com or mailed to: