	<PROJECT>
		<ID>W16413,W17151</ID>
		<PNAME>Thorncrest Phase 8</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging backyard electrical system in the community with a front yard underground system. The rebuild includes the installation of underground electrical cables, 
		padmount transformers and tap boxes within the City of Toronto’s public property allowance and on private property.Throughout this project, planned outages may be necessary to switch from the old to the new 
		electrical system and we intend to provide advance notice. Toronto Hydro crews and contractors will take extra care and precautions around the property. Please note that we may require access to the 
		private property, including the backyard, to connect new lines and install an underground duct from the property line to the meter base location at the home. The portion of the driveway, sidewalk and other areas 
		affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Rear-lot Conversion</ACTIVITY>
		<WARD>3</WARD>
		<TIMELINE>March 2018 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Thorncrest Phase 8.JPG</PICTURE>
		<LAT>43.672695</LAT>
		<LNG>-79.558692</LNG>
		<LIVE>yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X13158</ID>
		<PNAME>Carlaw B1E &amp; B13E Phase 1, Electrical</PNAME>
		<DESCRIPTION>&lt;p style="text-align: justify;"&gt;Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles within the City of Toronto&amp;rsquo;s public property allowance in front of or adjacent to the lots.&amp;nbsp;&lt;/p&gt;
 &lt;p style="text-align: justify;"&gt;Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide the community with advance notice.&amp;nbsp;&lt;/p&gt;
 &lt;p style="text-align: justify;"&gt;Toronto Hydro crews and contractors will take extra care and precautions around the properties. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.&amp;nbsp;&lt;/p&gt;</DESCRIPTION>
		<ACTIVITY>Overhead Construction</ACTIVITY>
		<WARD>30</WARD>
		<TIMELINE>November 2018 - August 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>1210-key-map.JPG</PICTURE>
		<LAT>43.669794</LAT>
		<LNG>-79.333102</LNG>
		<LIVE>yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X13158</ID>
		<PNAME>Carlaw B1E &amp; B13E Phase 2</PNAME>
		<DESCRIPTION>&lt;p style="text-align: justify;"&gt;Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles within the City of Toronto&amp;rsquo;s public property allowance in front of or adjacent to the lots.&amp;nbsp;&lt;/p&gt;
 &lt;p style="text-align: justify;"&gt;Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide the community with advance notice.&amp;nbsp;&lt;/p&gt;
 &lt;p style="text-align: justify;"&gt;Toronto Hydro crews and contractors will take extra care and precautions around the properties. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.&amp;nbsp;&lt;/p&gt;</DESCRIPTION>
		<ACTIVITY>Overhead Construction</ACTIVITY>
		<WARD>30</WARD>
		<TIMELINE>July 2018 – November 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>1213-key-map.JPG</PICTURE>
		<LAT>43.669230</LAT>
		<LNG>-79.335595</LNG>
		<LIVE>yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E15272,E15300</ID>
		<PNAME>Concorde Wynford Revised Timeline</PNAME>
		<DESCRIPTION>&lt;p style="text-align: justify;"&gt;Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the City of Toronto&amp;rsquo;s public property allowance in front of or adjacent to the lots.&amp;nbsp;&lt;/p&gt;
 &lt;p style="text-align: justify;"&gt;Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide the community with advance notice.&amp;nbsp;&lt;/p&gt;
 &lt;p style="text-align: justify;"&gt;Toronto Hydro crews and contractors will take extra care and precautions around the properties. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.&lt;/p&gt;</DESCRIPTION>
		<ACTIVITY>Underground Construction</ACTIVITY>
		<WARD>16</WARD>
		<TIMELINE>February 2019 - December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>1227-key-map.JPG</PICTURE>
		<LAT>43.727376</LAT>
		<LNG>-79.327758</LNG>
		<LIVE>yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W10118</ID>
		<PNAME>Mosque - Shalom</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve 
service reliability. The rebuild includes the replacement of the existing electrical cables and tap boxes within the City 
of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages 
may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Toronto Hydro crews and contractors will take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line to the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.  </DESCRIPTION>
        <ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>1</WARD>
		<TIMELINE>October 2017 - November 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>MosqueShalom.JPG</PICTURE>
		<LAT>43.730110</LAT>
		<LNG>-79.588530</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W15491</ID>
		<PNAME>Tamworth - Churchill</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables within the City of Toronto’s 
		public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. 
		Toronto Hydro crews and contractors will take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct. The portion of the driveway, sidewalk and other 
		areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
        <ACTIVITY>Underground Electrical</ACTIVITY>
		<WARD>23</WARD>
		<TIMELINE>February 2018 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Tamworth_Churchill.JPG</PICTURE>
		<LAT>43.771947</LAT>
		<LNG>-79.420082</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18319</ID>
		<PNAME>Hammersmith - Queen</PNAME>
		<DESCRIPTION>Please be advised that we’re planning to rebuild the aging underground electrical system in the community to help 
		improve service reliability. 
		The rebuild includes the replacement of existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
        <ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>32</WARD>
		<TIMELINE>May 2018 - December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Hammersmith - Queen.JPG</PICTURE>
		<LAT>43.672006</LAT>
		<LNG>-79.290292 </LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W14665</ID>
		<PNAME>Royal York - Westridge Revised Timeline</PNAME>
		<DESCRIPTION> Please be advised that we’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability.
		The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.
 		</DESCRIPTION>
        <ACTIVITY>Overhead and Underground Electrical</ACTIVITY>
		<WARD>4</WARD>
		<TIMELINE>April 2018 - February 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Royal York - Westridge.JPG</PICTURE>
		<LAT>43.661206</LAT>
		<LNG>-79.515975 </LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E18386</ID>
		<PNAME>Flemingdon - Egress Revised Timeline</PNAME>
		<DESCRIPTION> We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the repair of an existing manhole and replacement of the existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.</DESCRIPTION>
        <ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>26</WARD>
		<TIMELINE>July 2018 - June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Flemingdon - Egress.JPG</PICTURE>
		<LAT>43.719739</LAT>
		<LNG>-79.332016 </LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18251</ID>
		<PNAME>Runnymede Phase 2</PNAME>
		<DESCRIPTION> We’re planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles within the 
		City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we 
		intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road allowance in order to accommodate new hydro infrastructure. 
		Upon project completion, affected areas will be restored.
 		</DESCRIPTION>
        <ACTIVITY>Overhead Civil and Electrical</ACTIVITY>
		<WARD>13</WARD>
		<TIMELINE>June 2018 – December 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Runnymede Phase 2.JPG</PICTURE>
		<LAT>43.655685</LAT>
		<LNG>-79.478181 </LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X13004</ID>
		<PNAME>Dupont – Dufferin Cable Pulling</PNAME>
		<DESCRIPTION> We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of the existing electrical cables within the City of Toronto’s public property allowance in front of or adjacent to the lot.Throughout this project, no planned outages are expected.Our crews and contractors will take extra care and precautions around the property. 
		Please note that we may require access to the property to install an underground duct from the property line to the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
        <ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>18</WARD>
		<TIMELINE>May 2018 - September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Dupont – Dufferin Cable Pulling.JPG</PICTURE>
		<LAT>43.670974</LAT>
		<LNG>-79.427047  </LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X14686</ID>
		<PNAME>John Street Phase 1 </PNAME>
		<DESCRIPTION> Please be advised that our contractor Entera is planning to rebuild the aging underground electrical system in the community to help improve service reliability and increase capacity to meet a growing demand. 
		The rebuild includes the replacement of existing ductbanks, cable chambers and electrical cables required in the immediate civil construction within the city-owned property near the lot. 
		The work will take place in conjunction with the City of Toronto’s planned reconstruction to improve the John Street Corridor as part of the Council-endorsed “cultural corridor.” </DESCRIPTION>
        <ACTIVITY>Underground Civil</ACTIVITY>
		<WARD>20</WARD>
		<TIMELINE>May 2018 - September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>John Street Phase 1.JPG</PICTURE>
		<LAT>43.650055</LAT>
		<LNG>-79.391148 </LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E17522, E18387</ID>
		<PNAME>Bermondsey Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service 
		reliability. The rebuild includes the replacement of the existing electrical cables within the City of Toronto’s public property 
		allowance in front of or adjacent to the lot. Our crews and contractors will take extra care and precautions around the property. 
		The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, 
		weather and schedules permit.</DESCRIPTION>
        <ACTIVITY>Underground Civil</ACTIVITY>
		<WARD>34</WARD>
		<TIMELINE>May 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Bermondsey.JPG</PICTURE>
		<LAT>43.723685</LAT>
		<LNG>-79.314608</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E17525</ID>
		<PNAME>Markham - Greenholm</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground and overhead electrical system in the community to help improve 
		service reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the City 
		of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be 
		necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and 
		contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas 
		affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
        <ACTIVITY>Underground and Overhead: Civil and Electrical</ACTIVITY>
		<WARD>38</WARD>
		<TIMELINE>March 2018 - September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Markham - Greenholm.JPG</PICTURE>
		<LAT>43.761007</LAT>
		<LNG>-79.225760</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X14202</ID>
		<PNAME>Bloor - Brock</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead electrical system in the community to help improve service 
		reliability. The rebuild includes upgrading overhead electrical cables and/or replacing 
		hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this 
		project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide 
		advance notice. Our crews and contractors will take extra care and precautions around the property. Please be 
		advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public property 
		allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be 
		restored.</DESCRIPTION>
        <ACTIVITY>Overhead Electrical</ACTIVITY>
		<WARD>18</WARD>
		<TIMELINE>March 2018 - November 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Bloor - Brock.JPG</PICTURE>
		<LAT>43.658347</LAT>
		<LNG>-79.434750</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X17456</ID>
		<PNAME>Wellington Streetscape</PNAME>
		<DESCRIPTION>We’re planning to relocate the aging underground electrical system in the community to help improve service 
		reliability. The work includes the replacement of the existing electrical cables and transformers within the City of 
		Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be 
		necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews 
		and contractors will take extra care and precautions around the property. Please note that we may require access to the 
		property to install an underground duct. The portion of the driveway, sidewalk and other areas affected by our work will 
		be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
        <ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>28</WARD>
		<TIMELINE>March 2018 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Wellington Streetscape.JPG</PICTURE>
		<LAT>43.648514</LAT>
		<LNG>-79.374317</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E15327</ID>
		<PNAME>Leslie - McNicoll, Phase B Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service 
		reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the City of 
		Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be 
		necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews 
		and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other 
		areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
        <ACTIVITY>Underground Electrical</ACTIVITY>
		<WARD>17</WARD>
		<TIMELINE>February 2019 - July 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Leslie - McNicoll, Phase B.JPG</PICTURE>
		<LAT>43.802341</LAT>
		<LNG>-79.363659</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18093</ID>
		<PNAME>Thorncliffe Park Phase 4 Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service 
		reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the City of 
		Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be 
		necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews 
		and contractors will take extra care and precautions around the property. Please note that we may require access to the 
		property to install an underground duct from the property line to the meter base location at the home. The portion of the 
		driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather 
		and schedules permit.</DESCRIPTION>
        <ACTIVITY>Underground Electrical</ACTIVITY>
		<WARD>26</WARD>
		<TIMELINE>August 2019 – November 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Thorncliffe Park Phase 4.JPG</PICTURE>
		<LAT>43.704062</LAT>
		<LNG>-79.341174</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18294,X18390</ID>
		<PNAME>Hammersmith Phase 5</PNAME>
		<DESCRIPTION>Please be advised that we’re planning to rebuild the aging overhead electrical system in the 
		community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and 
		replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
        <ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<WARD>32</WARD>
		<TIMELINE>April 2018 - June 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Hammersmith Phase 5.JPG</PICTURE>
		<LAT>43.668916</LAT>
		<LNG>-79.304996</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X11501</ID>
		<PNAME>Spadina - Sullivan</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help 
	     improve service reliability. The rebuild includes the upgrade of an existing underground vault within the City of Toronto’s public
		 property allowance in front of or adjacent to the lot. Throughout this project, no planned outages are expected. Our crews and 
		 contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected 
		 by our work will be restored upon completion of the project as season, weather and schedules permit. </DESCRIPTION>
        <ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>20</WARD>
		<TIMELINE>August 2018 – July 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Spadina - Sullivan.JPG</PICTURE>
		<LAT>43.650864</LAT>
		<LNG>-79.397125 </LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W13437</ID>
		<PNAME>QEW Crossing Phase 3 Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of the existing electrical cables and transformers within the City of Toronto’s public property allowance in 
		front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and 
		we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property. Please note that 
		we may require access to the property to install an underground duct from the property line. The portion of the driveway, sidewalk and other areas 
		affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>5</WARD>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>QEW Crossing Phase 3-Ward 5.JPG</PICTURE>
		<LAT>43.609364</LAT>
		<LNG>-79.554660 </LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18374</ID>
		<PNAME>Runnymede – Mount Dennis</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve 
		service reliability. The rebuild includes the replacement of the existing electrical cables and transformers within 
		the City of Toronto’s public property allowance in front of or adjacent to the lot.Throughout this project, planned 
		outages may be necessary to switch from the old to the new electrical system and we intend to provide advance 
		notice. Our crews and contractors will take extra care and precautions around the property. Please note that we may 
		require access to the property to install an underground duct from the property line. The portion of the driveway, 
		sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Electrical</ACTIVITY>
		<WARD>11</WARD>
		<TIMELINE>July 2018 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Runnymede – Mount Dennis.JPG</PICTURE>
		<LAT>43.679049</LAT>
		<LNG>-79.496910 </LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Leslie Street</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of the existing electrical cables and transformers within the City of Toronto’s public property allowance in 
		front of or adjacent to the lot.Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and 
		we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property. Please be advised 
		that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road allowance in order to accommodate 
		new hydro infrastructure. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project 
		as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>25</WARD>
		<TIMELINE>June 2018 - September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Leslie Street.JPG</PICTURE>
		<LAT>43.718131</LAT>
		<LNG>-79.350537</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X13164</ID>
		<PNAME>Wiltshire</PNAME>
		<DESCRIPTION>Please be advised that we are planning to rebuild the aging overhead electrical system in the community to help improve service reliability. 
		The rebuild includes upgrading overhead electrical wires and transformers as well as replacing hydro poles on city-owned property near the lot. </DESCRIPTION> 
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<WARD>17</WARD>
		<TIMELINE>July 2018 – October 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Wiltshire.JPG</PICTURE>
		<LAT>43.669070</LAT>
		<LNG>-79.457224 </LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18524</ID>
		<PNAME>Runnymede Phase 1B</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement 
		of existing electrical cables and hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot.Our crews and contractors will take 
		extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as 
		season, weather and schedules permit </DESCRIPTION> 
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>13</WARD>
		<TIMELINE>August 2018 – August 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Runnymede Phase 1B.JPG</PICTURE>
		<LAT>43.663785</LAT>
		<LNG>-79.463847 </LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W16290</ID>
		<PNAME>Westmount Phase 7A</PNAME>
		<DESCRIPTION>Please be advised that we’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the 
		replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the property to install an underground
		pipe that connects the meter at the home to the main electrical line.</DESCRIPTION> 
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<WARD>2</WARD>
		<TIMELINE>May 2018 - November 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Westmount Phase 7A.JPG</PICTURE>
		<LAT>43.700067</LAT>
		<LNG>-79.546942</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W14760</ID>
		<PNAME>Bloor – Highway 427 Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to perform work on the underground electrical system in the community. The project includes the relocation of the existing electrical cables and feeders within 
		the City of Toronto’s public property allowance at Bloor Street West and Highway 427. Our crews and contractors will take extra care and precautions around the property. The portion of areas
		affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<WARD>3,5</WARD>
		<TIMELINE>June 2018 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Bloor – Highway 427ward5.JPG</PICTURE>
		<LAT>43.636211</LAT>
		<LNG>-79.559596</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>25 Ballyconnor Court</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical 
		cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot.Throughout this project, planned outages may be necessary to switch from the old to the 
		new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other 
		areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>24</WARD>
		<TIMELINE>July 2018 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>25 Ballyconnor Court.JPG</PICTURE>
		<LAT>43.79921</LAT>
		<LNG>-79.385576</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>743 Warden Avenue</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables 
		and transformers within private property. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.
		Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project 
		as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>35</WARD>
		<TIMELINE>July 2018 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>743 Warden Avenue.JPG</PICTURE>
		<LAT>43.718259</LAT>
		<LNG>-79.283554</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>W14131</ID>
		<PNAME>Inglis - Shenstone</PNAME>
		<DESCRIPTION>Please be advised that we’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical 
		cables and transformers within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>10</WARD>
		<TIMELINE>September 2018 - August 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Inglis - Shenstone.JPG</PICTURE>
		<LAT>43.787774</LAT>
		<LNG>-79.454131</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>N/A</ID>
		<PNAME>71 Rexdale Traffic Lights</PNAME>
		<DESCRIPTION>We’re planning to install a new traffic light within the City of Toronto’s public property allowance in front of or adjacent to the lot to help improve traffic safety and traffic flow. Our crews and contractors will take extra care and precautions 
		around the property. Upon project completion, affected areas will be restored.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical</ACTIVITY>
		<WARD>2</WARD>
		<TIMELINE>September 2018 – July 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>71 Rexdale Traffic Lights.JPG</PICTURE>
		<LAT>43.713088</LAT>
		<LNG>-79.561163</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>N/A</ID>
		<PNAME>Meadowglen Place</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of 
		the existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot.Throughout this project, planned outages 
		may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.Our crews and contractors will take extra care and precautions 
		around the property. Please note that we may require access to the property to install an underground duct from the property line to the meter base location at the home. The portion 
		of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>38</WARD>
		<TIMELINE>September 2018 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Meadowglen Place.JPG</PICTURE>
		<LAT>43.773667</LAT>
		<LNG>-79.229835 </LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>X13177</ID>
		<PNAME>Annette – Brad</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables 
		and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical
		system and we intend to provide advance notice.Our crews and contractors will take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be 
		trimming a number of the overgrown trees on the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>14</WARD>
		<TIMELINE>October 2018 – February 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Annette – Brad.JPG</PICTURE>
		<LAT>43.664030</LAT>
		<LNG>-79.458244</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E19316</ID>
		<PNAME>TTC Subway Extension Phase 1</PNAME>
		<DESCRIPTION>Please be advised that we’re planning to perform work on the underground electrical system in the community to accommodate for Toronto Transit Commission’s Subway Expansion 
		Project. The work includes the relocation of feeders and replacement of existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<WARD>38</WARD>
		<TIMELINE>September 2018 -  October 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>TTC Subway Extension Phase 1.JPG</PICTURE>
		<LAT>43.778607</LAT>
		<LNG>-79.255347</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E18049</ID>
		<PNAME>Sheppard - Burbank</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and 
		replacing hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors will take extra care and precautions around the property.
		Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road allowance in order to accommodate new hydro infrastructure. 
		Upon project completion, affected areas will be restored.</DESCRIPTION>
		<ACTIVITY>Overhead Civil</ACTIVITY>
		<WARD>24</WARD>
		<TIMELINE>November 2018 - September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Sheppard - Burbank.JPG</PICTURE>
		<LAT>43.772481</LAT>
		<LNG>-79.377324</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>W18134</ID>
		<PNAME>Pinewood Avenue</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles 
		within the City of Toronto’s public property allowance in front of or adjacent to the lot.Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to 
		provide advance notice.Our crews and contractors will take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown 
		trees on the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical</ACTIVITY>
		<WARD>21</WARD>
		<TIMELINE>November 2018 - August 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Pinewood Avenue.JPG</PICTURE>
		<LAT>43.68527</LAT>
		<LNG>-79.425078</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E15643</ID>
		<PNAME>Neilson Bridge</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the relocation of the switchgear within the City of Toronto’s 
		public property allowance in front of or adjacent to the lot.Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.
		Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and 
		schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>42</WARD>
		<TIMELINE>December 2018 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Neilson Bridge.JPG</PICTURE>
		<LAT>43.795549</LAT>
		<LNG>-79.216440</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E18558</ID>
		<PNAME>TTC Donlands</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical 
		cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot.Throughout this project, planned outages may be necessary to switch from the old to the new 
		electrical system and we intend to provide advance notice.Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected 
		by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>29</WARD>
		<TIMELINE>December 2018 - July 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>TTC Donlands.JPG</PICTURE>
		<LAT>43.681238</LAT>
		<LNG>-79.337655</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>W19327</ID>
		<PNAME>Highway 427 Queensway</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables within
		the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide 
		advance notice.Our crews and contractors will take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line. 
		The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>5</WARD>
		<TIMELINE>December 2018 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Highway 427 Queensway.JPG</PICTURE>
		<LAT>43.618406</LAT>
		<LNG>-79.548812</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E18574</ID>
		<PNAME>Kennedy – Park</PNAME>
		<DESCRIPTION>We’re planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification program.Throughout this project, planned outages 
		may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.Our crews and contractors will take extra care and precautions around the property. The portion of 
		the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>20</WARD>
		<TIMELINE>January 2019 – January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Kennedy – Park.JPG</PICTURE>
		<LAT>43.709847</LAT>
		<LNG>-79.258728</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E18580</ID>
		<PNAME>McCowan – Landmark</PNAME>
		<DESCRIPTION>We’re planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification program.Throughout this project, planned outages 
		may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.Our crews and contractors will take extra care and precautions around the property. The portion of 
		the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>20</WARD>
		<TIMELINE>January 2019 - September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>McCowan – Landmark.JPG</PICTURE>
		<LAT>43.737850</LAT>
		<LNG>-79.237732</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E18577</ID>
		<PNAME>Passmore - Silverstar</PNAME>
		<DESCRIPTION>We’re planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification program.Throughout this project, planned outages 
		may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.Our crews and contractors will take extra care and precautions around the property. The portion of 
		the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>22</WARD>
		<TIMELINE>January 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Passmore - Silverstar.JPG</PICTURE>
		<LAT>43.819991</LAT>
		<LNG>-79.298232</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>X18441</ID>
		<PNAME>Adelaide Street Vault Rebuild Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing vaults and electrical cables within the 
		City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors will take extra care and precautions around the property. Please note that we may require access to the 
		property to install an underground duct from the property line. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and 
		schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>13</WARD>
		<TIMELINE>February 2019 - September 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Adelaide Street Vault Rebuild.JPG</PICTURE>
		<LAT>43.650153</LAT>
		<LNG>-79.381525</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>X19117</ID>
		<PNAME>Summerhill</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables and transformers 
		within the City of Toronto’s public property allowance in front of or adjacent to the lot.Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we 
		intend to provide advance notice.Our crews and contractors will take extra care and precautions around the property. Please note that we may require access to the property to install an underground 
		duct from the property line to the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather 
		and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>12</WARD>
		<TIMELINE>February 2019 - August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Summerhill.JPG</PICTURE>
		<LAT>43.682510</LAT>
		<LNG>-79.399751</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E15025</ID>
		<PNAME>Braymore Phase 1</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing tap boxes, splice vaults, 
		cable chambers and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot.Our crews and contractors will take extra care and precautions around the property. Please 
		note that we may require access to the property to install an underground duct from the property line to the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our 
		work will be restored upon completion of the project as season, weather and schedules permit</DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<WARD>25</WARD>
		<TIMELINE>February 2019 – October 2019</TIMELINE>
		<PSTATUS>completed</PSTATUS>
		<PICTURE>Braymore Phase 1.JPG</PICTURE>
		<LAT>43.806528</LAT>
		<LNG>-79.170860</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>THR2016-00059OT</ID>
		<PNAME>Ice Path Relocation</PNAME>
		<DESCRIPTION>We’re planning to relocate the aging underground electrical system in the community to accommodate for the City of Toronto’s tunnel project. The work includes upgrading existing electrical cables and 
		transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system
		and we intend to provide advance notice.Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be 
		restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>10</WARD>
		<TIMELINE>January 2019 – January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Ice Path Relocation.JPG</PICTURE>
		<LAT>43.642165</LAT>
		<LNG>-79.381170</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>X17242</ID>
		<PNAME>Vault Roof Rebuild</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot.Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.Our crews and contractors will take extra care and precautions around the property. The portion of the sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>12</WARD>
		<TIMELINE>February 2019 – July 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Vault Roof Rebuild.JPG</PICTURE>
		<LAT>43.690167</LAT>
		<LNG>-79.402324</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>X17544</ID>
		<PNAME>Carlaw Feeder Upgrade</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot.Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Electrical</ACTIVITY>
		<WARD>14</WARD>
		<TIMELINE>March 2019 – September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Carlaw Feeder Upgrade.JPG</PICTURE>
		<LAT>43.664834</LAT>
		<LNG>-79.341580</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>X17144</ID>
		<PNAME>Carlaw Dundas Cable Upgrade</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables within the City of Toronto’s public property allowance in front of or adjacent to the lot.Our crews and contractors will take extra care and precautions around the property.</DESCRIPTION>
		<ACTIVITY>Underground Electrical</ACTIVITY>
		<WARD>14</WARD>
		<TIMELINE>March 2019 – September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Carlaw Dundas Cable Upgrade.JPG</PICTURE>
		<LAT>43.664834</LAT>
		<LNG>-79.341580</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>W16200</ID>
		<PNAME>Bloor - The West Mall</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot.Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.Our crews and contractors will take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical</ACTIVITY>
		<WARD>2</WARD>
		<TIMELINE>February 2019 - August 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Bloor – The West Mall.JPG</PICTURE>
		<LAT>43.637576</LAT>
		<LNG>-79.563902</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>MSO-1901</ID>
		<PNAME>Network Vault Rebuild</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<WARD>11</WARD>
		<TIMELINE>March 2019 - July 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Network Vault Rebuild.JPG</PICTURE>
		<LAT>43.670639</LAT>
		<LNG>-79.393705</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E18544,E18547</ID>
		<PNAME>Markham – 401</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot.Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>23</WARD>
		<TIMELINE>March 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Markham - 401.jpg</PICTURE>
		<LAT>43.786017</LAT>
		<LNG>-79.235462</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>W10453</ID>
		<PNAME>Bathurst Cable Replacement</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of underground primary cables utilizing existing underground duct structures within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>6</WARD>
		<TIMELINE>March 2019 - July 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>BathurstCableReplace.JPG</PICTURE>
		<LAT>43.739400</LAT>
		<LNG>-79.434423</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>W18158</ID>
		<PNAME>William Street - Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot.  Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.  Our crews and contractors will take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical</ACTIVITY>
		<WARD>5</WARD>
		<TIMELINE>November 2019 – September 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>William Street.JPG</PICTURE>
		<LAT>43.705486</LAT>
		<LNG>-79.509863</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>X15737</ID>
		<PNAME>Brock Margueretta Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of electrical cables and switchgears within the City of Toronto’s public property allowance in front of or adjacent to the lot.  Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.  Our crews and contractors will take extra care and precautions around the property. Any portions of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead Underground Civil and Electrical</ACTIVITY>
		<WARD>9</WARD>
		<TIMELINE>March 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>BrockM.JPG</PICTURE>
		<LAT>43.658993</LAT>
		<LNG>-79.439631</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E16316</ID>
		<PNAME>Blue Eagle – Dunmail</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.  Our crews and contractors will take extra care and precautions around the property. Please note that we may require access to the property to connect the new cables to the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Electrical</ACTIVITY>
		<WARD>23</WARD>
		<TIMELINE>March 2019 - September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>BlueEagleDunmail.JPG</PICTURE>
		<LAT>43.803854</LAT>
		<LNG>-79.286032</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E17241</ID>
		<PNAME>SCADA Switch Replacement</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot.  Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical</ACTIVITY>
		<WARD>25</WARD>
		<TIMELINE>March 2019 - July 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>ScadaSwitchReplacement.JPG</PICTURE>
		<LAT>43.783956</LAT>
		<LNG>-79.127200</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>X16745</ID>
		<PNAME>4298 Vault Rebuild Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot.  Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.  Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Electrical</ACTIVITY>`
		<WARD>10</WARD>
		<TIMELINE>March 2019 - March 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>4298VaultRebuild.JPG</PICTURE>
		<LAT>43.648921</LAT>
		<LNG>-79.380345</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E17228</ID>
		<PNAME>Ridgewood – Starspray Phase 2</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property.</DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<WARD>12</WARD>
		<TIMELINE>January 2019 – September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Ridgewood – Starspray Phase 2.JPG</PICTURE>
		<LAT>43.791085</LAT>
		<LNG>-79.123833</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E14038</ID>
		<PNAME>Maisonette Phase 1</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, there are no planned outages.  The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<WARD>23</WARD>
		<TIMELINE>January 2019 – January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>MaisonettePhase1.JPG</PICTURE>
		<LAT>43.783473</LAT>
		<LNG>-79.266430</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>W17188</ID>
		<PNAME>Carlingview Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables, transformers and hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical</ACTIVITY>
		<WARD>1</WARD>
		<TIMELINE>April 2019 - August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Carlingview.JPG</PICTURE>
		<LAT>43.683828</LAT>
		<LNG>-79.593514</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>W18573</ID>
		<PNAME>Eglinton Croham</PNAME>
		<DESCRIPTION>We’re planning to rebuild and relocate the overhead electrical system in the community in preparation for the GO Expansion Electrification program. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.  Our crews and contractors will take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical</ACTIVITY>
		<WARD>8</WARD>
		<TIMELINE>April 2019 – September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>EglintonCroham.JPG</PICTURE>
		<LAT>43.692706</LAT>
		<LNG>-79.463540</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>E18575</ID>
		<PNAME>Beechgrove – Copperfield</PNAME>
		<DESCRIPTION>We’re planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification program. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.  Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical</ACTIVITY>
		<WARD>8</WARD>
		<TIMELINE>April 2019 – September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>BeechgroveCopperfield.JPG</PICTURE>
		<LAT>43.764694</LAT>
		<LNG>-79.151892</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>X18136</ID>
		<PNAME>Richmond Bay Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>13</WARD>
		<TIMELINE>March 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>RichmondBay.JPG</PICTURE>
		<LAT>43.651475</LAT>
		<LNG>-79.379545</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	    <ID>W19182</ID>
		<PNAME>Midland Transclosure Replacement</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables,transformers and hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot.  Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>3</WARD>
		<TIMELINE>June 2019 - August 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Midland Transclosure Replacement.JPG</PICTURE>
		<LAT>43.743512</LAT>
		<LNG>-79.261949</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>E12312</ID>
		<PNAME>Scunthorpe Phase C</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors will take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line to the meter base location at the home.  The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<WARD>23</WARD>
		<TIMELINE>March 2019 - June 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Scunthorpe Phase C.JPG</PICTURE>
		<LAT>43.791270</LAT>
		<LNG>-79.244626</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>E14656</ID>
		<PNAME>Don Mills – Sheppard Phase 4</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot.Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.  Our crews and contractors will take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line to the meter base location at the home.  The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Electrical</ACTIVITY>
		<WARD>17</WARD>
		<TIMELINE>April 2019 – October 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Don Mills – Sheppard Phase 4.JPG</PICTURE>
		<LAT>43.771767</LAT>
		<LNG>-79.348549</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>X13164</ID>
		<PNAME>Wiltshire Phase 3B</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot.Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice.  Our crews and contractors will take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>9</WARD>
		<TIMELINE>March 2019 - October 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Wiltshire Phase 3B.JPG</PICTURE>
		<LAT>43.669145</LAT>
		<LNG>-79.455252</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>E18542</ID>
		<PNAME>Midland – 401</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Please note that we may require access to the property to install an underground duct from the property line to the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<WARD>21</WARD>
		<TIMELINE>March 2019 - October 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Midland – 401.JPG</PICTURE>
		<LAT>43.776601</LAT>
		<LNG>-79.274555</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>E17230/E18048</ID>
		<PNAME>Ridgewood – Starspray Phase 3</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of existing electrical cables and tap boxes within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<WARD>25</WARD>
		<TIMELINE>January 2020 - December 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Ridgewood – Starspray Phase 3.JPG</PICTURE>
		<LAT>43.788361</LAT>
		<LNG>-79.126736</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>E15592</ID>
		<PNAME>Port Royal Trail Phase 2 Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing 
		electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may 
		be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions 
		around the property. Please note that we may require access to the property to install an underground duct from the property line to the meter base location at the home. 
		The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Electrical</ACTIVITY>
		<WARD>23</WARD>
		<TIMELINE>December 2019 - July 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Port Royal Trail Phase 2.JPG</PICTURE>
		<LAT>43.824609</LAT>
		<LNG>-79.291132</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>E18265</ID>
		<PNAME>Pleasant View Drive Phase 1</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement 
		of the existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors 
		will take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line 
		to the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as 
		season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<WARD>17</WARD>
		<TIMELINE>April 2019 - September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Pleasant View Drive Phase 1.JPG</PICTURE>
		<LAT>43.784772</LAT>
		<LNG>-79.329359</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>X18447</ID>
		<PNAME>Dundas - Shuter Vault Rebuild Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading 
		existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, 
		planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra 
		care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line to the meter base 
		location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and 
		schedules permit.</DESCRIPTION>
		<ACTIVITY>Network Civil and Electrical</ACTIVITY>
		<WARD>13</WARD>
		<TIMELINE>May 2020 – December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Vault Rebuild 4891.JPG</PICTURE>
		<LAT>43.655056</LAT>
		<LNG>-79.380060</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>E17039</ID>
		<PNAME>Bonacres Electrical</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes the 
		replacement of the existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this 
		project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take 
		extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the 
		public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical</ACTIVITY>
		<WARD>25</WARD>
		<TIMELINE>April 2019 - February 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Bonacres Electrical.JPG</PICTURE>
		<LAT>43.780610</LAT>
		<LNG>-79.163032</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>		
	<PROJECT>
	<ID>E20285</ID>
		<PNAME>St. Clair – Reeve</PNAME>
		<DESCRIPTION>We’re planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification 
		program. The rebuild includes upgrading existing electrical cables, poles and cable chambers within the City of Toronto’s public property allowance in front of or adjacent 
		to the lot. Our crews and contractors will take extra care and precautions around the property. Please note that we may require access to the property to install an 
		underground duct from the property line to the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be 
		restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>20</WARD>
		<TIMELINE>April 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>St. Clair – Reeve.JPG</PICTURE>
		<LAT>43.718270</LAT>
		<LNG>-79.255733</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>  
	<ID>E13312</ID>
		<PNAME>Lawrence – Rouge Hills Phase 1 Revised Timeline</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes the replacement 
		of the existing electrical cables and hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout 
		this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors 
		will take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown 
		trees on the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>25</WARD>
		<TIMELINE>January 2020 – September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Lawrence – Rouge Hills.JPG</PICTURE>
		<LAT>43.795080</LAT>
		<LNG>-79.131579</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
	<ID>W15315</ID>
		<PNAME>963 Martin Grove Road</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes 
		upgrading electrical cables, a transformer and tap box within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, 
		planned outages may be necessary to switch from the old to the new electrical system and we intend to provide  with advance notice. Our crews and contractors will take 
		extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line to the meter 
		base location. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules 
		permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>1</WARD>
		<TIMELINE>April 2019 - September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>963 Martin Grove Road.JPG</PICTURE>
		<LAT>43.695662</LAT>
		<LNG>-79.572123</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>X19265</ID>
		<PNAME>St. Luke Lane</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging electrical system in the community to help improve service reliability. The rebuild includes the replacement of the 
		existing transformer within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors will take extra care and precautions around 
		the property. Upon project completion, affected areas will be restored.</DESCRIPTION>
		<ACTIVITY>Network Electrical</ACTIVITY>
		<WARD>13</WARD>
		<TIMELINE>April 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>St. Luke Lane.JPG</PICTURE>
		<LAT>43.664156</LAT>
		<LNG>-79.384831</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>E16191</ID>
		<PNAME>Lawrence Avenue East Phase 2</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes 
		the replacement of existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this 
		project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors 
		will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of 
		the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>24</WARD>
		<TIMELINE>April 2019 - October 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Lawrence Avenue East Phase 2.JPG</PICTURE>
		<LAT>43.760932</LAT>
		<LNG>-79.221831</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
	<ID>E19183</ID>
		<PNAME>Lawrence Avenue East Transclosure Replacement</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes 
		the replacement of existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this 
		project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will 
		take extra care and	precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the 
		project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>21</WARD>
		<TIMELINE>April 2019 - October 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Lawrence Avenue East Transclosure Replacement.JPG</PICTURE>
		<LAT>43.742572</LAT>
		<LNG>-79.305373</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
	<ID>E20283</ID>
		<PNAME>Victoria Park – Thora</PNAME>
		<DESCRIPTION>We’re planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification 
		program. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews 
		and contractors will take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of 
		the overgrown trees on the public property allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>19</WARD>
		<TIMELINE>May 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Victoria Park – Thora.JPG</PICTURE>
		<LAT>43.690016</LAT>
		<LNG>-79.287660</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
	<ID>E19184</ID>
		<PNAME>1744 Midland Avenue</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes 
		replacing existing electrical cables and a transformer within the private property. Throughout this project, planned outages may be necessary to switch from the old to 
		the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions around property. The portion of the 
		driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>21</WARD>
		<TIMELINE>April 2019 - July 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>1744 Midland Avenue.JPG</PICTURE>
		<LAT>43.760663</LAT>
		<LNG>-79.269074</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
	<ID>E18043</ID>
		<PNAME>Conacher – Gustav</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes 
		upgrading existing electrical cables and replacing hydro poles and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. 
		Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and 
		contractors will take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the 
		property line to the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of 
		the project as season, weather and schedules permit. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<WARD>18</WARD>
		<TIMELINE>June 2019 - February 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Conacher – Gustav.JPG</PICTURE>
		<LAT>43.789394</LAT>
		<LNG>-79.396559</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19317</ID>
			<PNAME>Lid Replacement</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading 
			existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors will 
			take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line to 
			the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as 
			season, weather and schedules permit. </DESCRIPTION>
			<ACTIVITY>Underground Civil</ACTIVITY>
			<WARD>13</WARD>
			<TIMELINE>April 2019 - September 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Lid Replacement-13.JPG</PICTURE>
			<LAT>43.653876</LAT>
			<LNG>-79.371956</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>X19317</ID>
			<PNAME>Lid Replacement</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading 
			existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors will 
			take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line to 
			the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as 
			season, weather and schedules permit. </DESCRIPTION>
			<ACTIVITY>Underground Civil</ACTIVITY>
			<WARD>14</WARD>
			<TIMELINE>April 2019 - September 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Lid Replacement-14.JPG</PICTURE>
			<LAT>43.662378</LAT>
			<LNG>-79.329007</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>	
	<PROJECT>
		<ID>X19317</ID>
			<PNAME>Lid Replacement</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading 
			existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors will 
			take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line to 
			the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as 
			season, weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Underground Civil</ACTIVITY>
			<WARD>10</WARD>
			<TIMELINE>April 2019 - September 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Lid Replacement-10.JPG</PICTURE>
			<LAT>43.647710</LAT>
			<LNG>-79.371885</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>	
	<PROJECT>
		<ID>X19317</ID>
			<PNAME>Lid Replacement</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading 
			existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors will 
			take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line to 
			the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as 
			season, weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Underground Civil</ACTIVITY>
			<WARD>19</WARD>
			<TIMELINE>April 2019 - September 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Lid Replacement-19.JPG</PICTURE>
			<LAT>43.666498</LAT>
			<LNG>-79.308933</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>W17444</ID>
			<PNAME>Eglinton – Widdicombe Phase 1</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes 
			the replacement of the existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this 
			project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take 
			extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project 
			as season, weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<WARD>2</WARD>
			<TIMELINE>May 2019 - October 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Eglinton-Widdicombe.JPG</PICTURE>
			<LAT>43.677149</LAT>
			<LNG>-79.556798</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>W14082</ID>
			<PNAME>Wilmington – Trunk Phase 2</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes 
			existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned 
			outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and 
			precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, 
			weather and schedules permit. </DESCRIPTION>
			<ACTIVITY>Overhead and Unerground Electrical</ACTIVITY>
			<WARD>6</WARD>
			<TIMELINE>May 2019 - April 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Wilmington – Trunk Phase 2.JPG</PICTURE>
			<LAT>43.774367</LAT>
			<LNG>-79.469340</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>	
	<PROJECT>
		<ID>W20072</ID>
			<PNAME>Jamestown</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging backyard electrical system in the community with a front yard underground system. The rebuild includes the installation 
			of underground electrical cables, padmount transformers and tap boxes within the City of Toronto’s public property allowance. Our crews and contractors will take extra 
			care and precautions around the property. Please note that we may require access to the private property, including the backyard, to connect new lines and install an 
			underground duct from the property line to the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored 
			upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Underground Civil</ACTIVITY>
			<WARD>1</WARD>
			<TIMELINE>May 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Jamestown.JPG</PICTURE>
			<LAT>43.738347</LAT>
			<LNG>-79.588151</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>E17159</ID>
			<PNAME>Victoria Park – Ernest Phase 2</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes the 
			replacement of the existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this 
			project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take 
			extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line to the meter 
			base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather 
			and schedules permit.</DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<WARD>17</WARD>
			<TIMELINE>May 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Victoria Park – Ernest Phase 2.JPG</PICTURE>
			<LAT>43.791346</LAT>
			<LNG>-79.333817</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>W14769</ID>
			<PNAME>Highway 427 – Rathburn</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes the 
			replacement of existing electrical cables, switchgears and a transformer within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our 
			crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored 
			upon completion of the project as season, weather and schedules permit.  </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<WARD>2</WARD>
			<TIMELINE>April 2019 - October 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Highway 427– Rathburn.JPG</PICTURE>
			<LAT>43.654260</LAT>
			<LNG>-79.570797</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>X17600</ID>
			<PNAME>Avenue Road</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement 
			of the existing electrical cables within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may 
			be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions 
			around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.  </DESCRIPTION>
			<ACTIVITY>Underground Electrical</ACTIVITY>
			<WARD>12</WARD>
			<TIMELINE>May 2019 - November 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Avenue Road.JPG</PICTURE>
			<LAT>43.680825</LAT>
			<LNG>-79.399027</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>E19187</ID>
			<PNAME>Bellamy – Lawrence</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes the 
			replacement of existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this 
			project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will 
			take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the 
			project as season, weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<WARD>24</WARD>
			<TIMELINE>May 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Bellamy – Lawrence.JPG</PICTURE>
			<LAT>43.758543</LAT>
			<LNG>-79.235458</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>W14774</ID>
			<PNAME>Burnhamthorpe – Highway 427</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes 
			upgrading existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors 
			will take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line to 
			the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, 
			weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Underground Electrical</ACTIVITY>
			<WARD>2</WARD>
			<TIMELINE>May 2019 - July 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Burnhamthorpe – Highway 427.JPG</PICTURE>
			<LAT>43.645534</LAT>
			<LNG>-79.563221</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>W18213</ID>
			<PNAME>The West Mall</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes 
			upgrading overhead electrical cables and replacing hydro poles withinthe City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this 
			project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will 
			take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on 
			the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored. </DESCRIPTION>
			<ACTIVITY>Overhead Electrical</ACTIVITY>
			<WARD>2</WARD>
			<TIMELINE>May 2019 - June 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>The West Mall.JPG</PICTURE>
			<LAT>43.622100</LAT>
			<LNG>-79.559992</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>	
	<PROJECT>
		<ID>X21081</ID>
			<PNAME>Jameson Avenue Network Changeout</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading 
			existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors will 
			take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line to the 
			meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, 
			weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<WARD>4</WARD>
			<TIMELINE>July 2019 - August 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Jameson Avenue Network Changeout.JPG</PICTURE>
			<LAT>43.639385</LAT>
			<LNG>-79.437108</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>	
	<PROJECT>
		<ID>W10131</ID>
			<PNAME>Roselawn – Marlee</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes 
			existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned 
			outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and 
			precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, 
			weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<WARD>8</WARD>
			<TIMELINE>June 2019 - October 2020</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>Roselawn – Marlee.JPG</PICTURE>
			<LAT>43.701786</LAT>
			<LNG>-79.442483</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>E15482</ID>
			<PNAME>Midland – Townhaven Electrical</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading 
			existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned 
			outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and 
			precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, 
			weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Underground Electrical</ACTIVITY>
			<WARD>20</WARD>
			<TIMELINE>June 2019 - September 2020</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>Midland – Townhaven Electrical.JPG</PICTURE>
			<LAT>43.733112</LAT>
			<LNG>-79.258100</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>E17157</ID>
			<PNAME>Leslie – Finch</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead 
			electrical cables and replacing hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned 
			outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and 
			precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road 
			allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.</DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<WARD>17</WARD>
			<TIMELINE>June 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Leslie – Finch.JPG</PICTURE>
			<LAT>43.791838</LAT>
			<LNG>-79.364749</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>X19300</ID>
			<PNAME>Yonge – Wellesley Vault Rebuild</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging electrical system in the community to help improve service reliability. The rebuild  includes the replacement of the 
			existing vault within the City of Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors will take extra care and precautions 
			around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and 
			schedules permit.</DESCRIPTION>
			<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
			<WARD>13</WARD>
			<TIMELINE>April 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Yonge – Wellesley Vault Rebuild.JPG</PICTURE>
			<LAT>43.664874</LAT>
			<LNG>-79.384068</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>W18578</ID>
			<PNAME>Attwell</PNAME>
			<DESCRIPTION>We’re planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification 
			program. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews 
			and contractors will take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the 
			overgrown trees on the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.</DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<WARD>1</WARD>
			<TIMELINE>July 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Attwell.JPG</PICTURE>
			<LAT>43.704401</LAT>
			<LNG>-79.608422</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>X14688</ID>
			<PNAME>Dupont – Dufferin</PNAME>
			<DESCRIPTION>Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes 
			upgrading overhead electrical cables and replacing hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this 
			project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Toronto Hydro crews and contractors 
			will take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees 
			on the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.</DESCRIPTION>
			<ACTIVITY>Overhead Electrical</ACTIVITY>
			<WARD>21</WARD>
			<TIMELINE>January 2018 - May 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Dupont – Dufferin.JPG</PICTURE>
			<LAT>43.674604</LAT>
			<LNG>-79.431599</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>W20308</ID>
			<PNAME>Rogers – Blackthorn</PNAME>
			<DESCRIPTION>We’re planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification 
			program. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews 
			and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon 
			completion of the project as season, weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<WARD>9</WARD>
			<TIMELINE>July 2019 - October 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Rogers – Blackthorn.JPG</PICTURE>
			<LAT>43.683534</LAT>
			<LNG>-79.460407</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>X18264</ID>
			<PNAME>Runnymede Phase 4</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead 
			electrical cables and replacing hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot.  Throughout this project, planned 
			outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and 
			precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road 
			allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.</DESCRIPTION>
			<ACTIVITY>Overhead Electrical</ACTIVITY>
			<WARD>13</WARD>
			<TIMELINE>April 2019 – January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>RunnymedePh4.JPG</PICTURE>
			<LAT>43.655928</LAT>
			<LNG>-79.479795</LNG>
			<LIVE>Yes</LIVE>
			</PROJECT>
	<PROJECT>
			<ID>E20284</ID>
			<PNAME>Eastwood – Kimridge</PNAME>
			<DESCRIPTION>We’re planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification program.Throughout this project, 
			planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the 
			property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road allowance in order to accommodate new hydro infrastructure. 
			Upon project completion, affected areas will be restored.</DESCRIPTION>
			<ACTIVITY>Overhead Civil and Electrical</ACTIVITY>
			<WARD>20</WARD>
			<TIMELINE>June 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Eastwood – Kimridge.JPG</PICTURE>
			<LAT>43.694852</LAT>
			<LNG>-79.271310</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>X18126</ID>
			<PNAME>Emerson – Bloor</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes existing electrical cables and transformers 
			within the City of Toronto’s public property allowance in front of or adjacent to the lot.Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend 
			to provide advance notice.Our crews and contractors will take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the 
			property line to the meter base location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules 
			permit. </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<WARD>9</WARD>
			<TIMELINE>June 2019 - March 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Emerson – Bloor.JPG</PICTURE>
			<LAT>43.658754</LAT>
			<LNG>-79.440760</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>n/a</ID>
			<PNAME>Marion Street</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables and 
			transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical 
			system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property. Please note that we may require access to the property to install an underground 
			duct. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<WARD>4</WARD>
			<TIMELINE>May 2019 – July 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>158 Marion.JPG</PICTURE>
			<LAT>43.640876</LAT>
			<LNG>-79.447908</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>X18127</ID>
			<PNAME>Powerlite Switch Replacement Revised Timeline</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables and transformers within
			the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide
			advance notice. Our crews and contractors will take extra care and precautions around the property. Please note that our contractor may require access to the property to replace the meter and meterbase on or
			within the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Underground Electrical</ACTIVITY>
			<WARD>9</WARD>
			<TIMELINE>March 2020 - November 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Powerlite Switch Replacement.JPG</PICTURE>
			<LAT>43.657194</LAT>
			<LNG>-79.448160</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>X18267</ID>
			<PNAME>Runnymede Phase 1</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables within the City of
			Toronto’s public property allowance in front of or adjacent to the lot. Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected
			by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
			<WARD>13</WARD>
			<TIMELINE>March 2018 - September 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>RunnymedePh1.JPG</PICTURE>
			<LAT>43.663415</LAT>
			<LNG>-79.463686</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>N/A</ID>
			<PNAME>108 Dunvegan</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes 
			existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned 
			outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and 
			precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, 
			weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<WARD>12</WARD>
			<TIMELINE>May 2019 - July 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>108 Dunvegan.JPG</PICTURE>
			<LAT>43.690538</LAT>
			<LNG>-79.406139</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>W14078</ID>
			<PNAME>Wilmington – Trunk Phase 4</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead 
			electrical cables and replacing hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned 
			outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and 
			precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on the public road 
			allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.</DESCRIPTION>
			<ACTIVITY>Overhead Electrical</ACTIVITY>
			<WARD>6</WARD>
			<TIMELINE>June 2019 - November 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Wilmington - Trunk Phase 4.jpg</PICTURE>
			<LAT>43.767011</LAT>
			<LNG>-79.459759</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
			<PNAME>16 Sesame Street</PNAME>
			<DESCRIPTION>Please be advised that as a result of construction at 16 Sesame Street, we’ll be replacing the existing electrical cables and transformers within the City of 
			Toronto’s public property allowance in front of or adjacent to the lot in order to provide safe clearance.  Throughout this project, planned outages may be necessary to 
			switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the 
			property. Please note that we may require access to the property to install an underground duct from the property line to the meter base location at the home. The portion 
			of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
			<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
			<WARD>22</WARD>
			<TIMELINE>May 2019 - June 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>16 Sesame Street.jpg</PICTURE>
			<LAT>43.782437</LAT>
			<LNG>-79.322335</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>W14075</ID>
			<PNAME>Wilmington – Trunk Phase 3</PNAME>
			<DESCRIPTION>We’re planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes replacement of the 
			overhead electrical cables, transformers and hydro poles within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this 
			project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will 
			take extra care and precautions around the property. Please be advised that as a result of the project, our contractor may be trimming a number of the overgrown trees on 
			the public road allowance in order to accommodate new hydro infrastructure. Upon project completion, affected areas will be restored.
	</DESCRIPTION>
			<ACTIVITY>Overhead Electrical</ACTIVITY>
			<WARD>6</WARD>
			<TIMELINE>May 2019 - March 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Wilmington – Trunk Phase 3.jpg</PICTURE>
			<LAT>43.766077</LAT>
			<LNG>-79.451433</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>E18582</ID>
			<PNAME>Chemical Court</PNAME>
			<DESCRIPTION>We’re planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification 
			program.Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews 
			and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored 
			upon completion of the project as season, weather and schedules permit.
	</DESCRIPTION>
			<ACTIVITY>Overhead Electrical</ACTIVITY>
			<WARD>25</WARD>
			<TIMELINE>August 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Chemical Court.jpg</PICTURE>
			<LAT>43.765335</LAT>
			<LNG>-79.162841</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
			<PNAME>1124 Islington Avenue</PNAME>
			<DESCRIPTION>Please be advised that as a result of construction at 1124 Islington Avenue, we’ll be replacing the existing electrical cables and hydro poles within the City of 
			Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new 
			electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property. Please be advised that as a 
			result of the project, our contractor may be trimming a number of the overgrown trees on the public road allowance in order to accommodate new hydro infrastructure. Upon 
			project completion, affected areas will be restored.</DESCRIPTION>
			<ACTIVITY>Overhead Civil and Electrical</ACTIVITY>
			<WARD>3</WARD>
			<TIMELINE>June 2020 – September 2020</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>1124 Islington Avenue.jpg</PICTURE>
			<LAT>43.638331</LAT>
			<LNG>-79.521008</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>THR2016-00048OT</ID>
			<PNAME>Bloor-Church Cable Chamber Rebuild</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the underground electrical system in the community. The project includes the reconstruction of 
			existing cable chambers within the city-owned property. </DESCRIPTION>
			<ACTIVITY>Underground Civil</ACTIVITY>
			<WARD>11</WARD>
			<TIMELINE>June 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Bloor-Church Cable Chamber Rebuild.jpg</PICTURE>
			<LAT>43.670182</LAT>
			<LNG>-79.386560</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>E19170</ID>
			<PNAME>Warkwick – Midland Transclosure Replacement</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service 
			reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<TIMELINE>June 2019 - September 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Warkwick – Midland Transclosure Replacement.jpg</PICTURE>
			<LAT>43.752965</LAT>
			<LNG>-79.273014</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>E20297</ID>
			<PNAME>Kingston Road Revised Timeline</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for 
			the GO Expansion Electrification program.</DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<TIMELINE>March 2020 - December 2020</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>Kingston Road.jpg</PICTURE>
			<LAT>43.756216</LAT>
			<LNG>-79.199151</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
			<PNAME>675 Commissioners Street</PNAME>
			<DESCRIPTION>Please be advised that as a result of construction at 675 Commissioners Street, we’ll be replacing the existing electrical cables, hydro poles and 
			transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<TIMELINE>June 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>675 Commissioners Street.jpg</PICTURE>
			<LAT>43.657853</LAT>
			<LNG>-79.327341</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
			<PNAME>Broadview – Danforth</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
			The rebuild includes the replacement of an existing vault roof within the city-owned property near the lot.</DESCRIPTION>
			<ACTIVITY>Underground Civil</ACTIVITY>
			<TIMELINE>June 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Broadview – Danforth.jpg</PICTURE>
			<LAT>43.676331</LAT>
			<LNG>-79.358693</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>X15017,X15281</ID>
			<PNAME>Queen - Carlaw</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The 
			rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
			<ACTIVITY>Overhead Electrical</ACTIVITY>
			<TIMELINE>September 2019 - June 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Queen - Carlaw.jpg</PICTURE>
			<LAT>43.664831</LAT>
			<LNG>-79.324431</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>E18050</ID>
			<PNAME>Bannatyne - Leslie</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The 
			rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot. </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Electrical</ACTIVITY>
			<TIMELINE>July 2019 - November 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Bannatyne - Leslie.jpg</PICTURE>
			<LAT>43.764297</LAT>
			<LNG>-79.365088</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>E20294</ID>
			<PNAME>Eglinton – Bellamy</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for 
			the GO Expansion Electrification program. </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<TIMELINE>July 2019 - July 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Eglinton-Bellamy.jpg</PICTURE>
			<LAT>43.741209</LAT>
			<LNG>-79.231741</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>W19350</ID>
			<PNAME>Steeles Avenue - Alness</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for 
			the GO Expansion Electrification program. </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<TIMELINE>September 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Steeles Avenue - Alness.jpg</PICTURE>
			<LAT>43.784131</LAT>
			<LNG>-79.482812</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
			<PNAME>442 Russell Hill Road</PNAME>
			<DESCRIPTION>Please be advised that as a result of construction at 442 Russell Hill Road, we’ll be replacing hydro poles and cables within the City of Toronto’s public 
			property allowance in front of or adjacent to the lot in order to provide safe clearance.</DESCRIPTION>
			<ACTIVITY>Underground Civil</ACTIVITY>
			<TIMELINE>August 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>442 Russell Hill Road.jpg</PICTURE>
			<LAT>43.695098</LAT>
			<LNG>-79.412165</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>C-190057-X10501-HS023</ID>
			<PNAME>100 Vaughan Road</PNAME>
			<DESCRIPTION>Please be advised that as a result of construction at 100 Vaughan Road, we’ll be placing a new hydro pole and cables within the City of Toronto’s public 
			property allowance in front of or adjacent to the lot in order to provide safe clearance. Our crews and contractors will take extra care and precautions around the 
			property. Upon project completion, affected areas will be restored. </DESCRIPTION>
			<ACTIVITY>Overhead Civil and Electrical</ACTIVITY>
			<TIMELINE>September 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>100 Vaughan Road.jpg</PICTURE>
			<LAT>43.683916</LAT>
			<LNG>-79.421229</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>E19185</ID>
			<PNAME>Progress Avenue Transclosure Replacement</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
			The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access 
			to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
			<TIMELINE>July 2019 - October 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Progress Avenue Transclosure Replacement.jpg</PICTURE>
			<LAT>43.769682</LAT>
			<LNG>-79.281000</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>	
	<PROJECT>
		<ID>X19330</ID>
			<PNAME>Gerrard - Bay</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help 
			improve service reliability. The rebuild includes cable chamber rebuilds and feeder upgrades within the city-owned property near the lot. 
			Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main 
			electrical line.</DESCRIPTION>
			<ACTIVITY>Underground Wire Upgrade</ACTIVITY>
			<TIMELINE>July 2019 - November 2019</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Terauley A94A Cable Chamber Rebuilds.jpg</PICTURE>
			<LAT>43.658250</LAT>
			<LNG>-79.385408</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>X18457</ID>
			<PNAME>King Street - Jarvis</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
			The rebuild includes the relocation of existing underground cables within the city-owned property near the lot. </DESCRIPTION>
			<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
			<TIMELINE>June 2019 - January 2020</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>King Street - Jarvis.jpg</PICTURE>
			<LAT>43.650416</LAT>
			<LNG>-79.372287</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
	<ID>E19171</ID>
		<PNAME>Midland – Dorcot Transclosure Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access 
		to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2019 - October 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Midland – Dorcot Transclosure Replacement.png</PICTURE>
		<LAT>43.768465</LAT>
		<LNG>-79.266783</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>N/A</ID>
		<PNAME>451 Patricia Avenue</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction at 451 Patricia Avenue, we’ll be replacing hydro poles and cables within the City of Toronto’s public 
		property allowance in front of or adjacent to the lot. A planned power interruption may be necessary to transfer to the new service and we intend to provide advance notice. 
		Our crews and contractors will take extra care and precautions around the property. Upon project completion, affected areas will be restored.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<TIMELINE>July 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>451 Patricia Avenue.jpg</PICTURE>
		<LAT>43.784666</LAT>
		<LNG>-79.443159</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>E18099</ID>
		<PNAME>McNicoll Trunk</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>July 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>McNicoll Trunk.jpg</PICTURE>
		<LAT>43.805238</LAT>
		<LNG>-79.299579</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>W15640,W16415</ID>
		<PNAME>Highway 401 – Renforth MTO Feeder Relocation</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the electrical system in the community. The project includes the relocation of existing electrical 
		cables and civil ducts.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>July 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Highway 401 – Renforth MTO Feeder Relocation.jpg</PICTURE>
		<LAT>43.671776</LAT>
		<LNG>-79.592147</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>W19349</ID>
		<PNAME>Finch – Chesswood</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for 
		the GO Expansion Electrification program. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Finch – Chesswood.jpg</PICTURE>
		<LAT>43.765483</LAT>
		<LNG>-79.481368</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>N/A</ID>
		<PNAME>Old York Mills - Yonge Street</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The 
		rebuild includes the replacement of padmount switchgears within the city-owned property near the lot.  </DESCRIPTION>
		<ACTIVITY>Underground Electrical</ACTIVITY>
		<TIMELINE>July 2019 - August 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Old York Mills - Yonge Street.jpg</PICTURE>
		<LAT>43.743915</LAT>
		<LNG>-79.406121</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
	<ID>W16290</ID>
		<PNAME>Westmount Phase 7B - South Complex</PNAME>
		<DESCRIPTION>Please be advised that we’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild 
		includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the 
		property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>July 2019 - October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Westmount Phase 7B - South Complex.jpg</PICTURE>
		<LAT>43.699238</LAT>
		<LNG>-79.546388</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E19165</ID>
		<PNAME>Ellesmere - Midland</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The 
		rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<TIMELINE>July 2019 - October 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Ellesmere - Midland.jpg</PICTURE>
		<LAT>43.763112</LAT>
		<LNG>-79.272166</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>68 Daisy Avenue</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction at 68 Daisy Avenue, we’ll be replacing hydro poles and transformers within the City of Toronto’s public 
		property allowance in front of or adjacent to the lot. A planned power interruption may be necessary to transfer to the new service and we intend to provide advance 
		notice. Our crews and contractors will take extra care and precautions around the property. Upon project completion, affected areas will be restored. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>68 Daisy Avenue.jpg</PICTURE>
		<LAT>43.597741</LAT>
		<LNG>-79.528567</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X15534</ID>
		<PNAME>George Duke SCADA Switch Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of overhead switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical</ACTIVITY>
		<TIMELINE>July 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>George Duke SCADA Switch Replacement.jpg</PICTURE>
		<LAT>43.651388</LAT>
		<LNG>-79.370424</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18368,X19318</ID>
		<PNAME>Esplanade Load Relief - Revised Timeline</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to transfer electricity loads in the community to help improve power distribution and service reliability. 
		The rebuild will include some civil construction in strategic areas and the replacement of electrical cables within the city-owned property near the lot. Please note 
		that we may also require access to the property to replace electrical cables. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 – June 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Esplande Load Relief.jpg</PICTURE>
		<LAT>43.655994</LAT>
		<LNG>-79.383718</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20293</ID>
		<PNAME>Brimley – Lombardy</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for 
		the GO Expansion Electrification program. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Brimley – Lombardy.jpg</PICTURE>
		<LAT>43.730910</LAT>
		<LNG>-79.246271</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E18579</ID>
		<PNAME>Poplar Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for 
		the GO Expansion Electrification program. </DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Poplar Road.jpg</PICTURE>
		<LAT>43.757752</LAT>
		<LNG>-79.187247</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E18576</ID>
		<PNAME>Manse – Copperfield</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for 
		the GO Expansion Electrification program. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Manse – Copperfield.jpg</PICTURE>
		<LAT>43.760770</LAT>
		<LNG>-79.172173</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Village Green – Kennedy</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of an existing padmount switchgear within the private property. </DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Village Green – Kennedy.jpg</PICTURE>
		<LAT>43.778289</LAT>
		<LNG>-79.284667</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X14594</ID>
		<PNAME>Wellesley – Bay</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access 
		to the property to install an underground pipe that connects the meter at the home to the main electrical line. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - May 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Wellesley – Bay.jpg</PICTURE>
		<LAT>43.664212</LAT>
		<LNG>-79.388144</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X15255</ID>
		<PNAME>Danforth – Cedarvale</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access 
		to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2019 - September 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Danforth – Cedarvale.jpg</PICTURE>
		<LAT>43.686091</LAT>
		<LNG>-79.310534</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E17086</ID>
		<PNAME>Boydwood</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement 
		of the existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. Throughout this project, 
		planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra 
		care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property line to the meter base 
		location at the home. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and 
		schedules permit. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<TIMELINE>January 2019 - July 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Boydwood.jpg</PICTURE>
		<LAT>43.804524</LAT>
		<LNG>-79.157934</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20300</ID>
		<PNAME>Ellesmere – Zezel Way</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for 
		the GO Expansion Electrification program. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Ellesmere – Zezel Way.jpg</PICTURE>
		<LAT>43.766167</LAT>
		<LNG>-79.275197</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20305</ID>
		<PNAME>Weston – Humberview</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for 
		the GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Weston – Humberview.jpg</PICTURE>
		<LAT>43.706675</LAT>
		<LNG>-79.534090</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19208</ID>
		<PNAME>Moss Park</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The 
		rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the 
		property to install an underground pipe that connects the meter at the home to the main electrical line. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Moss Park.jpg</PICTURE>
		<LAT>43.651543</LAT>
		<LNG>-79.375042</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>105 Eringate Drive</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction at 105 Eringate Drive, we’ll be replacing hydro poles, cables, and switches within the City of Toronto’s 
		public property allowance in front of or adjacent to the lot. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system 
		and we intend to provide you with advance notice. Our crews and contractors will take extra care and precautions around the property. Upon project completion, affected 
		areas will be restored. </DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>July 2019 - August 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>105 Eringate Drive.jpg</PICTURE>
		<LAT>43.659293</LAT>
		<LNG>-79.582027</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190546</ID>
		<PNAME>Panorama - Kipling</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The 
		rebuild includes the replacement of existing electrical cables within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - October 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Panorama - Kipling.jpg</PICTURE>
		<LAT>43.746822</LAT>
		<LNG>-79.581929</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
		<ID>P-195000-ED166003-024</ID>
		<PNAME>Lawrence - Leslie Switch Gear Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The 
		rebuild includes the replacement of existing electrical switches within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - October 2019</TIMELINE>
		<PSTATUS>completed</PSTATUS>
		<PICTURE>Lawrence - Leslie.jpg</PICTURE>
		<LAT>43.716931</LAT>
		<LNG>-79.375340</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
		<ID>1000020700</ID>
		<PNAME>45 Bulwer Street</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction at 45 Bulwer Street, we’ll be placing ducts underground within the City of Toronto’s public property 
		allowance in front of or adjacent to the lot in order to provide safe clearance.Our crews and contractors will take extra care and precautions around the property. 
		Upon project completion, affected areas will be restored.</DESCRIPTION>
		<ACTIVITY>Underground Civil Electrical Work</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>45 Bulwer Street.jpg</PICTURE>
		<LAT>43.649666</LAT>
		<LNG>-79.396195</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X15511</ID>
		<PNAME>Bay – St. Joseph</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The 
		rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the 
		property to install an underground pipe that connects the meter at the home to the main electrical line. </DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Bay – St. Joseph.jpg</PICTURE>
		<LAT>43.666286</LAT>
		<LNG>-79.387343</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-160127,C-180608</ID>
		<PNAME>Stanley Greene</PNAME>
		<DESCRIPTION>We’re planning to expand our existing underground electrical system in the community to help improve service reliability. This expansion includes the 
		replacement of existing electrical cables and tap boxes. Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and 
		we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property. The portion of the driveway, sidewalk and other 
		areas affected by our work will be restored upon completion of the project as season, weather and schedules permit. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<TIMELINE>July 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Stanley Greene.jpg</PICTURE>
		<LAT>43.734291</LAT>
		<LNG>-79.478326</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E17570</ID>
		<PNAME>Finch - Don Mills</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The 
		rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Finch - Don Mills.jpg</PICTURE>
		<LAT>43.757657</LAT>
		<LNG>-79.416891</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E17571</ID>
		<PNAME>Lawrence - Kennedy</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The 
		rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Lawrence - Kennedy.jpg</PICTURE>
		<LAT>43.724913</LAT>
		<LNG>-79.339455</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18160</ID>
		<PNAME>Church – King Street Rebuild</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead underground electrical system in the community to help improve service 
		reliability. The rebuild includes the replacement of existing electrical cables, transformers and hydro poles within the city-owned property near the lot. Please note that 
		we may require access to the property to upgrade the overhead service conductor that connects the meter at the home to the main electrical line. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 - September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Church – King Street Rebuild.jpg</PICTURE>
		<LAT>43.707161</LAT>
		<LNG>-79.515192</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>1000076178</ID>
		<PNAME>170 The West Mall</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s residence at 170 The West Mall, we’ll be replacing a hydro pole and cables within the 
		City of Toronto’s public property allowance in front of or adjacent to the lot in order to provide safe clearance. A planned power interruption will be necessary to 
		transfer to the new service. Our crews and contractors will take extra care and precautions around the property. Upon project completion, affected areas will be restored. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>170 The West Mall.jpg</PICTURE>
		<LAT>43.624798</LAT>
		<LNG>-79.558035</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19160</ID>
		<PNAME>40 King Street West</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The 
		rebuild includes the replacement of existing electrical cables and vaults within the city-owned property near the lot. Please note that we may require access to the 
		property to install an underground pipe that connects the meter at the home to the main electrical line. </DESCRIPTION>
		<ACTIVITY>Network Civil and Electrical</ACTIVITY>
		<TIMELINE>September 2019 - May 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>40 King Street West.jpg</PICTURE>
		<LAT>43.649642</LAT>
		<LNG>-79.376440</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X14685</ID>
		<PNAME>John Street Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help
		improve service reliability. The rebuild includes replacement of existing ductbanks, cable chambers and electrical cables within the 
		city-owned property near the lot. The work will take place in conjunction with the City of Toronto’s planned reconstruction to improve 
		the John Street Corridor as part of the Council-endorsed “Cultural Corridor.”</DESCRIPTION>
		<ACTIVITY>Undergorund Civil</ACTIVITY>
		<TIMELINE>November 2019 - May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>John Street Phase 2.jpg</PICTURE>
		<LAT>43.646998</LAT>
		<LNG>-79.389601</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>MSO-1904</ID>
		<PNAME>Bloor - Armadale</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The 
		work includes vault roof rebuild within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Network Civil</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Bloor - Armadale.jpg</PICTURE>
		<LAT>43.649759</LAT>
		<LNG>-79.482258</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W14082</ID>
		<PNAME>Wilmington – Trunk, Phase 2B</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service 
		reliability. The rebuild includes existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot. </DESCRIPTION>
		<ACTIVITY>Overhead Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Wilmington–Trunk Phase 2B.jpg</PICTURE>
		<LAT>43.781738</LAT>
		<LNG>-79.469584</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>MSO - 1905</ID>
		<PNAME>Glengrove - Rosewell</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The 
		work includes vault roof rebuild within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Glengrove Ave W - Rosewell Ave.jpg</PICTURE>
		<LAT>43.716721</LAT>
		<LNG>-79.413306</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W13291</ID>
		<PNAME>Wilson - Highway 400</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help 
		improve service reliability. The rebuild includes upgrading underground electrical cables within city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<TIMELINE>August 2019 - December 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Wilson - Highway 400.jpg</PICTURE>
		<LAT>43.717769</LAT>
		<LNG>-79.521477</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18576</ID>
		<PNAME>Attwell – Carlingview</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead electrical system in the community in preparation for the GO 
		Expansion Electrification program. </DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Attwell – Carlingview.jpg</PICTURE>
		<LAT>43.700367</LAT>
		<LNG>-79.599578</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18581</ID>
		<PNAME>Gardiner Expressway – Park Lawn</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for 
		the GO Expansion Electrification program. </DESCRIPTION>
		<ACTIVITY>Overhead and Undergorund Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Gardiner Expressway – Park Lawn.jpg</PICTURE>
		<LAT>43.621326</LAT>
		<LNG>-79.493616</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20282</ID>
		<PNAME>Lawrence – Treelawn</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for 
		the GO Expansion Electrification program. </DESCRIPTION>
		<ACTIVITY>Overhead and Undergorund Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>December 2019 - March 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Lawrence–Treelawn.jpg</PICTURE>
		<LAT>43.711135</LAT>
		<LNG>-79.467360</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>4 Tippett Road</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction at 4 Tippett Road, we’ll be replacing hydro poles and cables within the City of Toronto’s public property 
		allowance in front of or adjacent to the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Undergorund Civil and Electrical</ACTIVITY>
		<TIMELINE>August 2019 - October 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>4 Tippett Road.jpg</PICTURE>
		<LAT>43.732176</LAT>
		<LNG>-79.446400</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>5250 Yonge Street</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction at 5250 Yonge Street, we’ll be replacing hydro poles and vaults within the City of Toronto’s public property 
		allowance in front of or adjacent to the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Undergorund Civil and Electrical</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>5250 Yonge Street.jpg</PICTURE>
		<LAT>43.770620</LAT>
		<LNG>-79.414623</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20286</ID>
		<PNAME>Midland – Olga</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the 
		GO Expansion Electrification program. </DESCRIPTION>
		<ACTIVITY>Overhead and Undergorund Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Midland – Olga.jpg</PICTURE>
		<LAT>43.723617</LAT>
		<LNG>-79.252822</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E12476,E16157</ID>
		<PNAME>Middlefield-Passmore (Electrical)</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The 
		rebuild includes the replacement of existing electrical cables, transformers and switchgear within the city-owned property near the lot. Please note that we may require 
		access to the property to install an underground pipe that connects the meter at the home to the main electrical line. </DESCRIPTION>
		<ACTIVITY>Undergorund Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 - November 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Middlefield- Passmore.jpg</PICTURE>
		<LAT>43.828794</LAT>
		<LNG>-79.257603</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X13186</ID>
		<PNAME>Greenwood - Bloomfield</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The 
		rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Greenwood - Bloomfield.jpg</PICTURE>
		<LAT>43.671683</LAT>
		<LNG>-79.328340</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>27 Parliament</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead electrical system in the community in preparation for the GO Expansion 
		Electrification program. </DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>27 Parliament.jpg</PICTURE>
		<LAT>43.648663</LAT>
		<LNG>-79.361318</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>THR2018-00030CT</ID>
		<PNAME>Millwood – Southvale</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The 
		rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Millwood – Southvale.jpg</PICTURE>
		<LAT>43.703334</LAT>
		<LNG>-79.361229</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-195000-ED166003-014</ID>
		<PNAME>Seneca Hill Drive – Don Mills Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The 
		rebuild includes upgrading overhead electrical components and replacing hydro poles on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - November 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Seneca Hill Drive – Don Mills Road.jpg</PICTURE>
		<LAT>43.788236</LAT>
		<LNG>-79.348394</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-160126-ZD1051</ID>
		<PNAME>30 Tippett Road</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction at 30 Tippett Road, we’ll be replacing hydro poles and cables within the City of Toronto’s public 
		property allowance in front of or adjacent to the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>30 Tippett Road.jpg</PICTURE>
		<LAT>43.735738</LAT>
		<LNG>-79.447058</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P0138337</ID>
		<PNAME>62 Sandrift Square</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction at 62 Sandrift Square, we’ll be replacing tap boxes and cables within the City 
		of Toronto’s public property allowance in front of or adjacent to the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>62 Sandrift Square.jpg</PICTURE>
		<LAT>43.792701</LAT>
		<LNG>-79.212723</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E18560</ID>
		<PNAME>Birchmount Recloser Installation</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The 
		rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Birchmount Recloser Installation.jpg</PICTURE>
		<LAT>43.787654</LAT>
		<LNG>-79.301086</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-195000-WD166004-005</ID>
		<PNAME>Apollo Place - Keele Street Revised Timeline</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The 
		rebuild includes the replacement of existing electrical cables and switchgear within the city-owned property near the lot. Please note that we may require access to the 
		property to install an underground pipe that connects the meter at the home to the main electrical line. </DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 - February 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Apollo Place - Keele St.jpg</PICTURE>
		<LAT>43.773706</LAT>
		<LNG>-79.485698</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20288</ID>
		<PNAME>Castlefield – Kincort</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead electrical system in the community in preparation for the GO Expansion 
		Electrification program. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2019 - February 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Castlefield – Kincort.jpg</PICTURE>
		<LAT>43.698260</LAT>
		<LNG>-79.464262</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>MSO - 1906</ID>
		<PNAME>Grace Street</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The 
		work includes the replacement of an existing vault roof within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<TIMELINE>October 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Grace Street.jpg</PICTURE>
		<LAT>43.656828</LAT>
		<LNG>-79.416376</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X14493</ID>
		<PNAME>Yonge- Wood Street</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The 
		rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the 
		property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<TIMELINE>August 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Yonge- Wood Street.jpg</PICTURE>
		<LAT>43.662516</LAT>
		<LNG>-79.383168</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18364</ID>
		<PNAME>Danforth 4kv Conversion Phase 1</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The 
		rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical</ACTIVITY>
		<TIMELINE>October 2019 - June 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Hanson - Coxwell.jpg</PICTURE>
		<LAT>43.681784</LAT>
		<LNG>-79.322674</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E18561</ID>
		<PNAME>Collingsbrook – Pharmacy</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The 
		rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical</ACTIVITY>
		<TIMELINE>October 2019 – January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Collingsbrook – Pharmacy.jpg</PICTURE>
		<LAT>43.787574</LAT>
		<LNG>-79.322859</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E15027</ID>
		<PNAME>Braymore Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help 
		improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned 
		property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the 
		home to the main electrical line. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<TIMELINE>October 2019 - July 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Braymore Phase 2.jpg</PICTURE>
		<LAT>43.806618</LAT>
		<LNG>-79.174069</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20303</ID>
		<PNAME>Lawrence – Jenkinson</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help 
		improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned 
		property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the 
		home to the main electrical line. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2019 – July 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Lawrence – Jenkinson.jpg</PICTURE>
		<LAT>43.750338</LAT>
		<LNG>-79.270122</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190070-X53601-LR016</ID>
		<PNAME>55 Charles Street </PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s residence at 55 Charles Street, we’ll be installing 
		hydro poles and placing ducts underground within the City of Toronto’s public property allowance in front of or adjacent to the
		lot. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>55 Charles Street.jpg</PICTURE>
		<LAT>43.668883</LAT>
		<LNG>-79.383505</LNG>
		<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>W20309</ID>
		<PNAME>Goddard – Ray</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in 
		the community in preparation for the GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>December 2019 - May 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>55 Charles Street.jpg</PICTURE>
		<LAT>43.690144</LAT>
		<LNG>-79.493275</LNG>
		<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
		<ID>C-163032-ZD1911</ID>
		<PNAME>Danforth – Warden</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community. The rebuild includes the relocation of 
		existing electrical cables and hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2019 - June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Danforth – Warden.jpg</PICTURE>
		<LAT>43.697272</LAT>
		<LNG>-79.274891</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Glen Echo - Yonge Street</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild an aging underground electrical infrastructure in the community to help improve service 
		reliability. The rebuild involves the rebuild of a vault roof on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil Upgrade</ACTIVITY>
		<TIMELINE>September 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Glen Echo - Yonge Street.jpg</PICTURE>
		<LAT>43.734544</LAT>
		<LNG>-79.401904</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>2 Gibbs Road</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s residence at 2 Gibbs Road, Toronto Hydro will be rebuilding the aging overhead 
		electrical system within the City of Toronto’s public property allowance in front of or adjacent to the lot. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>2 Gibbs Road.jpg</PICTURE>
		<LAT>43.637052</LAT>
		<LNG>-79.557158</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>THR2018-00142OT</ID>
		<PNAME>Industrial - Laird</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of existing electrical cables and replacing hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2019 - February 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Industrial - Laird.jpg</PICTURE>
		<LAT>43.707468</LAT>
		<LNG>-79.362167</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E19202</ID>
		<PNAME>St. Clair - Victoria Park</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. 
		The rebuild includes upgrading some overhead equipment on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 – January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>St. Clair - Victoria Park.jpg</PICTURE>
		<LAT>43.695889</LAT>
		<LNG>-79.297587</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E18211</ID>
		<PNAME>Eglinton - Midland</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of existing electrical cables, transformers and tap boxes within the city-owned property near the lot. Please note that we may 
		require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>October 2019 - June 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Eglinton - Midland.jpg</PICTURE>
		<LAT>43.736671</LAT>
		<LNG>-79.256093</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18096</ID>
		<PNAME>Carlaw – Gerrard Phase 3</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to
		help improve service reliability. The rebuild includes the replacement of existing electrical cables within the city-owned property
		near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2019 - June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Carlaw – Gerrard Phase 3.jpg</PICTURE>
		<LAT>43.665988</LAT>
		<LNG>-79.346759</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X17377</ID>
		<PNAME>Hammersmith Phase 3</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help 
		improve service reliability. The rebuild includes the replacement of the existing electrical cables and replacing hydro poles within the
		city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2019 - December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Hammersmith Phase 3.jpg</PICTURE>
		<LAT>43.673444</LAT>
		<LNG>-79.297009</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W19058</ID>
		<PNAME>Bathurst - Finch</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service 
		reliability. The rebuild includes the replacement of existing electrical cables and hydro poles within the city-owned property near the lot. Please note that we may 
		require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2019 – October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Bathurst - Finch.jpg</PICTURE>
		<LAT>43.775582</LAT>
		<LNG>-79.435642</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-X10501-HN025</ID>
		<PNAME>Dufferin - Dundas</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s residence on Dufferin Street, Toronto Hydro is planning to rebuild the aging 
		underground electrical system. The rebuild includes the replacement of existing electrical cables within the city-owned property near the lot. Please note that we 
		may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2019 – January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Dufferin - Dundas.jpg</PICTURE>
		<LAT>43.647763</LAT>
		<LNG>-79.431220</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Calderstone Crescent</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s residence on Calderstone Crescent, we’ll be replacing the electrical cables 
		and a tap box within the City of Toronto’s public property allowance in front of or adjacent to the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Calderstone Crescent.jpg</PICTURE>
		<LAT>43.793344</LAT>
		<LNG>-79.141444</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20313</ID>
		<PNAME>Staffordshire – Thirtieth Street</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead electrical system in the community in preparation for the 
		GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - February 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Staffordshire – Thirtieth Street.jpg</PICTURE>
		<LAT>43.598838</LAT>
		<LNG>-79.531385</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20304</ID>
		<PNAME>Arsandco Park – Lawrence Avenue West</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead electrical system in the community in preparation for the 
		GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Arsandco Park – Lawrence Avenue West.jpg</PICTURE>
		<LAT>43.748350</LAT>
		<LNG>-79.270718</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190513-WD163006-015</ID>
		<PNAME>Strachan – Wellington</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. 
		The rebuild includes replacing hydro poles and support wires on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Strachan – Wellington.jpg</PICTURE>
		<LAT>43.641508</LAT>
		<LNG>-79.411752</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180240-W18401-HR029</ID>
		<PNAME>Cavell – Burlington Civil</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the underground electrical system in the community in preparation for the 
		GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<TIMELINE>November 2019 – March 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Cavell – Burlington Civil.jpg</PICTURE>
		<LAT>43.617284</LAT>
		<LNG>-79.493973</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E16222</ID>
		<PNAME>Don Mills - McNicoll</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability.
		The rebuild includes the replacement of transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - June 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Don Mills - McNicoll.jpg</PICTURE>
		<LAT>43.800298</LAT>
		<LNG>-79.349507</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18042</ID>
		<PNAME>Dafoe – Strachan Phase 4 Revised Timeline</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. 
		The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Dafoe – Strachan Phase 4.jpg</PICTURE>
		<LAT>43.643564</LAT>
		<LNG>-79.422543</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W14203</ID>
		<PNAME>Browns line- Burlingame</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. 
		The rebuild includes upgrading overhead electrical cables and hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019- March 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Browns line- Burlingame.jpg</PICTURE>
		<LAT>43.608016</LAT>
		<LNG>-79.538009</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P0103390</ID>
		<PNAME>Ranee - Dufferin Phase 1</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. 
		The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Ranee - Dufferin Phase 1.jpg</PICTURE>
		<LAT>43.722914</LAT>
		<LNG>-79.451093</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X20111</ID>
		<PNAME>College – McCaul</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of existing electrical cables within the city-owned property near the lot. Please note that we may require access to the property
		to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>College – McCaul.jpg</PICTURE>
		<LAT>43.658886</LAT>
		<LNG>-79.392454</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19261</ID>
		<PNAME>Simcoe Network Changeout</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of existing electrical cables within the city-owned property near the lot. Please note that we may require access to the property 
		to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Network Changeout</ACTIVITY>
		<TIMELINE>November 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Simcoe Network Changeout.jpg</PICTURE>
		<LAT>43.656095</LAT>
		<LNG>-79.389200</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E18100/E19045</ID>
		<PNAME>McNicoll Trunk Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability.
		The rebuild includes the replacement of the existing electrical cables, tap boxes and a transformer within the city-owned property near the lot.  
		Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2019 - December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>McNicoll Trunk Phase 2.jpg</PICTURE>
		<LAT>43.804402</LAT>
		<LNG>-79.309248</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20291</ID>
		<PNAME>Humberline Load Transfer</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property on Humberline Drive, Toronto Hydro will be installing hydro poles, ducts, 
		cable chambers, and cables within the City of Toronto’s public property allowance in front of or adjacent to the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<TIMELINE>October 2019- February 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Humberline Load Transfer.jpg</PICTURE>
		<LAT>43.699294</LAT>
		<LNG>-79.586176</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20273</ID>
		<PNAME>Finch - Spot Pole Replacements Phase 1</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. 
		The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 – January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Finch - Spot Pole Replacements Phase 1.jpg</PICTURE>
		<LAT>43.754277</LAT>
		<LNG>-79.531608</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Leslie - Eglinton</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property on Leslie Street, Toronto Hydro is planning to install underground 
		ducts and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical </ACTIVITY>
		<TIMELINE>October 2019 – January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Leslie - Eglinton.jpg</PICTURE>
		<LAT>43.728241</LAT>
		<LNG>-79.346813</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P0124507</ID>
		<PNAME>Avenue - Oaklands</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability.
		The rebuild includes the replacement of existing electrical cables and hydro poles within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Avenue - Oaklands.jpg</PICTURE>
		<LAT>43.680604</LAT>
		<LNG>-79.398071</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20295</ID>
		<PNAME>Markham Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>November 2020 – May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>MarkhamRd.jpg</PICTURE>
		<LAT>43.749082</LAT>
		<LNG>-79.221395</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
		<ID>E17251</ID>
		<PNAME>Fuse Replacements</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system. The rebuild includes the replacement of existing fuses 
		and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Fuse Replacements.JPG</PICTURE>
		<LAT>43.774588</LAT>
		<LNG>-79.164457</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E17251</ID>
		<PNAME>Fuse Replacements</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system. The rebuild includes the replacement of existing fuses 
		and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Fuse Replacements.JPG</PICTURE>
		<LAT>43.782432</LAT>
		<LNG>-79.171412</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
		<ID>E17251</ID>
		<PNAME>Fuse Replacements</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system. The rebuild includes the replacement of existing fuses 
		and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - January 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Fuse Replacements.JPG</PICTURE>
		<LAT>43.797830</LAT>
		<LNG>-79.141833</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
		<ID>E17251</ID>
		<PNAME>Fuse Replacements</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system. The rebuild includes the replacement of existing fuses 
		and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Fuse Replacements.JPG</PICTURE>
		<LAT>43.766652</LAT>
		<LNG>-79.157602</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X20131/X20129</ID>
		<PNAME>Wellington – Scott</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of existing electrical cables and transformers within the private property of 30 Wellington Street East.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>December 2019 - December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Wellington – Scott.JPG</PICTURE>
		<LAT>43.648360</LAT>
		<LNG>-79.375169</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180018-E13001</ID>
		<PNAME>Greenbriar Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground and overhead electrical system in the community to help improve service 
		reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2019 - September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Greenbriar Road.JPG</PICTURE>
		<LAT>43.765892</LAT>
		<LNG>-79.380318</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
		<ID>W11542</ID>
		<PNAME>Chalkfarm</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Chalkfarm.JPG</PICTURE>
		<LAT>43.724413</LAT>
		<LNG>-79.511530</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
		<ID>W14144</ID>
		<PNAME>Cedarcroft</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading the overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Cedarcroft.JPG</PICTURE>
		<LAT>43.786085</LAT>
		<LNG>-79.451468</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
		<ID>W20306</ID>
		<PNAME>Martin Grove – Vulcan</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Martin Grove – Vulcan.JPG</PICTURE>
		<LAT>43.701870</LAT>
		<LNG>-79.575480</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
		<ID>X19303</ID>
		<PNAME>Charles Street Vault Rebuild</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability.  This includes the rebuild of a vault and duct structures within the city-owned property near the lot</DESCRIPTION>
		<ACTIVITY>Network Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019- June 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Charles Street Vault Rebuild.JPG</PICTURE>
		<LAT>43.668753</LAT>
		<LNG>-79.385707</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190902-XX9931-HN001</ID>
		<PNAME>Chaplin Crescent</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property on Chaplin Crescent, Toronto Hydro will be replacing the existing electrical 
		cables and transformers within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical </ACTIVITY>
		<TIMELINE>October 2019- January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Chaplin Crescent.JPG</PICTURE>
		<LAT>43.703163</LAT>
		<LNG>-79.408590</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
		<ID>E16173/E17038</ID>
		<PNAME>Whiteacres</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability.
		The rebuild includes upgrading electrical cables and transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Whiteacres.JPG</PICTURE>
		<LAT>43.783303</LAT>
		<LNG>-79.160824</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X20250/X20252</ID>
		<PNAME>Close - Springhurst</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of existing electrical cables and a transformer within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Network Civil Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – June 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Close - Springhurst.JPG</PICTURE>
		<LAT>43.634434</LAT>
		<LNG>-79.433880</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W17445</ID>
		<PNAME>Eglinton – Widdicombe Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes upgrading electrical cables and tap boxes on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 - March 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Eglinton – Widdicombe Phase 2.JPG</PICTURE>
		<LAT>43.678006</LAT>
		<LNG>-79.552945</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E17112</ID>
		<PNAME>Orton Park – Merkley Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability.
		The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 - September 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Orton Park – Merkley Phase 2.JPG</PICTURE>
		<LAT>43.770770</LAT>
		<LNG>-79.210181</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>1000 Warden Avenue</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of the existing ductbank and electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1000 Warden Avenue.JPG</PICTURE>
		<LAT>43.793390</LAT>
		<LNG>-79.315276</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E13312</ID>
		<PNAME>Lawrence Avenue Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Lawrence Avenue Phase 2.JPG</PICTURE>
		<LAT>43.793135</LAT>
		<LNG>-79.128049</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20314</ID>
		<PNAME>Brownsline - Edgeware</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for 
		the GO Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Brownsline - Edgeware.JPG</PICTURE>
		<LAT>43.592544</LAT>
		<LNG>-79.541127</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-160233-ZD2991</ID>
		<PNAME>Bathurst – Wells</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property on Bathurst Street, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>November 2019 – January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Bathurst – Wells.JPG</PICTURE>
		<LAT>43.671629</LAT>
		<LNG>-79.408285</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E11804</ID>
		<PNAME>Markham - Ellesmere</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 - February 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Markham - Ellesmere.JPG</PICTURE>
		<LAT>43.776334</LAT>
		<LNG>-79.228918</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X20206</ID>
		<PNAME>McCaul Street</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of an existing cable chamber roof within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>January 2020 - December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>McCaul Street.JPG</PICTURE>
		<LAT>43.658493</LAT>
		<LNG>-79.393212</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20274</ID>
		<PNAME>Steeles – Jane</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. 
		The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – May 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Steeles – Jane.JPG</PICTURE>
		<LAT>43.705164</LAT>
		<LNG>-79.521473</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X17153</ID>
		<PNAME>High Park Blvd – Indian Rd</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>High Park Blvd – Indian Rd.JPG</PICTURE>
		<LAT>43.645323</LAT>
		<LNG>-79.454939</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19087</ID>
		<PNAME>750 Spadina Avenue</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Network Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>750 Spadina Avenue.JPG</PICTURE>
		<LAT>43.666039</LAT>
		<LNG>-79.404038</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180490-ZD1011</ID>
		<PNAME>Rosemary Lane</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property on Rosemary Lane, Toronto Hydro will be replacing and installing hydro poles 
		within the City of Toronto’s public property allowance in front of or adjacent to the lot. Please note that we may also require access to the property.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical </ACTIVITY>
		<TIMELINE>November 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Rosemary Lane.JPG</PICTURE>
		<LAT>43.700542</LAT>
		<LNG>-79.423266</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W19048</ID>
		<PNAME>Wilmington Phase 5</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. 
		The rebuild includes upgrading overhead electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – November 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Wilmington Phase 5.JPG</PICTURE>
		<LAT>43.766648</LAT>
		<LNG>-79.457255</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E14922</ID>
		<PNAME>Maisonette Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability.
		The rebuild includes the replacement of the existing electrical cables, transformers and tap boxes within the city-owned property near the lot. Please note that we may 
		require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – November 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Maisonette Phase 2.JPG</PICTURE>
		<LAT>43.784312</LAT>
		<LNG>-79.262605</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X20198</ID>
		<PNAME>Heath – Yonge</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service
		reliability. The rebuild includes upgrading the electrical cables and cable chambers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – June 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Heath – Yonge.JPG</PICTURE>
		<LAT>43.689708</LAT>
		<LNG>-79.394764</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Holmes - Yonge</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction on Holmes Avenue, Toronto Hydro will be upgrading the overhead electrical 
		cables and installing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical </ACTIVITY>
		<TIMELINE>January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Holmes - Yonge.JPG</PICTURE>
		<LAT>43.778058</LAT>
		<LNG>-79.414102</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>350 Queens Quay West</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction on Queens Quay West, Toronto Hydro will be replacing the existing electrical
		cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical</ACTIVITY>
		<TIMELINE>November 2019 - January 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>350QueensQuayWest.jpg</PICTURE>
		<LAT>43.639280</LAT>
		<LNG>-79.389285</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18365</ID>
		<PNAME>Danforth 4kv Conversion, Phase 1 Underground</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. 
		The rebuild includes the replacement of the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2019 - August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Danforth4kvConversionPhase1.jpg</PICTURE>
		<LAT>43.685647</LAT>
		<LNG>-79.312802</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E13065</ID>
		<PNAME>Brimley - Skagway Phase 1</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging electrical system in the community to help improve service reliability. The rebuild includes the replacement of electrical cables within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 - December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BrimleySkagway.jpg</PICTURE>
		<LAT>43.726066</LAT>
		<LNG>-79.243623</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E13065</ID>
		<PNAME>Brimley - Skagway Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging electrical system in the community to help improve service reliability. The rebuild includes the replacement of electrical cables within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2020 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BrimleySkagway.jpg</PICTURE>
		<LAT>43.726066</LAT>
		<LNG>-79.243623</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E17114</ID>
		<PNAME>Orton Park - Merkley Phase 3</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading the electrical cables and replacing hydro poles on city-owned property
		near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 - September 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>OrtonParkMerkleyPhase3.jpg</PICTURE>
		<LAT>43.770583</LAT>
		<LNG>-79.204572</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E17111</ID>
		<PNAME>Orton Park – Merkley Phase 1</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and hydro poles within the city-owned
		property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 - September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>OrtonParkMerkleyPhase1.jpg</PICTURE>
		<LAT>43.764130</LAT>
		<LNG>-79.206384</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19116</ID>
		<PNAME>Queen - Victoria Cable Phase 1 Revised Timeline</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes a cable chamber rebuild and network upgrade within the city-owned
		property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Network Upgrade</ACTIVITY>
		<TIMELINE>September 2020 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>QueenVictoria.jpg</PICTURE>
		<LAT>43.653211</LAT>
		<LNG>-79.375625</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E17087</ID>
		<PNAME>Boydwood Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and
		transformers within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 - December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>BoydwoodElecPhase2.jpg</PICTURE>
		<LAT>43.805797</LAT>
		<LNG>-79.161233</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Bartor Road</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction on Bartor Road, Toronto Hydro will be installing ducts, cables and pole mounted equipment within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<TIMELINE>January 2020 - June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BartorRoad.jpg</PICTURE>
		<LAT>43.720886</LAT>
		<LNG>-79.524181</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E13074</ID>
		<PNAME>Red Maple Court Phase 2</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction, Toronto Hydro will be replacing the existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<TIMELINE>December 2019</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>RedMapleCourtPh2.jpg</PICTURE>
		<LAT>43.770541</LAT>
		<LNG>-79.380575</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18133</ID>
		<PNAME>Arlington</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 - September 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Arlington.jpg</PICTURE>
		<LAT>43.689713</LAT>
		<LNG>-79.435466</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18171</ID>
		<PNAME>Troutbrooke</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>December 2019 - November 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Troutebrooke.jpg</PICTURE>
		<LAT>43.730971</LAT>
		<LNG>-79.504628</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W15229</ID>
		<PNAME>Canarctic Drive Phase 2 Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 - June 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>CanarcticDrivePh2.jpg</PICTURE>
		<LAT>43.781578</LAT>
		<LNG>-79.494092</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19210</ID>
		<PNAME>Carlaw Gerrard Phase 4</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Wire Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CarlawGerrardPhase4.jpg</PICTURE>
		<LAT>43.663911</LAT>
		<LNG>-79.351668</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W16407</ID>
		<PNAME>Lauder Holland Park Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2020 – December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>LauderHollandParkPh2.jpg</PICTURE>
		<LAT>43.685298</LAT>
		<LNG>-79.441196</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>	
		<ID>W18213</ID>
		<PNAME>The West Mall Revised Template</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2020 – August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>TheWestMall.jpg</PICTURE>
		<LAT>43.627292</LAT>
		<LNG>-79.561959</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W17054</ID>
		<PNAME>Westmount Phase 7 Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and equipment within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – September 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Westmountph7Elec.jpg</PICTURE>
		<LAT>43.700095</LAT>
		<LNG>-79.546918</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20214</ID>
		<PNAME>Sheppard - Fenwood</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging overhead electrical system in the community to help improve service reliability. This includes upgrading transformers and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 - May 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>SheppardFenwood.jpg</PICTURE>
		<LAT>43.766005</LAT>
		<LNG>-79.279845</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20212</ID>
		<PNAME>Steeles - Middlefield</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles and Transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 – May 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>SteelesMiddlefield.jpg</PICTURE>
		<LAT>43.818039</LAT>
		<LNG>-79.283288</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W14173</ID>
		<PNAME>Dufferin - Finch</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading the electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>DufferinFinch.jpg</PICTURE>
		<LAT>43.768816</LAT>
		<LNG>-79.466764</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E19069</ID>
		<PNAME>Pleasant View Drive Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and hydro poles within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>PleasentViewDriveElec.jpg</PICTURE>
		<LAT>43.748806</LAT>
		<LNG>-79.312089</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>	
	<PROJECT>
		<ID>X16153</ID>
		<PNAME>Carlaw East Network Reconfiguration</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2020 – August 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CarlawEastNetworkReconfig.jpg</PICTURE>
		<LAT>43.680462</LAT>
		<LNG>-79.337312</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X20210</ID>
		<PNAME>Bathurst – King Cable Chamber</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of an existing cable chamber roof within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - June 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>BathurstKingCC.jpg</PICTURE>
		<LAT>43.643950</LAT>
		<LNG>-79.402461</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X20106</ID>
		<PNAME>Oxford Network Changeout</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Network Changeout</ACTIVITY>
		<TIMELINE>February 2020 – November 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>OxfordNetworkChangeout.jpg</PICTURE>
		<LAT>43.643950</LAT>
		<LNG>-79.402461</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19248</ID>
		<PNAME>Spadina Network Changeout</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and a transformer within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Network Upgrade</ACTIVITY>
		<TIMELINE>February 2020 – May 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Spadinanetworkchangeout.jpg</PICTURE>
		<LAT>43.657900</LAT>
		<LNG>-79.400196</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E13040,E13041</ID>
		<PNAME>Ironside Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground civil and electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2020 – November 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>IronsidePhase2.jpg</PICTURE>
		<LAT>43.824574</LAT>
		<LNG>-79.247955</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X15257</ID>
		<PNAME>270 Dundas Street East Switch Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and equipment within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - March 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>270DundasStreetEast.jpg</PICTURE>
		<LAT>43.661053</LAT>
		<LNG>-79.373120</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X15040</ID>
		<PNAME>St. Clair Avenue West Switch Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. This includes the replacement of existing electrical cables within the private property.</DESCRIPTION>
		<ACTIVITY>Underground Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>StClairAveWest.jpg</PICTURE>
		<LAT>43.681192</LAT>
		<LNG>-79.427652</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E17098</ID>
		<PNAME>Orton Park Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2020 - October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>OrtonParkElec.jpg</PICTURE>
		<LAT>43.779723</LAT>
		<LNG>-79.217025</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E17001</ID>
		<PNAME>Lawson Closson Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Upgrade</ACTIVITY>
		<TIMELINE>April 2020 - December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>LawsonClosson.jpg</PICTURE>
		<LAT>43.787431</LAT>
		<LNG>-79.150690</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20307</ID>
		<PNAME>Carlingview Entrance</PNAME>
		<DESCRIPTION>We’re planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<TIMELINE>February 2020 - March 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CarlingviewEntrance.jpg</PICTURE>
		<LAT>43.705740</LAT>
		<LNG>-79.603982</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W19288</ID>
		<PNAME>Chapman Station</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables, hydro poles and switchgears within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2020 - September 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>ChapmanStation.jpg</PICTURE>
		<LAT>43.690030</LAT>
		<LNG>-79.532021</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18041</ID>
		<PNAME>Finch - Senlac</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - November 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>FinchSenlacPh1.jpg</PICTURE>
		<LAT>43.766921</LAT>
		<LNG>-79.434262</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
    <PROJECT>
		<ID>E18210</ID>
		<PNAME>Eglinton - Lord Roberts Phase 1</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables, poles and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - November 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>EglintonLordRoberts.jpg</PICTURE>
		<LAT>43.735195</LAT>
		<LNG>-79.258411</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W17121</ID>
		<PNAME>Keele - Sheppard</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2020 - December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>KeeleSheppard.jpg</PICTURE>
		<LAT>43.744926</LAT>
		<LNG>-79.486142</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X20224</ID>
		<PNAME>Bay – Albert Roof Rebuild</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of an existing vault roof within the city-owned property near your lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>March 2020 - May 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>BayAlbert.jpg</PICTURE>
		<LAT>43.653010</LAT>
		<LNG>-79.382620</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20311</ID>
		<PNAME>Royal York Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RoyalYorkPhase2.jpg</PICTURE>
		<LAT>43.615104</LAT>
		<LNG>-79.497804</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>n/a</ID>
		<PNAME>1785 Finch Ave West</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and installing equipment on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2020 - June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1785FinchAveW.jpg</PICTURE>
		<LAT>43.759379</LAT>
		<LNG>-79.507533</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E19314</ID>
		<PNAME>Kennedy – Havendale Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground civil system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KennedyHavendalePhase2.jpg</PICTURE>
		<LAT>43.791184</LAT>
		<LNG>-79.291345</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E18121</ID>
		<PNAME>Kennedy – Havendale Phase 1</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground civil system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KennedyHavendalePhase1.jpg</PICTURE>
		<LAT>43.792419</LAT>
		<LNG>-79.287969</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E15484</ID>
		<PNAME>Comrie Terrace Civil</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>March 2020 - October 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>ComrieTerraceCivil.jpg</PICTURE>
		<LAT>43.724463</LAT>
		<LNG>-79.243021</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X20230</ID>
		<PNAME>Sherbourne – Earl Roof Rebuild</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. This includes the replacement of an existing cable chamber roof within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - June 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>SherbourneEarl.jpg</PICTURE>
		<LAT>43.669274</LAT>
		<LNG>-79.378022</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E16341</ID>
		<PNAME>Steeles – Brimley Civil</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables, transformers and tap boxes within the city-owned property
near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>March 2020 - December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>SteelesBrimley.jpg</PICTURE>
		<LAT>43.827217</LAT>
		<LNG>-79.291682</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E15297</ID>
		<PNAME>Victoria Park – Gordon Phase 3A Revised Timeline</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and tap boxes within the private property.  Please note that we may require access to your property to install an underground pipe that connects the existing vault at the property to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Wire Upgrade</ACTIVITY>
		<TIMELINE>April 2020 – November 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>VictoriaParkGordonPhase3A.jpg</PICTURE>
		<LAT>43.808404</LAT>
		<LNG>-79.338237</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W16407</ID>
		<PNAME>Lauder-Holland Park Phase 3</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2020 – March 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LauderHollandPhase3.jpg</PICTURE>
		<LAT>43.681939</LAT>
		<LNG>-79.436400</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W16407</ID>
		<PNAME>Lauder-Holland Park Phase 4</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2020 – September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LauderHollandPhase4.jpg</PICTURE>
		<LAT>43.682136</LAT>
		<LNG>-79.439633</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P190503-ZD164019</ID>
		<PNAME>1130 Bloor St W</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables within the city-owned property near the lot. Please note that we may require access to your property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Equipment Upgrade</ACTIVITY>
		<TIMELINE>January 2021 - June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1130BloorStW.jpg</PICTURE>
		<LAT>43.660008</LAT>
		<LNG>-79.435283</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>MSO-2001</ID>
		<PNAME>Edna – Dundas</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes The Network Vault Roof Rebuild within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Network Upgrade</ACTIVITY>
		<TIMELINE>March 2020 – July 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>EdnaDundas.jpg</PICTURE>
		<LAT>43.657787</LAT>
		<LNG>-79.454952</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>MSO-2002</ID>
		<PNAME>1255 Bay Street</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes a Network Vault Rood Rebuild within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Civil Network Upgrade</ACTIVITY>
		<TIMELINE>March 2020 – July 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>1255BayStreet.jpg</PICTURE>
		<LAT>43.671926</LAT>
		<LNG>-79.387534</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X16377</ID>
		<PNAME>Hammersmith Phase 1 Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to your property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>HammersmithPhase1.jpg</PICTURE>
		<LAT>43.672635</LAT>
		<LNG>-79.287783</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Apollo Place Switch Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. This includes the replacement of the existing switch within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical</ACTIVITY>
		<TIMELINE>March 2020 – June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Appolo.jpg</PICTURE>
		<LAT>43.775368</LAT>
		<LNG>-79.488694</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-W10501-HS034</ID>
		<PNAME>Tillplain Road - Revised Timeline</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property on Tillplain Road, Toronto Hydro will be replacing the existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical</ACTIVITY>
		<TIMELINE>July 2020 - August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Tillplain.jpg</PICTURE>
		<LAT>43.754993</LAT>
		<LNG>-79.461169</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180261-Z19101-LR020</ID>
		<PNAME>Greenwood Station Relocation</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging overhead electrical system in the community to help improve service reliability. This includes upgrading the overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical</ACTIVITY>
		<TIMELINE>March 2020 - December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>GreenwoodStation.jpg</PICTURE>
		<LAT>43.682835</LAT>
		<LNG>-79.330128</LNG>
		<LIVE>Yes</LIVE>
</PROJECT>
	<PROJECT>
		<ID>X14202</ID>
		<PNAME>Bloor Brock Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>BloorBrockPhase2.jpg</PICTURE>
		<LAT>43.659834</LAT>
		<LNG>-79.435318</LNG>
		<LIVE>Yes</LIVE>
</PROJECT>
	<PROJECT>
		<ID>E20098,E20099</ID>
		<PNAME>Pleasant View Drive Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground and Overhead Civil and Electrical</ACTIVITY>
		<TIMELINE>March 2020 - November 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>PleasantDrivePhase2.jpg</PICTURE>
		<LAT>43.782190</LAT>
		<LNG>-79.338627</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E12347</ID>
		<PNAME>Flemingdon Revised Timeline Update</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 - June 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Flemingtdon.jpg</PICTURE>
		<LAT>43.718434</LAT>
		<LNG>-79.331109</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E15396</ID>
		<PNAME>Scunthorpe Phase F</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and tap boxes within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>March 2020 - December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>ScunthorpePhaseF.jpg</PICTURE>
		<LAT>43.793857</LAT>
		<LNG>-79.238658</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E15474,E15475</ID>
		<PNAME>Dutch Myrtle Way</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables, tap boxes, transformers and a hydro pole within the city-owned property near the lot. Please note that we may require access to your property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2020 - November 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>DutchMyrtleWay.jpg</PICTURE>
		<LAT>43.740824</LAT>
		<LNG>-79.345033</LNG>
		<LIVE>Yes</LIVE>
</PROJECT>
	<PROJECT>
		<ID>E13352</ID>
		<PNAME>McNicoll - Morningside - Revised timeline</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and switchgear within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2020 - February 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>McNicollMorningside.jpg</PICTURE>
		<LAT>43.840009</LAT>
		<LNG>-79.232085</LNG>
		<LIVE>Yes</LIVE>
</PROJECT>
	<PROJECT>
		<ID>E18273</ID>
		<PNAME>Old Sheppard and Brian UG Voltage Conversion</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Wire Upgrade</ACTIVITY>
		<TIMELINE>April 2020 - October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>OldSheppardBrian.jpg</PICTURE>
		<LAT>43.785716</LAT>
		<LNG>-79.327946</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E19081</ID>
		<PNAME>Godstone Kingslake</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2020 - September 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>GodstoneKingslake.jpg</PICTURE>
		<LAT>43.776087</LAT>
		<LNG>-79.339655</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>THR2018-00067OT</ID>
		<PNAME>Ice Path Relocation Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the underground and underground electrical system in the community in preparation for the GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2020 - August 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Icepathphase2.jpg</PICTURE>
		<LAT>43.642591</LAT>
		<LNG>-79.381348</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18172</ID>
		<PNAME>Downsview Phase 1</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables, replacing hydro poles and transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2020 - February 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DownsviewPhase1.jpg</PICTURE>
		<LAT>43.720856</LAT>
		<LNG>-79.508489</LNG>
		<LIVE>Yes</LIVE>
</PROJECT>
	<PROJECT>
		<ID>X20225</ID>
		<PNAME>Bay Irwin Cable Chamber Roof Rebuild</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. This includes the replacement of an existing cable chamber roof within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>April 2020 – June 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>BayIrwin.jpg</PICTURE>
		<LAT>43.666596</LAT>
		<LNG>-79.388043</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W17247,W18054</ID>
		<PNAME>Thorncrest Phase 9</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging backyard electrical system in the community with a front yard underground system. The rebuild includes the installation of underground electrical cables, padmount transformers, tap boxes and a splice vault within the City of Toronto’s public property allowance and on private property. Please note that we may require access to the property to install an underground pipe that connects the meter at your home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Rear Lot Conversion</ACTIVITY>
		<TIMELINE>April 2020 - June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ThorncrestPh9.jpg</PICTURE>
		<LAT>43.677085</LAT>
		<LNG>-79.550688</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X12414</ID>
		<PNAME>Strachan Feeder Transfer</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2020 - June 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>StrachanFeederTransfer.jpg</PICTURE>
		<LAT>43.638659</LAT>
		<LNG>-79.413979</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W16075</ID>
		<PNAME>Canarctic Drive Phase 3 Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2020 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CanarcticDrivePhase3.jpg</PICTURE>
		<LAT>43.781319</LAT>
		<LNG>-79.494602</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W17257</ID>
		<PNAME>Evans Horner</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging electrical system in the community to help improve service reliability. This includes the installation of duct banks and cable chambers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<TIMELINE>April 2020 – October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>EvansHorner.jpg</PICTURE>
		<LAT>43.607289</LAT>
		<LNG>-79.520488</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190675-ED191000</ID>
		<PNAME>Sheppard Highway 404</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to relocate the electrical system in the community. The project includes the relocation of existing electrical cables and civil ducts</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical </ACTIVITY>
		<TIMELINE>April 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>SheppardHIghway404.jpg</PICTURE>
		<LAT>43.776136</LAT>
		<LNG>-79.341620</LNG>
		<LIVE>Yes</LIVE>
</PROJECT>
	<PROJECT>
		<ID>W14219</ID>
		<PNAME>Stoneham Markburn</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and Tap Boxes within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2020 – October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>StonehamMarkham.jpg</PICTURE>
		<LAT>43.642320</LAT>
		<LNG>-79.586145</LNG>
		<LIVE>Yes</LIVE>
</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Ardwold Gate</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Street Lighting is planning to rebuild the aging underground system in the community to help improve service reliability. The rebuild includes the replacement of the existing street lighting infrastructure within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Wire Upgrade</ACTIVITY>
		<TIMELINE>July 2020 - August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>ArwoldGate.jpg</PICTURE>
		<LAT>43.680774</LAT>
		<LNG>-79.409503</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200502-WD164030</ID>
		<PNAME>Sheppard – George Henry</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing transformers within the private property. </DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2020 - June 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>SheppardGeorge.jpg</PICTURE>
		<LAT>43.773252</LAT>
		<LNG>-79.517093</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Hillsdale Avenue East</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property on Hillsdale Avenue East, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>HilldaleAveEast.jpg</PICTURE>
		<LAT>43.707594</LAT>
		<LNG>-79.377097</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190090-X19001</ID>
		<PNAME>Peter - University</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2020 – October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>PeterUni.jpg</PICTURE>
		<LAT>43.652783</LAT>
		<LNG>-79.388104</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E13024</ID>
		<PNAME>Warden-Palmdale Phase 2 Revised Timeline</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables within the private property.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2020 – September 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>WardenPalmdalePh2.jpg</PICTURE>
		<LAT>43.770693</LAT>
		<LNG>-79.304426</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18293</ID>
		<PNAME>Hammersmith Phase 4 Revised Timeline Update</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2020 - September 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Hammersmith Phase 4.JPG</PICTURE>
		<LAT>43.668767</LAT>
		<LNG>-79.298898</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-W10501-HR003</ID>
		<PNAME>Maryport - Keele</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>April 2020 – June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>MaryportKeele.jpg</PICTURE>
		<LAT>43.740297</LAT>
		<LNG>-79.485381</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E16317</ID>
		<PNAME>Blue Eagle – Dunmail Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and tap boxes within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Wire Upgrade</ACTIVITY>
		<TIMELINE>May 2020 - October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BlueEaglePh2.jpg</PICTURE>
		<LAT>43.740297</LAT>
		<LNG>-79.485381</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200021-ED170002</ID>
		<PNAME>Bellamy - Eglinton</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2020 – October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Bellamyeglinton.jpg</PICTURE>
		<LAT>43.740368</LAT>
		<LNG>-79.232108</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E16136</ID>
		<PNAME>Cromwell Senator Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2020 - September 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>CromwellSenatorElec.jpg</PICTURE>
		<LAT>43.751290</LAT>
		<LNG>-79.205975</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E15487</ID>
		<PNAME>Coalport Drive</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2020 - December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>coalportdrive.jpg</PICTURE>
		<LAT>43.687688</LAT>
		<LNG>-79.282852</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18168</ID>
		<PNAME>Comay Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>comayroad.jpg</PICTURE>
		<LAT>43.696977</LAT>
		<LNG>-79.483630</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18132</ID>
		<PNAME>Robina</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2020 – October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Robina.jpg</PICTURE>
		<LAT>43.679915</LAT>
		<LNG>-79.435787</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X16073</ID>
		<PNAME>Dupont Phase 5</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2020 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DupontPh5.jpg</PICTURE>
		<LAT>43.675578</LAT>
		<LNG>-79.423136</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18423</ID>
		<PNAME>Taysham Cable Replacement </PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables, ducts and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2020- June 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Taysham.jpg</PICTURE>
		<LAT>43.743307</LAT>
		<LNG>-79.581921</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18331</ID>
		<PNAME>Runnymede Phase 5</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2020 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>RunnymedePh5.jpg</PICTURE>
		<LAT>43.655830</LAT>
		<LNG>-79.486957</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W15662</ID>
		<PNAME>Arrow Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables, transformer and a tap box within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>May 2020 - September 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>ArrowRoad.jpg</PICTURE>
		<LAT>43.745806</LAT>
		<LNG>-79.529555</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>n/a</ID>
		<PNAME>Widmer Street</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>April 2020 – June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WidmerStreet.jpg</PICTURE>
		<LAT>43.646311</LAT>
		<LNG>-79.391026</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W19276</ID>
		<PNAME>Richview Phase 1</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro is planning to upgrade the underground electrical system. This includes the replacement of existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<TIMELINE>April 2020 – August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>RichviewPhase1.jpg</PICTURE>
		<LAT>43.688952</LAT>
		<LNG>-79.582186</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W19276</ID>
		<PNAME>Richview Phase 2</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro is planning to upgrade the underground electrical system. This includes the replacement of existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil</ACTIVITY>
		<TIMELINE>April 2020 – August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>RichviewPhase2.jpg</PICTURE>
		<LAT>43.698204</LAT>
		<LNG>-79.586833</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-E10501-HN074</ID>
		<PNAME>Fima Crescent</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be upgrading the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>May 2020 – June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FimaCrescent.jpg</PICTURE>
		<LAT>43.608640</LAT>
		<LNG>-79.535585</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X11423</ID>
		<PNAME>Windsor – Bremner</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables within the city-owned property in front of or adjacent to the lot.</DESCRIPTION>
		<ACTIVITY>Underground Wire Upgrade</ACTIVITY>
		<TIMELINE>March 2020 - January 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>WindsorBremner.jpg</PICTURE>
		<LAT>43.642691</LAT>
		<LNG>-79.394131</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X20196</ID>
		<PNAME>Bulwer Street Cable Chamber Rebuild Revised Timeline</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>May 2020 - October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>BulwerStreetRebuild.jpg</PICTURE>
		<LAT>43.649445</LAT>
		<LNG>-79.396523</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E15479</ID>
		<PNAME>3409-3420 St. Clair Avenue East</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the private property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2020 – August 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>3409StClairAvenueE.jpg</PICTURE>
		<LAT>43.713156</LAT>
		<LNG>-79.276191</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190517-XD191001</ID>
		<PNAME>Bloor – Perth</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the underground electrical system in the community in preparation for the City of Toronto’s bridge rehabilitation program.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>April 2020 - December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BloorPerth.jpg</PICTURE>
		<LAT>43.657048</LAT>
		<LNG>-79.448881</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-170138-XD5361-00001</ID>
		<PNAME>Omaha – Cibola Avenue Revised Timeline</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead electrical system in the community in preparation for the City of Toronto’s Algonquin Island Bridge Rehabilitation project.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>August 2020 – October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>OmahaCibola.jpg</PICTURE>
		<LAT>43.627564</LAT>
		<LNG>-79.357321</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20298</ID>
		<PNAME>Milliken – Silver Star</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead electrical system in the community in preparation for the GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical </ACTIVITY>
		<TIMELINE>April 2020 - March 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>MilikenSilverStar.jpg</PICTURE>
		<LAT>43.814595</LAT>
		<LNG>-79.292358</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-205000-ED166004-008</ID>
		<PNAME>Hummingbird - Hyancinth</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Wire Upgrade</ACTIVITY>
		<TIMELINE>May 2020 - July 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>HummingbirdHy.jpg</PICTURE>
		<LAT>43.825852</LAT>
		<LNG>-79.243422</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>n/a</ID>
		<PNAME>King - Dufferin</PNAME>
		<DESCRIPTION>Overhead Civil and Electrical Work</DESCRIPTION>
		<ACTIVITY>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot. </ACTIVITY>
		<TIMELINE>May 2020 - June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KingDufferin.jpg</PICTURE>
		<LAT>43.638957</LAT>
		<LNG>-79.427349</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-W10101-LR002</ID>
		<PNAME>Athol Avenue</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and a hydro pole within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>May 2020 - June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>AtholAvenue.jpg</PICTURE>
		<LAT>43.627756</LAT>
		<LNG>-79.511920</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190093</ID>
		<PNAME>Lower Sherbourne - Queens Quay</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to your neighbour’s property, Toronto Hydro will be upgrading the existing underground electrical cables and cable chamber within the city-owned property near your lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>May 2020 - June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LowerSherbourneQueens.jpg</PICTURE>
		<LAT>43.645758</LAT>
		<LNG>-79.368572</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190059-E10101-LS088</ID>
		<PNAME>Tambrook Drive</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and tap boxes within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>TambrookDrive.jpg</PICTURE>
		<LAT>43.801456</LAT>
		<LNG>-79.310997</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-X10501-HN031</ID>
		<PNAME>Lonsdale Road</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2020 - November 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LonsdaleRoad.jpg</PICTURE>
		<LAT>43.688107</LAT>
		<LNG>-79.394249</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LN123</ID>
		<PNAME>Cedarbank Crescent</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be upgrading the existing electrical cables within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CedarbankCrescent.jpg</PICTURE>
		<LAT>43.740746</LAT>
		<LNG>-79.339936</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190194-WX9931-HN001</ID>
		<PNAME>Lawrence Heights</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2020 – May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LawrenceHeights.jpg</PICTURE>
		<LAT>43.723539</LAT>
		<LNG>-79.447368</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>COS5801</ID>
		<PNAME>Albany-Dupont</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>May 2020 – August 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>AlbanyDupont.jpg</PICTURE>
		<LAT>43.674348</LAT>
		<LNG>-79.414811</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180015-E10501-HS014</ID>
		<PNAME>4171 Sheppard Avenue East</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and a hydro pole within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>May 2020 – August 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>4171Sheppard.jpg</PICTURE>
		<LAT>43.785011</LAT>
		<LNG>-79.280441</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18169</ID>
		<PNAME>Tycos Drive</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2020- March 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>TycosDrive.jpg</PICTURE>
		<LAT>43.7042031</LAT>
		<LNG>-79.459850</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200021-ED182004</ID>
		<PNAME>Bellamy – Cedar Brae</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2020 – November 2020 </TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BellamyCedarBrae.jpg</PICTURE>
		<LAT>43.739577</LAT>
		<LNG>-79.235253</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-220121-XD136001</ID>
		<PNAME>Gerrard-Berkeley Cable Chamber Rebuild</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and cable chambers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Wire Upgrade</ACTIVITY>
		<TIMELINE>June 2020 – October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>GerrardBerkeley.jpg</PICTURE>
		<LAT>43.661789</LAT>
		<LNG>-79.369761</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-205000-ED166004-011</ID>
		<PNAME>Hummingbird Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and transformers on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2020 - September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>HummingbirdPhase2.jpg</PICTURE>
		<LAT>43.829274</LAT>
		<LNG>-79.234041</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-205000-ED166004-025</ID>
		<PNAME>Dowry - Reidmount</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Wire Upgrade</ACTIVITY>
		<TIMELINE>June 2020 - September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DowryReidmount.jpg</PICTURE>
		<LAT>43.783258</LAT>
		<LNG>-79.288372</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19107</ID>
		<PNAME>College – Spadina Vault Rebuild</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2020 - October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CollegeSpadina.jpg</PICTURE>
		<LAT>43.657916</LAT>
		<LNG>-79.400094</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X20092</ID>
		<PNAME>Bay - Charles</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. This includes the replacement of existing electrical cables and cable chambers within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2020 - August 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BayCharles.jpg</PICTURE>
		<LAT>43.668166</LAT>
		<LNG>-79.388849</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180240-W18401-HR030</ID>
		<PNAME>Weston – Lawrence</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2020 – July 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WestonLawrence.jpg</PICTURE>
		<LAT>43.700214</LAT>
		<LNG>-79.516432</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C180240-W18401-HR028</ID>
		<PNAME>City View Drive Relocation</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade and relocate the overhead electrical system in the community in preparation for the GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CityViewDriveRelocation.jpg</PICTURE>
		<LAT>43.708120</LAT>
		<LNG>-79.591114</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-220181- ED16001</ID>
		<PNAME>Townsend Road Phase 1 Revised Timeline</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and installation of hydro poles within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2020 – May 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>TownsendRoadPhase1.jpg</PICTURE>
		<LAT>43.810950</LAT>
		<LNG>-79.357187</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190070-W53601-HR030</ID>
		<PNAME>The Queensway Relocation</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables, transformers and hydro poles within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2020 – August 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>TheQueenswayRelocation.jpg</PICTURE>
		<LAT>43.624281</LAT>
		<LNG>-79.511695</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18386</ID>
		<PNAME>Fieldgate MS</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>August 2020 – October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FieldgateMS.jpg</PICTURE>
		<LAT>43.675696</LAT>
		<LNG>-79.568419</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18386</ID>
		<PNAME>Fieldgate MS</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>July 2020 – October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FieldgateMS.jpg</PICTURE>
		<LAT>43.675696</LAT>
		<LNG>-79.568419</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18386</ID>
		<PNAME>Church – King Rebuild Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2020 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ChurchKingRebuildPhase2.jpg</PICTURE>
		<LAT>43.707879</LAT>
		<LNG>-79.512127</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-205000-WD166004-004</ID>
		<PNAME>1000 Arrow Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and a switchgear on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1000ArrowRoad.jpg</PICTURE>
		<LAT>43.750494</LAT>
		<LNG>-79.533834</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190004-ZX9901-00048-1</ID>
		<PNAME>King - Mercer</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2020 – September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KingMercer.jpg</PICTURE>
		<LAT>43.646661</LAT>
		<LNG>-79.392601</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18160</ID>
		<PNAME>Church – King Rebuild Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical and Civil Upgrade</ACTIVITY>
		<TIMELINE>July 2020 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ChurchKingPhase2.jpg</PICTURE>
		<LAT>43.708259</LAT>
		<LNG>-79.514286</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200210-WD163003-002</ID>
		<PNAME>750 Runnymede Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and poles on city-owned property near your lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2020 – September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>750RunnymedeRoad.jpg</PICTURE>
		<LAT>43.665577</LAT>
		<LNG>-79.482359</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200210-WD163003-002</ID>
		<PNAME>750 Runnymede Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and poles on city-owned property near your lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2020 – September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>750RunnymedeRoad.jpg</PICTURE>
		<LAT>43.665577</LAT>
		<LNG>-79.482359</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190099-EZ9931</ID>
		<PNAME>Bartley Drive</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2020 – September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BartleyDrive.jpg</PICTURE>
		<LAT>43.722264</LAT>
		<LNG>-79.306991</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E19323</ID>
		<PNAME>69 Nightstar Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of a Pad Switchgear within private property. Please note that we may require access to the school property to replace and install the Pad Switchgear.</DESCRIPTION>
		<ACTIVITY>Underground Wire Upgrade</ACTIVITY>
		<TIMELINE>June 2020 - December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>69NightstarRoad.jpg</PICTURE>
		<LAT>43.824276</LAT>
		<LNG>-79.225852</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190511-ED164003-099</ID>
		<PNAME>1970 Ellesmere Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables, transformers and poles within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2020- October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1970Ellesmere.jpg</PICTURE>
		<LAT>43.774313</LAT>
		<LNG>-79.241761</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210114-XD136001</ID>
		<PNAME>Terauley-Charles Civil</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the installation of underground duct structures and cable chambers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Work</ACTIVITY>
		<TIMELINE>July 2020 – February 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>TerauleyCharles.jpg</PICTURE>
		<LAT>43.660489</LAT>
		<LNG>-79.375735</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-205000-ED166004-023</ID>
		<PNAME>Chicory - Staines</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing a switchgear on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2020 – October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ChicoryStaines.jpg</PICTURE>
		<LAT>43.846223</LAT>
		<LNG>-79.209513</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W19277</ID>
		<PNAME>Richview Phase 7</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.  Please note that we may require access to the property to install an underground pipe that connects the meter at your home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2020 - September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RichviewPhase7.jpg</PICTURE>
		<LAT>43.707516</LAT>
		<LNG>-79.578252</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-180084-WD191004</ID>
		<PNAME>Runnymede Station Feeder Relocation</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the Hydro One Network Incorporation.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2020 – November 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RunnymedeStationfeeder.jpg</PICTURE>
		<LAT>43.672123</LAT>
		<LNG>-79.489838</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20317</ID>
		<PNAME>Cobalt - Sedan</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ColbaltSedan.jpg</PICTURE>
		<LAT>43.691585</LAT>
		<LNG>-79.500848</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200230-WD161003</ID>
		<PNAME>Islington - Elmhurst</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.  Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2020 – September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>IslingtonElmhurst.jpg</PICTURE>
		<LAT>43.723202</LAT>
		<LNG>-79.558993</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200256-ED152002</ID>
		<PNAME>Overland Drive Revised Timeline</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2020 – October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>OverlandDrive.jpg</PICTURE>
		<LAT>43.732031</LAT>
		<LNG>-79.348497</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-E10501-HN102  </ID>
		<PNAME>2135 Sheppard Avenue East</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and a transformer within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2020 – October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>2135SheppardAvenueEast.jpg</PICTURE>
		<LAT>43.775071</LAT>
		<LNG>-79.331188</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-220146-WD161001</ID>
		<PNAME>295 The West Mall</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing switchgears on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2020 – February 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>295theWestMall.jpg</PICTURE>
		<LAT>43.636194</LAT>
		<LNG>-79.560124</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W16295</ID>
		<PNAME>Tamarack Circle</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The work is comprised of a civil component where we will install underground conduit and tap boxes and an electrical component where new transformers and primary/secondary cables will be installed on the townhouse corporation’s property.  Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line. The site will be restored according to the city’s restoration guidelines.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2020 - June 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>TamarakCircle.jpg</PICTURE>
		<LAT>43.697240</LAT>
		<LNG>-79.539399</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID> C-180261-Z19101-LR027</ID>
		<PNAME> TTC Summerhill Station Relocation</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the TTC’s Summerhill Station Easier Access Program.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>January 2021 – April 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>TTCSummerhill.jpg</PICTURE>
		<LAT>43.682858</LAT>
		<LNG>-79.390006</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E13312</ID>
		<PNAME>Lawrence Avenue Phase 2B </PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables on city-owned property near the lot.  Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2020 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Lawrence.jpg</PICTURE>
		<LAT>43.791261</LAT>
		<LNG>-79.124936</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200255-ED151000</ID>
		<PNAME>Warden - Malley</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>August 2020 – February 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>WardenMalley.jpg</PICTURE>
		<LAT>43.723690</LAT>
		<LNG>-79.275331</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180329-WD1511</ID>
		<PNAME>TTC Lansdowne Relocation</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for Lansdowne Station Canopy Installation.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>August 2020 – September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>TTC Lansdowne Relocation.jpg</PICTURE>
		<LAT>43.658338</LAT>
		<LNG>-79.442771</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200135-ED191000-001</ID>
		<PNAME>Sheppard TS Relocation</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead to underground in the community in preparation for the Hydro One Sheppard Station Upgrade.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work </ACTIVITY>
		<TIMELINE>August 2020 – March 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>SheppardTSRelocation.jpg</PICTURE>
		<LAT>43.808401</LAT>
		<LNG>-79.171131</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-220181-ED161000</ID>
		<PNAME>Townsend Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and concrete encased duct banks to be installed on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade </ACTIVITY>
		<TIMELINE>September 2020 - October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Townsend.jpg</PICTURE>
		<LAT>43.809891</LAT>
		<LNG>-79.356741</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180432-ED1051</ID>
		<PNAME>Warden – Minford</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work </ACTIVITY>
		<TIMELINE>September 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WardenMinford.jpg</PICTURE>
		<LAT>43.737044</LAT>
		<LNG>-79.291334</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Brock Avenue</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work </ACTIVITY>
		<TIMELINE>September 2020 – October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BrockAvenue.jpg</PICTURE>
		<LAT>43.643688</LAT>
		<LNG>-79.433164</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20312</ID>
		<PNAME>Kipling – Horner Civil</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead Civil Work</ACTIVITY>
		<TIMELINE>October 2020 – April 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KiplingHorner.jpg</PICTURE>
		<LAT>43.607215</LAT>
		<LNG>-79.520606</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W19073</ID>
		<PNAME>Pemberton Phase 1</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables on city-owned property near the lot.  Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2020 - March 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>PembertonPhase1.jpg</PICTURE>
		<LAT>43.779721</LAT>
		<LNG>-79.415705</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18290</ID>
		<PNAME>Danforth Phase 2A Part 1</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables, replacing hydro poles, a cable chamber rebuild and concrete encased duct banks to be installed on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2020 – February 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>DanforthPhase2A.jpg</PICTURE>
		<LAT>43.685639</LAT>
		<LNG>-79.312764</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18113</ID>
		<PNAME>Queen - Yonge</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. This includes upgrading underground electrical cables, equipment and a vault rebuild on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2020 – May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>QueenYonge.jpg</PICTURE>
		<LAT>43.654327</LAT>
		<LNG>-79.378766</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X21062</ID>
		<PNAME>Frederick Street Network Changeout</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Network Upgrade</ACTIVITY>
		<TIMELINE>September 2020 - October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>FredrickStreetNetwork.jpg</PICTURE>
		<LAT>43.650401</LAT>
		<LNG>-79.367850</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-220146-WD161001</ID>
		<PNAME>295 The West Mall</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing switchgears on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade </ACTIVITY>
		<TIMELINE>September 2020 – February 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>295theWestMall.jpg</PICTURE>
		<LAT>43.635677</LAT>
		<LNG>-79.562340</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W19002</ID>
		<PNAME>Richview Civil Phase 3 Revised Timeline Update</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be installing underground ducts and chambers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Work</ACTIVITY>
		<TIMELINE>April 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RichviewPhase3.jpg</PICTURE>
		<LAT>43.701507</LAT>
		<LNG>-79.608916</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200502-ED164045</ID>
		<PNAME>Timberbank Boulevard</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing a submersible transformer on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2020 – November 2020 </TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>TimberbankBoulevard.jpg</PICTURE>
		<LAT>43.792516</LAT>
		<LNG>-79.312911</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-205000-WD166004-015</ID>
		<PNAME>Misty Crescent </PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing Transformers on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2020 – October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Mistycrescent.jpg</PICTURE>
		<LAT>43.745646</LAT>
		<LNG>-79.373478</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-205000-WD166004-013</ID>
		<PNAME>Sentinel-Boake</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing transformers on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade </ACTIVITY>
		<TIMELINE>August 2020 - October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Sentinelboake.jpg</PICTURE>
		<LAT>43.767076</LAT>
		<LNG>-79.501274</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200182-XD151001</ID>
		<PNAME>Toronto Island Transformer Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging electrical system in the community to help improve service reliability. This includes upgrading electrical cables and padmount transformers on city owned property near the lot.</DESCRIPTION>
		<ACTIVITY> Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2020 - April 2021 </TIMELINE>
		<PSTATUS>Current </PSTATUS>
		<PICTURE>TorontoIslandTransformerReplacement.jpg</PICTURE>
		<LAT>43.621159</LAT>
		<LNG>-79.380105</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>SL-601</ID>
		<PNAME>Blue Ridge Road </PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Street Lighting is planning to rebuild the aging street lighting infrastructure in the community to improve service reliability. This will include the installation of street lighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>October 2020 – November 2020 </TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>BlueRidgeRoad.jpg</PICTURE>
		<LAT>43.769743</LAT>
		<LNG>-79.374296</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-170044-WD151003</ID>
		<PNAME>175 King Street </PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.  Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>October 2020- December 2020 </TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>175King.jpg</PICTURE>
		<LAT>43.707235</LAT>
		<LNG>-79.510553</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180230-ZD1051</ID>
		<PNAME>3453 Victoria Park Avenue</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>August 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>VictoriaPark.jpg</PICTURE>
		<LAT>43.799553</LAT>
		<LNG>-79.333173</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X11245</ID>
		<PNAME>Yonge - St. Clair Vault Rebuild</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Network Upgrade</ACTIVITY>
		<TIMELINE>October 2020 – May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>YongeStClaire.jpg</PICTURE>
		<LAT>43.688282</LAT>
		<LNG>-79.396345</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LN136</ID>
		<PNAME>Avondale Avenue</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the property, Toronto Hydro will be installing a new tap box and ducts within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Avondale.jpg</PICTURE>
		<LAT>43.758946</LAT>
		<LNG>-79.406785</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180329-WD1511</ID>
		<PNAME>TTC Lansdowne Relocation</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for Lansdowne Station Canopy Installation.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>August 2020 – September 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>TTCLansdowne.jpg</PICTURE>
		<LAT>43.659669</LAT>
		<LNG>-79.443222</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20321</ID>
		<PNAME>Highway 27 – Disco</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the GO Expansion Electrification program.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>September 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Highway27.jpg</PICTURE>
		<LAT>43.711743</LAT>
		<LNG>-79.593126</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E13065</ID>
		<PNAME>Brimley Skagway Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.  Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2020 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Brimley.jpg</PICTURE>
		<LAT>43.731153</LAT>
		<LNG>-79.242860</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-170439-ZD2991</ID>
		<PNAME>3385 Dundas Street West</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the property, Toronto Hydro will be replacing the existing electrical cables and installing a hydro pole within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>October 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>3385Dundas.jpg</PICTURE>
		<LAT>43.665592</LAT>
		<LNG>-79.484122</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W17306</ID>
		<PNAME>St Olaves Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading electrical cables and hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>September 2020 – December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>StOlaves.jpg</PICTURE>
		<LAT>43.642168</LAT>
		<LNG>-79.474657</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-160341-ZD2991</ID>
		<PNAME>6435 Kingston Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables on city-owned property near the lot.  </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2020 - October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>6435Kingston.jpg</PICTURE>
		<LAT>43.791107</LAT>
		<LNG>-79.158146</LNG>
		<LIVE>Yes</LIVE>
</PROJECT>
	<PROJECT>
		<ID>SL2020-02</ID>
		<PNAME>O'Connor - St. Clair</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Street Lighting is planning to rebuild the aging street lighting infrastructure in the community to improve service reliability. This will include the installation of street lighting infrastructure on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead Civil Work</ACTIVITY>
		<TIMELINE>September 2020 – October 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>OConner.jpg</PICTURE>
		<LAT>43.712965</LAT>
		<LNG>-79.302175</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
			<ID>SL-2020-04</ID>
			<PNAME>Liberty Village</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro Street Lighting is planning to rebuild the aging street lighting infrastructure in the community to improve service reliability. This will include the installation of street lighting infrastructure on city-owned property near the lot. </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
			<TIMELINE>September 2020 – October 2020</TIMELINE>
			<PSTATUS>Completed </PSTATUS>
			<PICTURE>Liberty.jpg</PICTURE>
			<LAT> 43.638251</LAT>
			<LNG>-79.423015</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>X19290</ID>
			<PNAME>Esplanade Feeder Extension</PNAME>
			<DESCRIPTION>Please be advised that as a result of construction to the property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot</DESCRIPTION>
			<ACTIVITY>Underground Electrical Work</ACTIVITY>
			<TIMELINE>September 2020 – June 2021</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>Esplanade.jpg</PICTURE>
			<LAT>43.645150</LAT>
			<LNG>-79.368140</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>X18290</ID>
			<PNAME>Danforth Avenue Phase 2A Part B</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot. </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
			<TIMELINE>October 2020 - February 2021</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>DanforthAvePhase2A.jpg</PICTURE>
			<LAT>43.677599</LAT>
			<LNG>-79.312057</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>C-150168-ZD1051</ID>
			<PNAME>David Dunlap Circle</PNAME>
			<DESCRIPTION> Please be advised that as a result of construction to the property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot. </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
			<TIMELINE>October 2020 – December 2020</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>DavidDunlap.jpg</PICTURE>
			<LAT>43.729898</LAT>
			<LNG>-79.334655</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>C-190057-W10501-HS008</ID>
			<PNAME>Marmora Street</PNAME>
			<DESCRIPTION>Please be advised that as a result of construction to the property, Toronto Hydro will be upgrading the existing electrical cables within the city-owned property near the lot. </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
			<TIMELINE>October 2020 – February 2021</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>Marmora.jpg</PICTURE>
			<LAT>43.718438</LAT>
			<LNG>-79.525847</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>W18172</ID>
			<PNAME>Downsview Avenue Phase 2 </PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables on city-owned property near the lot.</DESCRIPTION>
			<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
			<TIMELINE>September 2020 – February 2021</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>Downsview.jpg</PICTURE>
			<LAT>43.722448</LAT>
			<LNG>-79.496899</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>THR2020-00021OT</ID>
			<PNAME>Alvin - St. Clair</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to install a temporary pole to facilitate a crane operation on Alvin Avenue. </DESCRIPTION>
			<ACTIVITY>Overhead Electrical Work</ACTIVITY>
			<TIMELINE>October 2020</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>AlvinStClair.jpg</PICTURE>
			<LAT>43.689371</LAT>
			<LNG>-79.393032</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>E12216</ID>
			<PNAME>Northdale – Silvergrove</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and hydro poles on city-owned property near the lot.  </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
			<TIMELINE>September 2020 – May 2021</TIMELINE>
			<PSTATUS>Completed</PSTATUS>
			<PICTURE>Northdale.jpg</PICTURE>
			<LAT>43.759436</LAT>
			<LNG>-79.374474</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>C-190058-Z13001-HN008</ID>
			<PNAME>Downsview Park Boulevard</PNAME>
			<DESCRIPTION>Please be advised that as a result of construction to the property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot. </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
			<TIMELINE>October 2020 – May 2021</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>DownsviewPark.jpg</PICTURE>
			<LAT>43.736290</LAT>
			<LNG>-79.481461</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>E15341</ID>
			<PNAME>McNicoll-Pharmacy Phase 3</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
			<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
			<TIMELINE>October 2020 - August 2021</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>McNicoll.jpg</PICTURE>
			<LAT>43.774052</LAT>
			<LNG>-79.311260</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>C-190121-W10501-HN011</ID>
			<PNAME>2050 Finch Avenue West</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the Finch West LRT.</DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
			<TIMELINE>September 2020 – March 2022</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>2050Finch.jpg</PICTURE>
			<LAT>43.759879</LAT>
			<LNG>-79.506113</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>X15854</ID>
			<PNAME>Queens Quay Esplanade</PNAME>
			<DESCRIPTION>Please be advised that as a result of construction to the property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot. </DESCRIPTION>
			<ACTIVITY>Underground Electrical Work</ACTIVITY>
			<TIMELINE>September 2020 – June 2021</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>QueensQuay.jpg</PICTURE>
			<LAT>43.646817</LAT>
			<LNG>-79.363321</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>X15323 / X16009</ID>
			<PNAME>Copeland -Terauley - Windsor</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. This includes upgrading underground electrical cables on city-owned property near the lot. </DESCRIPTION>
			<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
			<TIMELINE>September 2020 - January 2021</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>Copeland.jpg</PICTURE>
			<LAT>43.644344</LAT>
			<LNG>-79.386655</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>C-163032-ZD1911</ID>
			<PNAME>Danforth - Warden</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead electrical system in the community to better accommodate and ease traffic at the Danforth and Warden intersection.</DESCRIPTION>
			<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
			<TIMELINE>September 2020 – December 2020</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>Danforth.jpg</PICTURE>
			<LAT>43.697549</LAT>
			<LNG>-79.274821</LNG>
			<LIVE>Yes</LIVE>
		</PROJECT>
	<PROJECT>
			<ID>C-190070-E53601-LR019</ID>
			<PNAME>Midland - Norbury</PNAME>
			<DESCRIPTION>Please be advised that as a result of construction to the property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot. </DESCRIPTION>
			<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
			<TIMELINE>October 2020</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>Midland.jpg</PICTURE>
			<LAT>43.755056</LAT>
			<LNG>-79.266374</LNG>
			<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18040</ID>
		<PNAME>Finch – Senlac Phase 1</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2020 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FinchSenlac.jpg</PICTURE>
		<LAT>43.762140</LAT>
		<LNG>-79.418329</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>SL2020-05</ID>
		<PNAME>Lake Shore - Royal York</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Street Lighting is planning to rebuild the aging street lighting  infrastructure in the community to improve service reliability. This will include the installation of street lighting infrastructure on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>September 2020 – October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LakeShore.jpg</PICTURE>
		<LAT>43.598703</LAT>
		<LNG>-79.504558</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>SL-2020-01</ID>
		<PNAME> McLevin – Morningside - Sewells</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Street Lighting is planning to rebuild the aging street lighting infrastructure in the community to improve service reliability. This will include the installation of street lighting infrastructure on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<TIMELINE>October 2020 – November 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>McLevin.jpg</PICTURE>
		<LAT> 43.813013</LAT>
		<LNG>-79.209313</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>SL-2020-03</ID>
		<PNAME>Toronto Islands Streetlight Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Street Lighting is planning to rebuild the aging street lighting infrastructure in the community to improve service reliability. This will include the upgrade of street lighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>October 2020 - November 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>TorontoIsland.jpg</PICTURE>
		<LAT>43.629545</LAT>
		<LNG>-79.358333</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LN119</ID>
		<PNAME>42 Foursome Crescent</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and installing a new tap box within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>November 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>42Foursome.jpg</PICTURE>
		<LAT>43.751740</LAT>
		<LNG>-79.395391</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LN129</ID>
		<PNAME>Aspenwood Drive</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be upgrading the existing electrical cables and installing a tap box within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>November 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Aspenwood.jpg</PICTURE>
		<LAT>43.807408</LAT>
		<LNG>-79.363038</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200133-XD181001</ID>
		<PNAME>2 Cooper Street Revised Timeline Update</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Network Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - March 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>2Cooper.jpg</PICTURE>
		<LAT>43.643045</LAT>
		<LNG>-79.372738</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20086</ID>
		<PNAME>33 Mallard Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging overhead and underground electrical system in the community to help improve service reliability. This includes upgrading overhead and underground electrical cables and replacing a hydro pole on city-owned property near the lot. As a result of this work, a temporary gravel roadway will be constructed on Mallard Road. Once the work is completed, the roadway will be removed and the sod will be restored.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>October 2020 – November 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>33Mallard.jpg</PICTURE>
		<LAT>43.748667</LAT>
		<LNG>-79.349454</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>847 Sheppard Avenue West</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be upgrading electrical cables and installing a hydro pole within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>847Sheppard.jpg</PICTURE>
		<LAT>43.752548</LAT>
		<LNG>-79.452575</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200153-WD164001</ID>
		<PNAME>Adelaide - Victoria Cable Repair</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. This includes upgrading underground electrical cables and repairing a cable chamber and transformer vault cable on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2020 - March 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>AdelaideVictoria.jpg</PICTURE>
		<LAT>43.650467</LAT>
		<LNG>-79.381009</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18042</ID>
		<PNAME>Dafoe – Strachan Phase 4C</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.  </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2020 – June 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>DafoeStrachan.jpg</PICTURE>
		<LAT>43.645931</LAT>
		<LNG>-79.419476</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E15270, E15297</ID>
		<PNAME>Victoria Park - Gordon Phase 3B</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables within the private property. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2020 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>VictoriaGordan.jpg</PICTURE>
		<LAT>43.804166</LAT>
		<LNG>-79.340449</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Finch - Winlock</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>November 2020 – January 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FinchWinlock.jpg</PICTURE>
		<LAT>43.784117</LAT>
		<LNG>-79.396071</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LN104</ID>
		<PNAME>180 Munro Street</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and installing a hydro pole within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Work</ACTIVITY>
		<TIMELINE>November 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>180Munro.jpg</PICTURE>
		<LAT>43.662919</LAT>
		<LNG>-79.353419</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200502-WD164041</ID>
		<PNAME>975 Martin Grove Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging electrical system in the community to help improve service reliability. This includes upgrading underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2020 – November 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>975MartinGrove.jpg</PICTURE>
		<LAT>43.696349</LAT>
		<LNG>-79.571911</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Rykert Crescent</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing a hydro pole within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>November 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RykertCrescent.jpg</PICTURE>
		<LAT> 43.717434</LAT>
		<LNG>-79.359347</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>50 Earl Street Relocation</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>October 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>50Earl.jpg</PICTURE>
		<LAT>43.669025</LAT>
		<LNG>-79.375039</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-205000-ED166004-001</ID>
		<PNAME>60 Gowan Avenue</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and a pole switch replacement on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2020 - January 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>60Gowan.jpg</PICTURE>
		<LAT>43.687998</LAT>
		<LNG>-79.352264</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E21083</ID>
		<PNAME>Birchmount - Sheppard Civil</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes trenching and the installation of civil ducts and tap boxes on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>November 2020 - May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Birchmount.jpg</PICTURE>
		<LAT>43.776136</LAT>
		<LNG>-79.300089</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20033</ID>
		<PNAME>Whitehorn - Kingslake</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and transformers within the city-owned property near the lot.  Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>June 2020 - March 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>WhitehornKingslake.jpg</PICTURE>
		<LAT>43.789974</LAT>
		<LNG>-79.347080</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LN113</ID>
		<PNAME>Bayview Ridge</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be upgrading the existing electrical cables within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>November 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BayviewRidge.jpg</PICTURE>
		<LAT>43.741294</LAT>
		<LNG>-79.384882</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190121-W10501-HN009</ID>
		<PNAME>Finch - Tobermory</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community in preparation for the Finch West LRT.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>November 2020 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FinchTobermory.jpg</PICTURE>
		<LAT>43.759317</LAT>
		<LNG>-79.507926</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LN101</ID>
		<PNAME>Forest Glen Crescent</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and installing a transformer and tap boxes within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>November 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ForestGlen.jpg</PICTURE>
		<LAT>43.735142</LAT>
		<LNG>-79.403512</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Richview - Ardmore</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>November 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RichviewArdmore.jpg</PICTURE>
		<LAT>43.694236</LAT>
		<LNG>-79.421529</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-170687-ZD1301</ID>
		<PNAME>Cummer - Willowdale</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and installing new hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>October 2020 – March 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CummerWillowdale.jpg</PICTURE>
		<LAT>43.789029</LAT>
		<LNG>-79.408290</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20248</ID>
		<PNAME>3750 Lawrence Avenue East Transformer Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing a transformer on private property</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2020 – June 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>3750Lawrence.jpg</PICTURE>
		<LAT>43.762860</LAT>
		<LNG>-79.215131</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Heathcote - Bayview</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables, installing a hydro pole and tap boxes within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>November 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>HeathcoteBayview.jpg</PICTURE>
		<LAT>43.752579</LAT>
		<LNG>-79.383143</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210255-ED161000</ID>
		<PNAME>Leslie MS Cable Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2020 – February 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>LeslieMS.jpg</PICTURE>
		<LAT>43.773080</LAT>
		<LNG>-79.326731</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19264</ID>
		<PNAME>77 Bloor Street West</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the electrical system in the community to help improve service reliability. This includes replacing electrical equipment.</DESCRIPTION>
		<ACTIVITY>Network Upgrade</ACTIVITY>
		<TIMELINE>January 2021 - April 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>77BloorSt.jpg</PICTURE>
		<LAT>43.669172</LAT>
		<LNG>-79.390064</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E16318</ID>
		<PNAME>Blue Eagle – Dunmail Phase 2 Electrical </PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing streetlight poles on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BlueEagle.jpg</PICTURE>
		<LAT>43.806567</LAT>
		<LNG>-79.284216</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E15028</ID>
		<PNAME>Braymore Phase 3 Civil</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes trenching, the installation of civil ducts, tap boxes and transformers on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 - December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BraymorePh3.jpg</PICTURE>
		<LAT>43.802632</LAT>
		<LNG>-79.172052</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210083-WD161000</ID>
		<PNAME>Humber - Rockcliffe</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. This includes upgrading underground electrical cables and vault transformers within the private property. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – June 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Humber.jpg</PICTURE>
		<LAT>43.675615</LAT>
		<LNG>-79.484128</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
			<ID>X18290</ID>
			<PNAME>Danforth Avenue Phase 2A Part C</PNAME>
			<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
			<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
			<TIMELINE>January 2021 – June 2021</TIMELINE>
			<PSTATUS>Current</PSTATUS>
			<PICTURE>DanAve2APartC.jpg</PICTURE>
			<LAT>43.683233</LAT>
			<LNG>-79.314157</LNG>
			<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210138-XD138001</ID>
		<PNAME>Maple Avenue Roof Rebuild</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. This includes the rebuild of a vault roof on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>January 2021 - April 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>MapleAve.jpg</PICTURE>
		<LAT>43.675417</LAT>
		<LNG>-79.373346</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210085-XD183001/P-210086-XD183001</ID>
		<PNAME>Main Street Network Changeout</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading electrical cables and a vault on city-owned property near the lot</DESCRIPTION>
		<ACTIVITY>Network Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – April 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>MainSt.jpg</PICTURE>
		<LAT>43.681460</LAT>
		<LNG>-79.298276</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180291-ZD1051-00001</ID>
		<PNAME>Cumberland - Yonge</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to a nearby property, Toronto Hydro will be installing new electrical cables and civil ducts within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>November 2020 – December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CumberlandYonge.jpg</PICTURE>
		<LAT>43.671439</LAT>
		<LNG>-79.388003</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E19047</ID>
		<PNAME>Kennedy - Havendale Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.  Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 - August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Kennedy.jpg</PICTURE>
		<LAT>43.790434</LAT>
		<LNG>-79.285858</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200007-ED151001</ID>
		<PNAME>Lupin - Crocus</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>LupinCrocus.jpg</PICTURE>
		<LAT>43.765206</LAT>
		<LNG>-79.304621</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200268-WD124001</ID>
		<PNAME>Venn Crescent Rebuild</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – June 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>VennCres.jpg</PICTURE>
		<LAT>43.690736</LAT>
		<LNG>-79.466874</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210155-XD183001/P-210155-XD183002</ID>
		<PNAME>50 Stephanie Street</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Network Upgrade</ACTIVITY>
		<TIMELINE>January 2021 - February 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>50Stephanie.jpg</PICTURE>
		<LAT>43.651455</LAT>
		<LNG>-79.392264</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>N/A</ID>
		<PNAME>Niagara Street</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to a nearby property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>January 2021 – March 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>NiagaraSt.jpg</PICTURE>
		<LAT>43.641379</LAT>
		<LNG>-79.403575</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190408-XD183001/P-190409-XD183001</ID>
		<PNAME>55 Harbour Square</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the electrical system in the community to help improve service reliability. This includes a network unit and transformer change out.</DESCRIPTION>
		<ACTIVITY>Network Upgrade</ACTIVITY>
		<TIMELINE>January 2021 - December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>55HarbourSq.jpg</PICTURE>
		<LAT>43.640232</LAT>
		<LNG>-79.378626</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LS105</ID>
		<PNAME>Hedgewood Road</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to a nearby property, Toronto Hydro will be replacing the existing electrical cables and installing a hydro pole within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>November 2020 – January 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>HedgewoodRd.jpg</PICTURE>
		<LAT>43.743301</LAT>
		<LNG>-79.398212</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E16302</ID>
		<PNAME>Leslie – Van Horne Revised Timeline</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>November 2020 - November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Leslie – Van Horne.jpg</PICTURE>
		<LAT>43.781504</LAT>
		<LNG>-79.359744</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180261-Z19101-LR070</ID>
		<PNAME>2787 Eglinton Avenue East</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community. This includes the relocation of hydro poles in the area.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>December 2020 – March 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>2787Eglinton.jpg</PICTURE>
		<LAT>43.73706760581921</LAT>
		<LNG>-79.24630977519055</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200271-ED109000</ID>
		<PNAME>Pape Avenue</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging overhead and underground electrical system in the community to help improve service reliability. This includes installing electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>December 2020</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>PapeAve.jpg</PICTURE>
		<LAT>43.68852212103905</LAT>
		<LNG>-79.3508525273426</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>MSO-2102</ID>
		<PNAME>1298 Danforth Avenue</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. This includes the rebuild of a vault roof on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1278DanforthAve.jpg</PICTURE>
		<LAT>43.68255683666014</LAT>
		<LNG>-79.32998888952606</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-160324-XD5362-00001</ID>
		<PNAME>Dupont Phase 3 Part 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning relocation work on the overhead electrical system in the community.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>December 2020 – January 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DupontPh3Pt2.jpg</PICTURE>
		<LAT>43.674862543902805</LAT>
		<LNG>-79.40709548109893</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18214</ID>
		<PNAME>Hilda - Goulding</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Hilda.jpg</PICTURE>
		<LAT>43.787737839477394</LAT>
		<LNG>-79.42503178937235</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210234-WD191001</ID>
		<PNAME>Humberline - Albion</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead and underground electrical system in the community. The rebuild includes upgrading overhead electrical cables and installing a hydro pole with switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>January 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Humberline.jpg</PICTURE>
		<LAT>43.739908079372015</LAT>
		<LNG>-79.60726787988558</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210234-WD191000</ID>
		<PNAME>Rexdale Relocation Phase 1</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the underground electrical system in the community. The rebuild includes relocating underground electrical cables and installing hydro assets on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>January 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RexdalePh1.jpg</PICTURE>
		<LAT>43.73678976890576</LAT>
		<LNG>-79.60302802043483</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180528-WD2991</ID>
		<PNAME>1780 Lawrence Avenue West</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>December 2020 – April 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1780Lawrence.jpg</PICTURE>
		<LAT>43.70423987796543</LAT>
		<LNG>-79.49968148690661</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-X10501-HT010</ID>
		<PNAME>88 Queen Street East</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>November 2020 – February 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>88Queen.jpg</PICTURE>
		<LAT>43.653595741721226</LAT>
		<LNG>-79.37394318825639</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-011</ID>
		<PNAME>Warden Avenue Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging overhead electrical system in the community to help improve service reliability. This includes upgrading overhead switches on city-owned property the your lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – April 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>WardenAve.jpg</PICTURE>
		<LAT>43.78629562740757</LAT>
		<LNG>-79.3113578491544</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-X10102-LN003</ID>
		<PNAME>111 Warren Road</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and a hydro pole within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>December 2020</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>111Warren.jpg</PICTURE>
		<LAT>43.68683936831757</LAT>
		<LNG>-79.40677247065756</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E21083</ID>
		<PNAME>Birchmount - Sheppard Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BirchShep.jpg</PICTURE>
		<LAT>43.776388135719195</LAT>
		<LNG>-79.29933791649752</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190305-ED161002</ID>
		<PNAME>Pemberton Phase 2</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of existing electrical cables within the city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Pemberton.jpg</PICTURE>
		<LAT>43.78249169431468</LAT>
		<LNG>-79.40747697407733</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E16194</ID>
		<PNAME>Lorraine Avenue Overhead Rebuild</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 - December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LorraineAve.jpg</PICTURE>
		<LAT>43.730765281243144</LAT>
		<LNG>-79.25415233842895</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E16198</ID>
		<PNAME>Wolfe Avenue Cable Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WolfeAve.jpg</PICTURE>
		<LAT>43.72546537948685</LAT>
		<LNG>-79.25503825499183</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180261-Z19101-LR068</ID>
		<PNAME>Rexdale – Islington Realignment</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the overhead electrical system in the community in preparation for the realignment of the Rexdale Blvd and Islington Ave intersection. This includes the replacement of existing hydro poles.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>December 2020 – March 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RexdaleIslington.jpg</PICTURE>
		<LAT>43.71393254906478</LAT>
		<LNG>-79.55545584196014</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190101-WX9931-HN001</ID>
		<PNAME>Lascelles Boulevard</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>January 2021 – April 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Lascelles.jpg</PICTURE>
		<LAT>43.694606871730414</LAT>
		<LNG>-79.39951262309013</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W16305</ID>
		<PNAME>Sandale Gardens</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables, installing tap boxes and hydro poles on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Sandale.jpg</PICTURE>
		<LAT>43.75408203428764</LAT>
		<LNG>-79.45592949047573</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190161-ED161002</ID>
		<PNAME>Midland-Gilder</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.  Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>MidlandGilder.jpg</PICTURE>
		<LAT>43.73668281484713</LAT>
		<LNG>-79.25905839540232</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LS117</ID>
		<PNAME>Staley Terrace</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and installing a tap box within the city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>January 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Staley.jpg</PICTURE>
		<LAT>43.806234994393215</LAT>
		<LNG>-79.31321154134957</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200212-WD164003-078</ID>
		<PNAME>2659 Eglinton Avenue West</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and a transformer on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – March 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>2659EglintonAveW.jpg</PICTURE>
		<LAT>43.68666268735596</LAT>
		<LNG>-79.47662121476088</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18076</ID>
		<PNAME>Wilson Avenue Rebuild</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WilsonAve.jpg</PICTURE>
		<LAT>43.73790028337879</LAT>
		<LNG>-79.4392274360989</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19188</ID>
		<PNAME>Davenport - Wiltshire Phase 1 Civil</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability.  The rebuild includes trenching and the installation of civil ducts on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Davenport.jpg</PICTURE>
		<LAT>43.662215395525166</LAT>
		<LNG>-79.45358308788664</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W21089</ID>
		<PNAME>Churchill Avenue</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – June 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Churchill.jpg</PICTURE>
		<LAT>43.76955076593648</LAT>
		<LNG>-79.4313865287288</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W21084</ID>
		<PNAME>Lorraine Drive</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>LorraineDr.jpg</PICTURE>
		<LAT>43.7776548356419</LAT>
		<LNG>-79.42130831435966</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210112-XD181001</ID>
		<PNAME>225 Davisville Avenue</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading electrical cables and transformers at 225 Davisville Avenue.</DESCRIPTION>
		<ACTIVITY>Network Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>225Davisville.jpg</PICTURE>
		<LAT>43.69892916531385</LAT>
		<LNG>-79.3885765905825</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LS134</ID>
		<PNAME>Oakhurst Drive</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be installing a new tap box and civil ducts within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>January 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Oakhurst.jpg</PICTURE>
		<LAT>43.794411573823346</LAT>
		<LNG>-79.39255383077696</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E19071 / E19074</ID>
		<PNAME>Old Sheppard - Brian Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - June 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>OldSheppard.jpg</PICTURE>
		<LAT>43.77839498815649</LAT>
		<LNG>-79.32807736867412</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18063</ID>
		<PNAME>Combe Avenue Cable Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.  Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Combe.jpg</PICTURE>
		<LAT>43.76052035570491</LAT>
		<LNG>-79.4496631549299</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18137</ID>
		<PNAME>Greensboro - Enterprise</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles and a tap box on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Greensboro.jpg</PICTURE>
		<LAT>43.70055569687066</LAT>
		<LNG>-79.5650218954565</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W15304</ID>
		<PNAME>Belfield Phase 2B</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and installing hydro poles on city-owned property near the lot.  Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Belfield.jpg</PICTURE>
		<LAT>43.69742118844989</LAT>
		<LNG>-79.56764429923547</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180261-Z19101-LR050</ID>
		<PNAME>TTC Spadina Station Relocation</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to relocate a portion of the overhead electrical system in the community in preparation for TTC’s Easier Access Program.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>January 2021 – March 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>TTCSpadinaStationRelocation.jpg</PICTURE>
		<LAT>43.66891501391968</LAT>
		<LNG>-79.40474634436013</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190901-WX9931</ID>
		<PNAME>Islington-Muir Revised Timeline Update</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>IslingtonMuir.jpg</PICTURE>
		<LAT>43.76047637989051</LAT>
		<LNG>-79.57353622919763</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18292</ID>
		<PNAME>Danforth 4kv Conversion Phase 4 Civil</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.  Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Danforth4kv.jpg</PICTURE>
		<LAT>43.68742570273262</LAT>
		<LNG>-79.29841536438056</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E17090</ID>
		<PNAME>Neilson - Ellesmere Phase 3 Civil</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground civil structures on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>January 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>NeilsonEllesmere.jpg</PICTURE>
		<LAT>43.78257499550483</LAT>
		<LNG>-79.20491981539027</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E16134</ID>
		<PNAME>Scunthorpe Phase G Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Scunthorpe.jpg</PICTURE>
		<LAT>43.791754668381216</LAT>
		<LNG>-79.24216544302834</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180440-WD1051</ID>
		<PNAME>Weston - Church</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>January 2021 – February 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Weston.jpg</PICTURE>
		<LAT>43.70364379418207</LAT>
		<LNG>-79.52542395970158</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200281-WD161000</ID>
		<PNAME>34 Orpington Crescent Transformer Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and a transformer installation on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 - June 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>34Orpington.jpg</PICTURE>
		<LAT>43.7361581956162</LAT>
		<LNG>-79.5882262424333</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E21112</ID>
		<PNAME>Centre Avenue</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CentreAve.jpg</PICTURE>
		<LAT>43.79169939142881</LAT>
		<LNG>-79.4146017467205</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LN130</ID>
		<PNAME>Goodless Court</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be installing a new duct and a tap box within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>February 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>GoodlessCrt.jpg</PICTURE>
		<LAT>43.797970978089786</LAT>
		<LNG>-79.22710425175381</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210227-ED151010</ID>
		<PNAME>Don Mills Transformer Replacements</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and overhead transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DonMillsTransformer.jpg</PICTURE>
		<LAT>43.73736262319697</LAT>
		<LNG>-79.34336010477466</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210270-WD151001</ID>
		<PNAME>Islington Transformer Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables, replacing hydro poles and transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>IslingtonTransformerReplacement.jpg</PICTURE>
		<LAT>43.741576360621494</LAT>
		<LNG>-79.56729532868897</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W21006</ID>
		<PNAME>Jamestown Phase 2 Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and installing transformers and tap boxes on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>JamestownPh2.jpg</PICTURE>
		<LAT>43.735670482360966</LAT>
		<LNG>-79.58531256247726</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190379-XD154008</ID>
		<PNAME>Sherbourne 4kV Voltage Conversion</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. This includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Sherbourne4kv.jpg</PICTURE>
		<LAT>43.66979008215453</LAT>
		<LNG>-79.38462256751548</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-E10501-HS038</ID>
		<PNAME>The Links Road</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and upgrading the civil structure on a city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>January 2021 – March 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LinksRoad.jpg</PICTURE>
		<LAT>43.75113372409979</LAT>
		<LNG>-79.40199790147061</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190324-WD170001</ID>
		<PNAME>Thistletown MS Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables, replacing hydro poles and installing civil ducts on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 - July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ThistletownMS.jpg</PICTURE>
		<LAT>43.737253065286744</LAT>
		<LNG>-79.55896757739652</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190070-E53601-LR019</ID>
		<PNAME>Midland – Norbury</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>January 2021 – April 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>MidlandNorbury.jpg</PICTURE>
		<LAT>43.754978124974315</LAT>
		<LNG>-79.26629015667001</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19273</ID>
		<PNAME>Windsor Civil Upgrade</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>December 2020 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WindsorCivil.jpg</PICTURE>
		<LAT>43.64760213554694</LAT>
		<LNG>-79.38480007306718</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-019</ID>
		<PNAME>Old Finch – Morningside Transformer Replacements</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading and replacing existing submersible transformers on city-owned property near the lot. Please note that we may require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>OldFinchMorningside.jpg</PICTURE>
		<LAT>43.821037874529104</LAT>
		<LNG>-79.20626161724286</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-020</ID>
		<PNAME>Blue Anchor – Port Union Transformer Replacements</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing transformers on city-owned property near the lot. Please note that we may require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BlueAnchor.jpg</PICTURE>
		<LAT>43.79641072735479</LAT>
		<LNG>-79.14078217217525</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-020</ID>
		<PNAME>Blue Anchor – Port Union Transformer Replacements</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing transformers on city-owned property near the lot. Please note that we may require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BlueAnchor.jpg</PICTURE>
		<LAT>43.77831032813305</LAT>
		<LNG>-79.13667513413036</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210029-WD170002 / P-210029-WD182004</ID>
		<PNAME>Highbury MS</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>HighburyMS.jpg</PICTURE>
		<LAT>43.68909163820997</LAT>
		<LNG>-79.55625964506642</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E18313</ID>
		<PNAME>Chester Le Blvd Phase 1 Civil</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Chester.jpg</PICTURE>
		<LAT>43.798280438454114</LAT>
		<LNG>-79.3328343605986</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210227-ED151003</ID>
		<PNAME>Northline - Curity</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables, replacing hydro poles and installing transformers on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Northline.jpg</PICTURE>
		<LAT>43.711501663160824</LAT>
		<LNG>-79.31542948248361</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E14140 / E14923</ID>
		<PNAME>Maisonette Underground Rebuild Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing hydro poles on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Maisonette.jpg</PICTURE>
		<LAT>43.782001399460945</LAT>
		<LNG>-79.26368297843494</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LN152</ID>
		<PNAME>Sanfield Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing hydro poles on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>January 2021 – February 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Sandfield.jpg</PICTURE>
		<LAT>43.74917185397169</LAT>
		<LNG>-79.37457168792666</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20266</ID>
		<PNAME>Whitehorn – Kingslake Phase 2 Civil</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes the installation of tap boxes on city-owned property near the lot. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Whitehorn.jpg</PICTURE>
		<LAT>43.79303820926393</LAT>
		<LNG>-79.34785749980377</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-014</ID>
		<PNAME>Montressor Drive Transformer Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading and replacing existing submersible transformer on city-owned property near the lot. Please note that we may require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Montressor.jpg</PICTURE>
		<LAT>43.758961285178984</LAT>
		<LNG>-79.39275479477388</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20216</ID>
		<PNAME>Brimley Shaddock MS Cable Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead and underground electrical cables, replacing hydro poles and installing a new switchgear on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>January 2021 - April 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>Brimley.jpg</PICTURE>
		<LAT>43.7377961070502</LAT>
		<LNG>-79.24884504432039</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-005</ID>
		<PNAME>Huntingwood - Castledene Transformer Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading and replacing existing submersible transformer on city-owned property near the lot. Please note that we may require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Huntingwood.jpg</PICTURE>
		<LAT>43.78085496343636</LAT>
		<LNG>-79.32402837680681</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-005</ID>
		<PNAME>Huntingwood - Castledene Transformer Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading and replacing existing submersible transformer on city-owned property near the lot. Please note that we may require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Huntingwood.jpg</PICTURE>
		<LAT>43.78093288234835</LAT>
		<LNG>-79.31843584801996</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-X10501-HT025</ID>
		<PNAME>Dundas - Watkinson</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>January 2021 – February 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DundasWatkinson.jpg</PICTURE>
		<LAT>43.66546808768935</LAT>
		<LNG>-79.46060185269862</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210227-ED151002</ID>
		<PNAME>Prince Andrew - Don Mills - Concorde</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles and transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>PrinceAndrewDonMills.jpg</PICTURE>
		<LAT>43.726822636884116</LAT>
		<LNG>-79.34460559100702</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210227-ED151002</ID>
		<PNAME>Prince Andrew - Don Mills - Concorde</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles and transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>PrinceAndrewDonMills.jpg</PICTURE>
		<LAT>43.72598812548208</LAT>
		<LNG>-79.33888574457357</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210227-ED151002</ID>
		<PNAME>Prince Andrew - Don Mills - Concorde</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles and transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>PrinceAndrewDonMills.jpg</PICTURE>
		<LAT>43.728282874923885</LAT>
		<LNG>-79.3268805514458</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210227-ED151028</ID>
		<PNAME>York Mills - Don Mills Spot Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 - August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>YorkMillsDonMillsSpot.jpg</PICTURE>
		<LAT>43.75465110321393</LAT>
		<LNG>-79.35075879823349</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210227-ED151028</ID>
		<PNAME>York Mills - Don Mills Spot Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 - August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>YorkMillsDonMillsSpot.jpg</PICTURE>
		<LAT>43.75180663544444</LAT>
		<LNG>-79.34958240032513</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210227-ED151028</ID>
		<PNAME>York Mills - Don Mills Spot Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 - August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>YorkMillsDonMillsSpot.jpg</PICTURE>
		<LAT>43.74811300136527</LAT>
		<LNG>-79.34700301319816</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190070-W53601-HR045</ID>
		<PNAME>135 Plunkett Road</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and a hydro pole within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>January 2021 – May 2021</TIMELINE>
		<PSTATUS> Current</PSTATUS>
		<PICTURE>135Plunkett.jpg</PICTURE>
		<LAT>43.76247701263675</LAT>
		<LNG>-79.57049741971665</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18319</ID>
		<PNAME>Hammersmith - Queen</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability.  The rebuild includes upgrading underground electrical cables, installing tap boxes and a hydro pole on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Network Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – December 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>HammersmithQueen.jpg</PICTURE>
		<LAT>43.6724664867362</LAT>
		<LNG>-79.28878975251759</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18319</ID>
		<PNAME>Hammersmith - Queen Network Preparation</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead and underground electrical system in the community to help improve service reliability. The rebuild includes the replacement of the existing electrical cables and a vault roof rebuild on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – March 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>HammersmithQueenNP.jpg</PICTURE>
		<LAT>43.671950119455026</LAT>
		<LNG>-79.29103403080798</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LN160</ID>
		<PNAME>Mildenhall Road</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and a hydro pole within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>March 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>MildenhallRoad.jpg</PICTURE>
		<LAT>43.72985749988755</LAT>
		<LNG>-79.38885940008859</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-006</ID>
		<PNAME>Alton Towers Circle Revised Timeline</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing a transformer on city-owned property near the lot. Please note that we may require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>AltonTowers.jpg</PICTURE>
		<LAT>43.82519675283201</LAT>
		<LNG>-79.27319399341056</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210227-ED151247</ID>
		<PNAME>Bermondsey Spot Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BermondseySpot.jpg</PICTURE>
		<LAT>43.749282397461464</LAT>
		<LNG>-79.37846616294405</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210227-ED151247</ID>
		<PNAME>Bermondsey Spot Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BermondseySpot.jpg</PICTURE>
		<LAT>43.73529403765756</LAT>
		<LNG>-79.36027527071779</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210227-ED151011</ID>
		<PNAME>Glenwood - O'Connor Replacement</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging overhead electrical system in the community to help improve service reliability. The rebuild includes upgrading overhead electrical cables and transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>GlenwoodOConnor.jpg</PICTURE>
		<LAT>43.70688548425164</LAT>
		<LNG>-79.31265740706112</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E16342</ID>
		<PNAME>Steeles – Brimley Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>SteelesBrimley.jpg</PICTURE>
		<LAT>43.82553019782906</LAT>
		<LNG>-79.28762588919335</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200193-ZD164015</ID>
		<PNAME>Fermanaugh Avenue Roof Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in your community to improve the reliability of your electrical service. This includes the rebuild of a vault roof on city-owned property near your lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Fermanaugh.jpg</PICTURE>
		<LAT>43.6460907530027</LAT>
		<LNG>-79.44844019774632</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200193-ZD164013</ID>
		<PNAME>Walton - Bay Roof Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in your community to improve the reliability of your electrical service. This includes the rebuild of a vault roof on city-owned property near your lot.</DESCRIPTION>
		<ACTIVITY>Network Upgrade</ACTIVITY>
		<TIMELINE>February 2021 - May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WaltonBay.jpg</PICTURE>
		<LAT>43.65799804768517</LAT>
		<LNG>-79.38511700051896</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190070-E53601-HR007</ID>
		<PNAME>1571 Sandhurst Circle</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing underground electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civl and Electrical Work</ACTIVITY>
		<TIMELINE>March 2021 – April 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1571SandhurstCircle.jpg</PICTURE>
		<LAT>43.80929726256208</LAT>
		<LNG>-79.2696475173088</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200018-ZX9901-00088</ID>
		<PNAME>Evenwood Avenue</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Street Lighting is planning to rebuild the aging street lighting infrastructure in the community to improve service reliability. This will include the installation of street lighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>March 2021 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>EvenwoodAve.jpg</PICTURE>
		<LAT>43.790438571419195</LAT>
		<LNG>-79.15458807311136</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200018-ZX9901-00094</ID>
		<PNAME>Big Pine Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Street Lighting is planning to rebuild the aging street lighting infrastructure in the community to improve service reliability. This will include the installation of street lighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>March 2021 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>BigPineRoad.jpg</PICTURE>
		<LAT>43.72783479344329</LAT>
		<LNG>-79.3581771392105</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190070-W53601-HR031</ID>
		<PNAME>530 Wilson Avenue</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>February 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>530WilsonAve.jpg</PICTURE>
		<LAT>43.73506930245919</LAT>
		<LNG>-79.44585940779099</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190070-X53601-LR023</ID>
		<PNAME>Alexandra Park Phase 2 Electrical</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>February 2021 – May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>AlexandraPark.jpg</PICTURE>
		<LAT>43.650187128475764</LAT>
		<LNG>-79.40086924543094</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200018-ZX9901-00113</ID>
		<PNAME>James Street</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Street Lighting is planning to rebuild the aging street lighting infrastructure in the community to improve service reliability. This will include the installation of street lighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>March 2021 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>JamesStreet.jpg</PICTURE>
		<LAT>43.58966740108043</LAT>
		<LNG>-79.54267514092518</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200018-ZX9901-00099</ID>
		<PNAME>Noble Street</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Street Lighting is planning to rebuild the aging street lighting infrastructure in the community to improve service reliability. This will include the installation of street lighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>March 2021 – May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>NobleSt.jpg</PICTURE>
		<LAT>43.64253939747869</LAT>
		<LNG>-79.43176883649825</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210101-XD137001</ID>
		<PNAME>Strachan – Fleet Cable Renewal Phase 1</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the underground electrical distribution system in the community to improve the reliability of the electrical service. This includes the rebuild of a vault roof on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical</ACTIVITY>
		<TIMELINE>March 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>StrachanFleet.jpg</PICTURE>
		<LAT>43.63579352498125</LAT>
		<LNG>-79.40279877048803</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20034</ID>
		<PNAME>Whitehorn - Kingslake Phase 1 Electrical</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WhitehornKingslakePhase1Electrical.jpg</PICTURE>
		<LAT>43.78957176221564</LAT>
		<LNG>-79.34768846291117</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P200014-WD152007</ID>
		<PNAME>Thorncrest Phase 10</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. The rebuild includes the installation of underground electrical cables, padmount transformers, tap boxes and hydro poles within the City of Toronto’s public property allowance and on private property. Please note that we may require access to the property to install an underground pipe that connects the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical and Civil Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – December 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ThorncrestPhase10.jpg</PICTURE>
		<LAT>43.675634195426156</LAT>
		<LNG>-79.53919617602337</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190070-W53601-HR044</ID>
		<PNAME>59 Kingsway Crescent</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and a hydro pole within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical and Civil Work</ACTIVITY>
		<TIMELINE>March 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>59KingswayCres.jpg</PICTURE>
		<LAT>43.65731526745323</LAT>
		<LNG>-79.50355805591896</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W18213</ID>
		<PNAME>The West Mall Phase 2</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>TheWestMall.jpg</PICTURE>
		<LAT>43.62698558748284</LAT>
		<LNG>-79.56268342471307</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-W10501-HR007</ID>
		<PNAME>Callowhill Drive</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing a splice vault on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing splice vault.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>April 2021 – May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CallowhillDrive.jpg</PICTURE>
		<LAT>43.6836634935552</LAT>
		<LNG>-79.56221686552368</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X11501</ID>
		<PNAME>Spadina - Sullivan</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and vault transformers on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Network Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – May 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>SpadinaSullivan.jpg</PICTURE>
		<LAT>43.65067297962521</LAT>
		<LNG>-79.39701800186646</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W14137</ID>
		<PNAME>Penn - Weston</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>PennWeston.jpg</PICTURE>
		<LAT>43.753959195699665</LAT>
		<LNG>-79.55138892923298</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-016</ID>
		<PNAME>Antelope - Goodless - Meandering	</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing a transformer on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Goodless.jpg</PICTURE>
		<LAT>43.79703661207387</LAT>
		<LNG>-79.22687990139016</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-016</ID>
		<PNAME>Antelope - Goodless - Meandering	</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing a transformer on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Antelope.jpg</PICTURE>
		<LAT>43.80877362276439</LAT>
		<LNG>-79.18728703103231</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-016</ID>
		<PNAME>Antelope - Goodless - Meandering	</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing a transformer on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Antelope.jpg</PICTURE>
		<LAT>43.81086406386094</LAT>
		<LNG>-79.18476575451065</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-015</ID>
		<PNAME>Audrelane - Grenbeck - Port Royal</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing a transformer on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Audrelane.jpg</PICTURE>
		<LAT>43.82334407223575</LAT>
		<LNG>-79.28874802329338</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-012</ID>
		<PNAME>Craigmont - Equestrian</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing a transformer on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Craigmont.jpg</PICTURE>
		<LAT>43.79781123143713</LAT>
		<LNG>-79.38015326454997</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-012</ID>
		<PNAME>Craigmont - Equestrian</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing a transformer on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Craigmont.jpg</PICTURE>
		<LAT>43.80681508169682</LAT>
		<LNG>-79.37357277326245</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-013</ID>
		<PNAME>Tangle Briarway</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing a transformer on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>February 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Tangle.jpg</PICTURE>
		<LAT>43.78415083049916</LAT>
		<LNG>-79.36748071283432</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-220110-XD183001</ID>
		<PNAME>227 Bloor Network Unit Changeout</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – March 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>227Bloor.jpg</PICTURE>
		<LAT>43.671350964120876</LAT>
		<LNG>-79.38146859584812</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18113</ID>
		<PNAME>Queen - Yonge</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables, equipment and a vault rebuild on city-owned property fronting 177 and 181 Yonge Street.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>QueenYonge.jpg</PICTURE>
		<LAT>43.65334259786448</LAT>
		<LNG>-79.37900614905679</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210030-ED170002 / P-210030-ED182004</ID>
		<PNAME>Brimley-Seminole MS Cable Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing a hydro pole on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 - October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BrimleySeminoleMSCableReplace.jpg</PICTURE>
		<LAT>43.744907299355575</LAT>
		<LNG>-79.2511298647837</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X12338</ID>
		<PNAME>King – Yonge Vault Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and a vault upgrade on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Network Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KingYonge.jpg</PICTURE>
		<LAT>43.64906984157807</LAT>
		<LNG>-79.37821955156392</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-170318-ZZ15400-3</ID>
		<PNAME>Hammersmith Queen – Beech</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Hammersmith QueenBeech.jpg</PICTURE>
		<LAT>43.67256708945962</LAT>
		<LNG>-79.28810120935415</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20319</ID>
		<PNAME>Kipling – Horner Electrical</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild and relocate the underground electrical system in the community in preparation for the GO Expansion Electrification Program. This includes upgrading underground electrical cables and installing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Work</ACTIVITY>
		<TIMELINE>March 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KiplingHorner.jpg</PICTURE>
		<LAT>43.605201431440015</LAT>
		<LNG>-79.51429491452036</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20278</ID>
		<PNAME>Jamestown Phase 3 Civil</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. The rebuild includes the installation of underground electrical cables, padmount transformers, and tap boxes within the City of Toronto’s public property allowance and on private property. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Jamestown.jpg</PICTURE>
		<LAT>43.737691167031414</LAT>
		<LNG>-79.58606445056895</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E21083</ID>
		<PNAME>Birchmount – Sheppard Electrical</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and installing a tap box on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BirchmountSheppEl.jpg</PICTURE>
		<LAT>43.77792455766837</LAT>
		<LNG>-79.30234294772656</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210227-ED151025</ID>
		<PNAME>Castlegrove Transformer Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Castlegrove.jpg</PICTURE>
		<LAT>43.74757607426014</LAT>
		<LNG>-79.31961718690013</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180671-X19102-HR003</ID>
		<PNAME>Don Roadway Phase 2</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes the upgrade of the civil structure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil Work</ACTIVITY>
		<TIMELINE>March 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DonRoadwayPh2.jpg</PICTURE>
		<LAT>43.650471642473406</LAT>
		<LNG>-79.34459099678345</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210075-XD183001</ID>
		<PNAME>Yorkville Network Upgrade</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. The rebuild includes upgrading underground electrical cables and network transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Yorkville.jpg</PICTURE>
		<LAT>43.671233830005335</LAT>
		<LNG>-79.38876047047017</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180421-WD1841</ID>
		<PNAME>Donlands Station Relocation</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot. </DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>March 2021 – March 2023</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Donlands.jpg</PICTURE>
		<LAT>43.68143688580629</LAT>
		<LNG>-79.33927095555256</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19138</ID>
		<PNAME>Hammersmith Cable Removal</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes underground cable removal on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>HammersmithCableRemoval.jpg</PICTURE>
		<LAT>43.67841771225444</LAT>
		<LNG>-79.29775023431081</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200186-XD154002</ID>
		<PNAME>Hammersmith Phase 6</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes underground cable upgrade on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>HammersmithPh6.jpg</PICTURE>
		<LAT>43.672537045503596</LAT>
		<LNG>-79.29642574606744</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X14684</ID>
		<PNAME>John Street Phase 3</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. The rebuild includes the replacement of existing electrical cables within the city-owned property near the lot. The work will take place in conjunction with the City of Toronto’s planned reconstruction to improve the John Street Corridor as part of the Council-endorsed “Cultural Corridor.”</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – June 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>JohnStreet.jpg</PICTURE>
		<LAT>43.64529841768211</LAT>
		<LNG>-79.3892139769502</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18042</ID>
		<PNAME>Dafoe – Strachan Phase 4D</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – March 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DafoeStrachanPh4D.jpg</PICTURE>
		<LAT>43.644206977243314</LAT>
		<LNG>-79.41882161978239</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190024-WD124004</ID>
		<PNAME>Runnymede TS Supply Expansion</PNAME>
		<DESCRIPTION>We’re planning to rebuild the aging underground electrical system in the community to help improve service reliability. The rebuild includes upgrading existing electrical cables and transformers within the City of Toronto’s public property allowance in front of or adjacent to the lot.  Throughout this project, planned outages may be necessary to switch from the old to the new electrical system and we intend to provide advance notice. Our crews and contractors will take extra care and precautions around the property. Please note that we may require access to the property to install an underground duct from the property. The portion of the driveway, sidewalk and other areas affected by our work will be restored upon completion of the project as season, weather and schedules permit.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2019 - June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RunnymedeTSSupply.jpg</PICTURE>
		<LAT>43.67631700881221</LAT>
		<LNG>-79.49575282678624</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18291</ID>
		<PNAME>Danforth 4kV Conversion Phase 3 Part 1A</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Danforth4kvPh3Pt1A.jpg</PICTURE>
		<LAT>43.69091547577316</LAT>
		<LNG>-79.3103875747472</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210113-XD137001</ID>
		<PNAME>Carlton - Mutual Cable Renewal</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CarltonMutualCableRenewal.jpg</PICTURE>
		<LAT>43.662230319304044</LAT>
		<LNG>-79.37804595658301</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210113-XD137001</ID>
		<PNAME>Carlton - Mutual Cable Renewal</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CarltonMutualCableRenewal.jpg</PICTURE>
		<LAT>43.66281206520163</LAT>
		<LNG>-79.37969979886138</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210113-XD137001</ID>
		<PNAME>Carlton - Mutual Cable Renewal</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CarltonMutualCableRenewal.jpg</PICTURE>
		<LAT>43.666427064139775</LAT>
		<LNG>-79.37760940636035</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210113-XD137001</ID>
		<PNAME>Carlton - Mutual Cable Renewal</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CarltonMutualCableRenewal.jpg</PICTURE>
		<LAT>43.66627837654503</LAT>
		<LNG>-79.3829978832878</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-010</ID>
		<PNAME>Highhill Transformer Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing a transformer on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Highhill.jpg</PICTURE>
		<LAT>43.7761635454656</LAT>
		<LNG>-79.31179672126451</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200154-X10501</ID>
		<PNAME>25 St Clair Avenue E</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and a network vault rebuild on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Network Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>25StClairAveE.jpg</PICTURE>
		<LAT>43.68836809572082</LAT>
		<LNG>-79.39278681559946</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200018-ZX9901-00122</ID>
		<PNAME>Birchwood-York Mills</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This includes plans to replace the existing street lighting infrastructure in the community. Please be advised that as a result of this work, a street light pole will be installed on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>March 2021 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>BirchwoodYorkMills.jpg</PICTURE>
		<LAT>43.7473450309377</LAT>
		<LNG>-79.3919250757074</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-007</ID>
		<PNAME>Alexmuir Transformer Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes replacing a transformer on city-owned property at 70 Alexmuir Boulevard.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>AlexmuirTransformerReplacement.jpg</PICTURE>
		<LAT>43.80621792451099</LAT>
		<LNG>-79.28550140992726</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E15297</ID>
		<PNAME>Victoria Park - Gordon Phase 3C </PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and rebuilding a vault on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>VictoriaParkGordanPhase3C.jpg</PICTURE>
		<LAT>43.805467704372724</LAT>
		<LNG>-79.34141490425628</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-W10501-HN089</ID>
		<PNAME>Tippett Road</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead and underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>March 2021 – May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>TippettRd.jpg</PICTURE>
		<LAT>43.73347694671755</LAT>
		<LNG>-79.44739285859302</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W20139</ID>
		<PNAME>Rosethorne MS Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RosethorneMSReplacement.jpg</PICTURE>
		<LAT>43.658562115855084</LAT>
		<LNG>-79.52949681637057</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210105-XD181001</ID>
		<PNAME>250 St George St Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Network Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – June 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>250StGeorgeStreetReplacement.jpg</PICTURE>
		<LAT>43.672521751817094</LAT>
		<LNG>-79.4018754451871</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-HN003</ID>
		<PNAME>15 Holmes Ave</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>15HolmesAve.jpg</PICTURE>
		<LAT>43.77813146760588</LAT>
		<LNG>-79.41319934904575</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E12440 / E12439</ID>
		<PNAME>Rubic Crescent Underground Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables, replacing hydro poles and installing underground tap boxes on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RubicCres.jpg</PICTURE>
		<LAT>43.78151200032747</LAT>
		<LNG>-79.26751242810701</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210027-ZX9901-00001</ID>
		<PNAME>Argo Road</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing a street lighting pole on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>March 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>ArgoRd.jpg</PICTURE>
		<LAT>43.73965598666652</LAT>
		<LNG>-79.22255585972435</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190070-W53601-LR032</ID>
		<PNAME>69 Old Forest Hill Road</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>April 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>OldForestHillRoad.jpg</PICTURE>
		<LAT>43.69885286588909</LAT>
		<LNG>-79.41617565135049</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X20177</ID>
		<PNAME>Wellington Street Cable Removal</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes an underground electrical cable upgrade.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WellingtonStCableRemoval.jpg</PICTURE>
		<LAT>43.64715649244857</LAT>
		<LNG>-79.39279937987473</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E18069</ID>
		<PNAME>Challenger-Conlins Phase 1 Civil</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and installing tap boxes on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ChallengerConlins.jpg</PICTURE>
		<LAT>43.791016567384034</LAT>
		<LNG>-79.18443539635966</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E13312</ID>
		<PNAME>Lawrence Avenue Phase 2C</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables, installing tap boxes, as well as relocating and replacing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LawAvePh2C.jpg</PICTURE>
		<LAT>43.79466281053779</LAT>
		<LNG>-79.12449559632586</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200018-ZX9901-00039</ID>
		<PNAME>Firgrove Crescent</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Streetlighting is planning to rebuild the aging infrastructure in the community to improve service reliability. This will include the installation of streetlighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>March 2021 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>FirgroveCres.jpg</PICTURE>
		<LAT>43.752687732917394</LAT>
		<LNG>-79.51963135252329</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200018-ZX9901-00123</ID>
		<PNAME>Fisherville Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Streetlighting is planning to rebuild the aging infrastructure in the community to improve service reliability. This will include the installation of streetlighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>March 2021 – May 2021</TIMELINE>
		<PSTATUS>Completed</PSTATUS>
		<PICTURE>FishervilleRd.jpg</PICTURE>
		<LAT>43.78965725888101</LAT>
		<LNG>-79.44965053768512</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E14035 / E13212</ID>
		<PNAME>Teesdale Place</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables, installing tap boxes, a switchgear and replacing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>TeesdalePlace.jpg</PICTURE>
		<LAT>43.69673072948238</LAT>
		<LNG>-79.28674425907816</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190379-XD154001</ID>
		<PNAME>Sherbourne-Isabella Phase 1 Part A</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables, trenching and the installation of civil ducts, rebuilding cable chambers and cable chamber roofs, and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>SherbourneIsabella.jpg</PICTURE>
		<LAT>43.67091914371766</LAT>
		<LNG>-79.38029612031515</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210027-ZX9901-00006</ID>
		<PNAME>Bainhart Crescent</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>April 2021 – May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BainhartCres.jpg</PICTURE>
		<LAT>43.767305298383135</LAT>
		<LNG>-79.24611063903531</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-183015-XD15400</ID>
		<PNAME>Queen-Coxwell</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and relocating hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>QueenCoxwell.jpg</PICTURE>
		<LAT>43.666445022943094</LAT>
		<LNG>-79.31606586604809</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-170161-XD161001</ID>
		<PNAME>High Park Transformer Replacements</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing transformers on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 - September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>HighParkTransformerReplacement.jpg</PICTURE>
		<LAT>43.64568326517812</LAT>
		<LNG>-79.45508382373832</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X13177</ID>
		<PNAME>Dundas - Annette</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DundasAnnette.jpg</PICTURE>
		<LAT>43.6628009992121</LAT>
		<LNG>-79.4575384630575</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-220103-WD124001</ID>
		<PNAME>Horner TS Load Relief Phase 1</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes the installation of overhead and underground electrical cables and installing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>HornerTSLoadReliefPh1.jpg</PICTURE>
		<LAT>43.60428488232518</LAT>
		<LNG>-79.51949415105128</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X11236</ID>
		<PNAME>Windsor Feeder Electrical</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – April 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WindsorFeederElectrical.jpg</PICTURE>
		<LAT>43.646424855137326</LAT>
		<LNG>-79.3856711451609</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18290</ID>
		<PNAME>Danforth Avenue Phase 2B Part 1</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DanforthPh2Bpt1.jpg</PICTURE>
		<LAT>43.6782819438923</LAT>
		<LNG>-79.31297835006754</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190644-ED161000</ID>
		<PNAME>Warden-Cass</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables, as well as installing transformers and underground tap boxes on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WardenCass.jpg</PICTURE>
		<LAT>43.776776029203596</LAT>
		<LNG>-79.30509803885819</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180432-ED1051</ID>
		<PNAME>Warden - Minford</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>March 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WardenMinford.jpg</PICTURE>
		<LAT>43.73672769203326</LAT>
		<LNG>-79.29028367049457</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210014-E10501-LN004</ID>
		<PNAME>Vanwart Drive</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>April 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>VanwartDrive.jpg</PICTURE>
		<LAT>43.75973708067119</LAT>
		<LNG>-79.21659337384459</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-021018-ZD0002-11111-1</ID>
		<PNAME>Earlscourt Avenue</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>March 2021 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Earlscourt.jpg</PICTURE>
		<LAT>43.68495923351248</LAT>
		<LNG>-79.45069210320024</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-150079-ZD2993</ID>
		<PNAME>Augusta - Baldwin</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>AugustaBaldwin.jpg</PICTURE>
		<LAT>43.65394335924073</LAT>
		<LNG>-79.40047704270512</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E19074</ID>
		<PNAME>Old Sheppard Avenue Electrical Phase A</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>OldSheppAve.jpg</PICTURE>
		<LAT>43.77886804136866</LAT>
		<LNG>-79.33251734142205</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E16133</ID>
		<PNAME>Scunthorpe Phase F Electrical</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ScunthorpePhF.jpg</PICTURE>
		<LAT>43.79009530043038</LAT>
		<LNG>-79.24080896237332</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200019-ZX9902-00062</ID>
		<PNAME>Alexandra Park Phase 2 Streetlight Relocations</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>February 2021 – May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>AlexParkPh2.jpg</PICTURE>
		<LAT>43.65129510844576</LAT>
		<LNG>-79.39915581050921</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20300</ID>
		<PNAME>Ellesmere – Zezel Way</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community in preparation for the GO Expansion Electrification program. This includes rebuilding and relocating overhead and underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>April 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>EllesmereZezel.jpg</PICTURE>
		<LAT>43.766891953587184</LAT>
		<LNG>-79.275384582282</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W15309</ID>
		<PNAME>401 and 409 Highway Crossing Phase 3</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables, replacing hydro poles and transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – February 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>401409Highway.jpg</PICTURE>
		<LAT>43.69753368787754</LAT>
		<LNG>-79.56922595257764</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210555-XD124001</ID>
		<PNAME>Eglinton – Mount Pleasant Revised Timeline</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead and underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>EglintonMount.jpg</PICTURE>
		<LAT>43.72511398581279</LAT>
		<LNG>-79.40217883749487</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210555-XD124001</ID>
		<PNAME>Eglinton – Mount Pleasant Revised Timeline</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead and underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>EglintonMount.jpg</PICTURE>
		<LAT>43.7203853074697</LAT>
		<LNG>-79.39495578471187</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210555-XD124001</ID>
		<PNAME>Eglinton – Mount Pleasant Revised Timeline</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead and underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>EglintonMount.jpg</PICTURE>
		<LAT>43.70643649916133</LAT>
		<LNG>-79.40037844397473</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164015</ID>
		<PNAME>Keeler-Groomsport</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KeelerGroomsport.jpg</PICTURE>
		<LAT>43.79446455777272</LAT>
		<LNG>-79.20366391028725</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164015</ID>
		<PNAME>Keeler-Groomsport</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KeelerGroomsport.jpg</PICTURE>
		<LAT>43.79061955905595</LAT>
		<LNG>-79.21590956285459</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164015</ID>
		<PNAME>Keeler-Groomsport</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KeelerGroomsport.jpg</PICTURE>
		<LAT>43.78938432179565</LAT>
		<LNG>-79.24817298351873</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164015</ID>
		<PNAME>Keeler-Groomsport</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KeelerGroomsport.jpg</PICTURE>
		<LAT>43.785923305470455</LAT>
		<LNG>-79.306958247283</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-160676-ZD1051</ID>
		<PNAME>135 Plunkett Road Phase 2</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>April 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>135PlunkettRdPh2.jpg</PICTURE>
		<LAT>43.76231782493098</LAT>
		<LNG>-79.57047190746172</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164012</ID>
		<PNAME>Neilson - Sheppard Spot Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>NeilsonShepp.jpg</PICTURE>
		<LAT>43.814582001747695</LAT>
		<LNG>-79.22404326383743</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164012</ID>
		<PNAME>Neilson - Sheppard Spot Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>NeilsonShepp.jpg</PICTURE>
		<LAT>43.80891841444311</LAT>
		<LNG>-79.18071135887106</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164012</ID>
		<PNAME>Neilson - Sheppard Spot Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>NeilsonShepp.jpg</PICTURE>
		<LAT>43.781464255133855</LAT>
		<LNG>-79.21711843025149</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164012</ID>
		<PNAME>Neilson - Sheppard Spot Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>NeilsonShepp.jpg</PICTURE>
		<LAT>43.682355577386296</LAT>
		<LNG>-79.28052698614317</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LS163</ID>
		<PNAME>Bluenose-Muirbank</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and installing tap boxes on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BluenoseMuirbank.jpg</PICTURE>
		<LAT>43.79367370482516</LAT>
		<LNG>-79.16277362628058</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210027-ZX9901-00009</ID>
		<PNAME>57 Briar Dale Boulevard</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>May 2021 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>57BriarDaleBlvd.jpg</PICTURE>
		<LAT>43.6848577480284</LAT>
		<LNG>-79.27682660690161</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E15297</ID>
		<PNAME>Victoria Park-Gordon Phase D</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and installing padmount transformers on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the place of business to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>VictoriaGordonPhD.jpg</PICTURE>
		<LAT>43.805865553341306</LAT>
		<LNG>-79.33979010870435</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-055</ID>
		<PNAME>Lawrence-The Donway Part 4</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing electrical switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LawrenceTheDonwayPt4.jpg</PICTURE>
		<LAT>43.73213743385217</LAT>
		<LNG>-79.34168493936328</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-054</ID>
		<PNAME>Lawrence-The Donway Part 3 </PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing electrical switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LawrenceTheDonwayPt3.jpg</PICTURE>
		<LAT>43.734361189289864</LAT>
		<LNG>-79.3400995438488</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-053</ID>
		<PNAME>Lawrence-The Donway Part 2</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing electrical switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LawrenceTheDonwayPt2.jpg</PICTURE>
		<LAT>43.74121558493393</LAT>
		<LNG>-79.34460233490677</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190070-E53601-HR020</ID>
		<PNAME>Bayview – Balliol</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BayviewBalliol.jpg</PICTURE>
		<LAT>43.701542962372514</LAT>
		<LNG>-79.37436657303726</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-004</ID>
		<PNAME>Bridletowne–Elmfield-Holmbush</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BridletowneElmfieldHolmbush.jpg</PICTURE>
		<LAT>43.794075430742545</LAT>
		<LNG>-79.31849054079726</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-004</ID>
		<PNAME>Bridletowne–Elmfield-Holmbush</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BridletowneElmfieldHolmbush.jpg</PICTURE>
		<LAT>43.82089106533794</LAT>
		<LNG>-79.3086105470463</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180240-Z18402-HD001</ID>
		<PNAME>Agincourt Underground Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and installing tap boxes on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>April 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>AgincourtUndergroundRebuild.jpg</PICTURE>
		<LAT>43.78600593105937</LAT>
		<LNG>-79.28521389367909</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190511-ED164003-201</ID>
		<PNAME>2222 Ellesmere Road</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing a padmount transformer on the private property at 2222 Ellesmere Road (Woburn Collegiate) near the residence.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – August 2021 </TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>2222EllesmereRoad.jpg</PICTURE>
		<LAT>43.77757922323008</LAT>
		<LNG>-79.22798163468707</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-052</ID>
		<PNAME>Bond-Don Mills</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables, replacing hydro poles and replacing porcelain switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BondDonMills.jpg</PICTURE>
		<LAT>43.7455865935584</LAT>
		<LNG>-79.34954204631967</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19188</ID>
		<PNAME>Davenport - Wiltshire Phase 1 Electrical</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – May 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DavenportWiltshire.jpg</PICTURE>
		<LAT>43.663027538571</LAT>
		<LNG>-79.45137395905921</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W21120</ID>
		<PNAME>Antibes Drive</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables, replacing transformers and switches in the existing vault on the private property. Toronto Hydro will require access to the vault on the property to replace the existing underground equipment.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>AntibesDr.jpg</PICTURE>
		<LAT>43.78003690154284</LAT>
		<LNG>-79.4462630114752</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164013</ID>
		<PNAME>Romanway - Navaho - Plum Treeway Transformer Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing submersible transformers on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RomanwayNavaho.jpg</PICTURE>
		<LAT>43.730631885611636</LAT>
		<LNG>-79.45845376699135</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164013</ID>
		<PNAME>Romanway - Navaho - Plum Treeway Transformer Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing submersible transformers on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RomanwayNavaho.jpg</PICTURE>
		<LAT>43.799695355505115</LAT>
		<LNG>-79.33656649471806</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164013</ID>
		<PNAME>Romanway - Navaho - Plum Treeway Transformer Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing submersible transformers on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RomanwayNavaho.jpg</PICTURE>
		<LAT>43.70042359550092</LAT>
		<LNG>-79.50398000675844</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164013</ID>
		<PNAME>Romanway - Navaho - Plum Treeway Transformer Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing submersible transformers on city-owned property near the lot. Toronto Hydro may also require access to the property to replace the existing transformer.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RomanwayNavaho.jpg</PICTURE>
		<LAT>43.78186926690176</LAT>
		<LNG>-79.44881989646984</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190049-XD154003</ID>
		<PNAME>Dundas - Bloor</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – May 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DundasBloor.jpg</PICTURE>
		<LAT>43.658315328896464</LAT>
		<LNG>-79.46152851744237</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-047</ID>
		<PNAME>4771 Steeles Avenue East</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead and underground electrical cables and replacing switchgears on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>4771SteelesAveE.jpg</PICTURE>
		<LAT>43.82548420059873</LAT>
		<LNG>-79.29895123599123</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E20303</ID>
		<PNAME>Lawrence-Jenkinson Revised Timeline</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community in preparation for the GO Expansion Electrification program. This includes rebuilding and relocating overhead and underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>May 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LawrenceJenkinson.jpg</PICTURE>
		<LAT>43.750240307851215</LAT>
		<LNG>-79.27138480303094</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-205000-ED166004-040</ID>
		<PNAME>Sheppard – George Henry</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>SheppardGeorge.jpg</PICTURE>
		<LAT>43.77476565837641</LAT>
		<LNG>-79.34893857299902</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-003</ID>
		<PNAME>Morningside - Neilson</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>MorningsideNeilson.jpg</PICTURE>
		<LAT>43.82778531855722</LAT>
		<LNG>-79.23293322905324</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-003</ID>
		<PNAME>Morningside - Neilson</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>MorningsideNeilson.jpg</PICTURE>
		<LAT>43.82544485526781</LAT>
		<LNG>-79.2296542797161</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-003</ID>
		<PNAME>Morningside - Neilson</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>MorningsideNeilson.jpg</PICTURE>
		<LAT>43.807090904339034</LAT>
		<LNG>-79.22527781053354</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190059-Z13501-HN001</ID>
		<PNAME>Valley Woods Road Phase 1</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead and underground electrical cables and replacing cable chambers on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ValleyWoodsRoad.jpg</PICTURE>
		<LAT>43.75907079243854</LAT>
		<LNG>-79.33169129044951</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-018</ID>
		<PNAME>Castlethorpe Drive</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing an underground transformer with a visible grated lid on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CastlethorpeDr.jpg</PICTURE>
		<LAT>43.76110328745086</LAT>
		<LNG>-79.27996678119925</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-018</ID>
		<PNAME>Castlethorpe Drive</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing an underground transformer with a visible grated lid on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>CastlethorpeDr.jpg</PICTURE>
		<LAT>43.736028942008026</LAT>
		<LNG>-79.23481430503878</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X16436</ID>
		<PNAME>Yonge – Eglinton</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and rebuilding underground vaults on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>YongeEglinton.jpg</PICTURE>
		<LAT>43.705648534099836</LAT>
		<LNG>-79.39807914988394</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210027-ZX9901-00010</ID>
		<PNAME>Alcester Court</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to rebuild the aging streetlighting infrastructure in the community to improve service reliability. This will include the installation of streetlighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>May 2021 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>AlcesterCrt.jpg</PICTURE>
		<LAT>43.723883003843326</LAT>
		<LNG>-79.45027136576304</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-218000-WD124002</ID>
		<PNAME>Jane - Woolner Phase 2A</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables, upgrading cable chambers and replacing hydro poles on a city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – October 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>JaneWoolnerPhase2A.jpg</PICTURE>
		<LAT>43.684559839250994</LAT>
		<LNG>-79.49882653265986</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID> </ID>
		<PNAME>Loma Road</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and installing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>May 2021 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LomaRd.jpg</PICTURE>
		<LAT>43.62704474244197</LAT>
		<LNG>-79.50907475273962</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190121-W10501-HN002</ID>
		<PNAME>Finch - Keele</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables, replacing hydro poles and installing tap boxes and switchgears on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – June 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FinchKeele.jpg</PICTURE>
		<LAT>43.763477563281484</LAT>
		<LNG>-79.49107765714867</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-E10501-LN032</ID>
		<PNAME>223 Village Green Square</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and installing tap boxes on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>April 2021 – May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>223VillageGreenSq.jpg</PICTURE>
		<LAT>43.77941684989764</LAT>
		<LNG>-79.2824152981233</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210193-XD136001</ID>
		<PNAME>Dundas - Humberside</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading the cable chamber on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>June 2021 - November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DundasHumberside.jpg</PICTURE>
		<LAT>43.66303520132789</LAT>
		<LNG>-79.45651332944715</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210027-ZX9901-00014</ID>
		<PNAME>Keele - George Butchart</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to rebuild the aging streetlighting infrastructure in the community to improve service reliability. This will include the installation of streetlighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>May 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KeeleGeorgeButchart.jpg</PICTURE>
		<LAT>43.732544955358</LAT>
		<LNG>-79.48344545888747</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18244</ID>
		<PNAME>Walker - Yonge Network Upgrade</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WalkerYongeNetworkUpgrade.jpg</PICTURE>
		<LAT>43.682735651820565</LAT>
		<LNG>-79.39560317300398</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18291</ID>
		<PNAME>Danforth 4kV Conversion Phase 3 Part 1B</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead and underground electrical cables, as well as replacing hydro poles, transformers and switches on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe or overhead cable connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DanforthPh3Pt1B.jpg</PICTURE>
		<LAT>43.684917753632945</LAT>
		<LNG>-79.30949548777092</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-021</ID>
		<PNAME>Mansewood Gardens</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes replacing underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>MansewoodGardens.jpg</PICTURE>
		<LAT>43.76981756403897</LAT>
		<LNG>-79.17530613700926</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-W10501-HS130</ID>
		<PNAME>1168 Caledonia Road</PNAME>
		<DESCRIPTION>Please be advised that as a result of the construction to the neighbour’s property, Toronto Hydro will be upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>May 2021 – June 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1168CaledoniaRd.jpg</PICTURE>
		<LAT>43.71574864275861</LAT>
		<LNG>-79.46760441249752</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200023-W19101-HR011</ID>
		<PNAME>Dynevor - Ennerdale</PNAME>
		<DESCRIPTION>Toronto Hydro is relocating the electrical distribution system in the community to accommodate construction of the city’s storm sewer installation. This relocation includes the installation of overhead electrical cables and the replacement of hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DynevorEnnerdale.jpg</PICTURE>
		<LAT>43.691061641122374</LAT>
		<LNG>-79.45057610672889</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200015-W19007</ID>
		<PNAME>Richview Phase 8 Revised Timeline Update</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing underground electrical cables and a switchgear on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Work</ACTIVITY>
		<TIMELINE>May 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RichviewPh8Revised.jpg</PICTURE>
		<LAT>43.699382617387194</LAT>
		<LNG>-79.5870076912083</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-009</ID>
		<PNAME>Sesame – Huntingwood</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing transformers on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>SesameHuntingwood.jpg</PICTURE>
		<LAT>43.78140321833144</LAT>
		<LNG>-79.32146339521672</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210113-XD137003</ID>
		<PNAME>Church – Dundonald</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – December 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ChurchDundonald.jpg</PICTURE>
		<LAT>43.66369525776366</LAT>
		<LNG>-79.38013079697502</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200023-W19101-HR008</ID>
		<PNAME>Bicknell - Westbury</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables, installing hydro poles and a tap box on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BicknellWestbury.jpg</PICTURE>
		<LAT>43.68453671588047</LAT>
		<LNG>-79.47492328152693</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200023-W19101-HR013</ID>
		<PNAME>Scott - Dunraven</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to relocate the overhead electrical system in the community to facilitate the City of Toronto’s work. This includes the relocation of hydro poles on the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ScottDunraven.jpg</PICTURE>
		<LAT>43.684558964381644</LAT>
		<LNG>-79.47005786600904</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200023-W19101-HR012</ID>
		<PNAME>Harvie – Kitchener</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to relocate the overhead electrical system in the community to facilitate the City of Toronto’s work. This includes the relocation of hydro poles on the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>HarvieKitchener.jpg</PICTURE>
		<LAT>43.68992776715403</LAT>
		<LNG>-79.45514099992394</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210079-WD161006</ID>
		<PNAME>Southport Street</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and a vault upgrade on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>SouthportSt.jpg</PICTURE>
		<LAT>43.63913948381006</LAT>
		<LNG>-79.47325488059577</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210107-XD136001</ID>
		<PNAME>Dundas - Lansdowne Cable Upgrade</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>July 2021– October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DundasLansdowne.jpg</PICTURE>
		<LAT>43.64987070133954</LAT>
		<LNG>-79.44033528794283</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180457-ZD1051</ID>
		<PNAME>4 Tippett Road Phase 2</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be upgrading overhead and underground electrical cables and installing a switchgear and a hydro pole on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>4TippettRd.jpg</PICTURE>
		<LAT>43.733913052758226</LAT>
		<LNG>-79.44694070365486</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190058-Z13001-HN009</ID>
		<PNAME>Downsview Park - Stanley Greene</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be upgrading underground electrical cables within the city-owned property near the lot, to supply a new townhouse development.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DownsviewStanley.jpg</PICTURE>
		<LAT>43.73625254258188</LAT>
		<LNG>-79.47926940323333</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190153-E18402-HR001</ID>
		<PNAME>Eglinton-Commonwealth</PNAME>
		<DESCRIPTION>Toronto Hydro is relocating hydro poles on city-owned property near the lot to enable Metrolinx to begin construction of the new Scarborough Subway Extension. This includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>May 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>EglintonCommonwealth.jpg</PICTURE>
		<LAT>43.73482331078772</LAT>
		<LNG>-79.25686582051453</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210259-ED151000</ID>
		<PNAME>Bayview-Railside-Hollinger</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing hydro poles and electrical switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BayviewW19.jpg</PICTURE>
		<LAT>43.71179718777907</LAT>
		<LNG>-79.31621060914857</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210259-ED151000</ID>
		<PNAME>Bayview-Railside-Hollinger</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing hydro poles and electrical switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BayviewW21.jpg</PICTURE>
		<LAT>43.76491581842842</LAT>
		<LNG>-79.29380116272513</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210259-ED151000</ID>
		<PNAME>Bayview-Railside-Hollinger</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing hydro poles and electrical switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BayviewW1718.jpg</PICTURE>
		<LAT>43.78031668831091</LAT>
		<LNG>-79.39112583046061</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210259-ED151000</ID>
		<PNAME>Bayview-Railside-Hollinger</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing hydro poles and electrical switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BayviewW16.jpg</PICTURE>
		<LAT>43.759904314102144</LAT>
		<LNG>-79.35561187759836</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210259-ED151000</ID>
		<PNAME>Bayview-Railside-Hollinger</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing hydro poles and electrical switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BayviewW16.jpg</PICTURE>
		<LAT>43.747956735984715</LAT>
		<LNG>-79.34778251873337</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210259-ED151000</ID>
		<PNAME>Bayview-Railside-Hollinger</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing hydro poles and electrical switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BayviewW16.jpg</PICTURE>
		<LAT>43.73866458734495</LAT>
		<LNG>-79.3240354365676</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-050</ID>
		<PNAME>Queenscourt – Roundwood</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Queenscourt.jpg</PICTURE>
		<LAT>43.7899639083536</LAT>
		<LNG>-79.3107338903302</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-050</ID>
		<PNAME>Queenscourt – Roundwood</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Queenscourt.jpg</PICTURE>
		<LAT>43.78321353704018</LAT>
		<LNG>-79.30514186832534</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-050</ID>
		<PNAME>Queenscourt – Roundwood</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Queenscourt.jpg</PICTURE>
		<LAT>43.79477811885683</LAT>
		<LNG>-79.29715786431323</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200023-W19101-HR017</ID>
		<PNAME>Nashville- Bicknell</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to relocate the overhead electrical system in the community, to accommodate City of Toronto watermain and storm sewer rehabilitation. This relocation includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>NashvilleBicknell.jpg</PICTURE>
		<LAT>43.68388953296981</LAT>
		<LNG>-79.47355092021365</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200023-W19101-HR015</ID>
		<PNAME>Silverthorn - Kenora</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to relocate the overhead electrical system in the community, to accommodate City of Toronto watermain and storm sewer rehabilitation. This relocation includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>SilverthornKenora.jpg</PICTURE>
		<LAT>43.68370905558993</LAT>
		<LNG>-79.46362692103433</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200023-W19101-HR014</ID>
		<PNAME>Silverthorn - Dunraven</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to relocate the overhead electrical system in the community, to accommodate City of Toronto watermain and storm sewer rehabilitation. This relocation includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>SilverthornDunraven.jpg</PICTURE>
		<LAT>43.68379247915526</LAT>
		<LNG>-79.46578510339495</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E19155</ID>
		<PNAME>Pape – Sammon</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and installing electrical switches on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>PapeSammon.jpg</PICTURE>
		<LAT>43.69618296044057</LAT>
		<LNG>-79.35019313964057</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E19155</ID>
		<PNAME>Pape – Sammon</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and installing electrical switches on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>PapeSammon.jpg</PICTURE>
		<LAT>43.69444047006161</LAT>
		<LNG>-79.34410844544588</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E19155</ID>
		<PNAME>Pape – Sammon</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and installing electrical switches on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>PapeSammon.jpg</PICTURE>
		<LAT>43.69039654727694</LAT>
		<LNG>-79.34914964926075</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E19155</ID>
		<PNAME>Pape – Sammon</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and installing electrical switches on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the house to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>PapeSammon.jpg</PICTURE>
		<LAT>43.68447649609741</LAT>
		<LNG>-79.34666661344599</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-W10501-LN126</ID>
		<PNAME>600 Dixon Road</PNAME>
		<DESCRIPTION>As a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables, transformers and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>May 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>600DixonRd.jpg</PICTURE>
		<LAT>43.69372114344598</LAT>
		<LNG>-79.5718723379584</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200023-W19101-HR005</ID>
		<PNAME>Westbury Crescent</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to relocate the overhead electrical system in the community, to accommodate City of Toronto watermain and storm sewer rehabilitation. This relocation includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>WestburyCres.jpg</PICTURE>
		<LAT>43.68532655767064</LAT>
		<LNG>-79.47703261751904</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-X10501-HT015</ID>
		<PNAME>698 Spadina Avenue</PNAME>
		<DESCRIPTION>As a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables, transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>698Spadina.jpg</PICTURE>
		<LAT>43.66565562400501</LAT>
		<LNG>-79.40339960282564</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-230011-ED161006</ID>
		<PNAME>81 Curlew Drive</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing hydro poles and underground transformers on private property. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the property to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>81CurlewDr.jpg</PICTURE>
		<LAT>43.74255834396804</LAT>
		<LNG>-79.31670320629632</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18292</ID>
		<PNAME>Danforth 4kv Conversion Phase 4 Electrical</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe or overhead cable connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – May 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Danforth4kvConversionPh4Electrical.jpg</PICTURE>
		<LAT>43.68816406727985</LAT>
		<LNG>-79.3018392854996</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LS146</ID>
		<PNAME>8 Goodless Court</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be upgrading an underground transformer on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>8GoodlessCrt.jpg</PICTURE>
		<LAT>43.79771442781094</LAT>
		<LNG>-79.22719608041957</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>M-200036-WD857004-042</ID>
		<PNAME>1491 Castlefield Avenue</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing a transformer on the private property.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1491CastlefieldAve.jpg</PICTURE>
		<LAT>43.69602626705379</LAT>
		<LNG>-79.46776091871995</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-180699-WD151002</ID>
		<PNAME>Gulliver Road</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>GulliverRd</PICTURE>
		<LAT>43.69878474016941</LAT>
		<LNG>-79.47989747096662</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190070-W53601-HR046</ID>
		<PNAME>The Queensway Relocation Phase 2</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be temporarily relocating the overhead electrical cables to the east side of Zorra Street and installing hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>QueenswayRelocationPh2.jpg</PICTURE>
		<LAT>43.621871454800676</LAT>
		<LNG>-79.52230888927609</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E21087</ID>
		<PNAME>Direct Buried Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and installing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DirectBuriedRebuild.jpg</PICTURE>
		<LAT>43.720548234394776</LAT>
		<LNG>-79.37944076085446</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E21087</ID>
		<PNAME>Direct Buried Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and installing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DirectBuriedRebuild.jpg</PICTURE>
		<LAT>43.730543669792894</LAT>
		<LNG>-79.36645556514435</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E21087</ID>
		<PNAME>Direct Buried Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and installing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DirectBuriedRebuild.jpg</PICTURE>
		<LAT>43.727140061189154</LAT>
		<LNG>-79.36177448292696</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210095-XD136001</ID>
		<PNAME>1728 Bloor Street West Roof Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing the roof of a cable chamber on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1728BloorStW.jpg</PICTURE>
		<LAT>43.655169613810074</LAT>
		<LNG>-79.45870204639857</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200219-ZDX9901-005</ID>
		<PNAME>Lake Shore Drive Phase 3B</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to upgrade the aging street lighting infrastructure in the community to improve service reliability. This will include the installation of street lighting poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Work</ACTIVITY>
		<TIMELINE>July 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LakeShoreDrPh3B.jpg</PICTURE>
		<LAT>43.595644301766946</LAT>
		<LNG>-79.50734819035071</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200027-X19101-HR002</ID>
		<PNAME>TTC Museum Station Relocation</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to relocate the underground electrical system in the community in preparation for TTC’s Museum Station Construction.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>TTCMuseumStationRelocation.jpg</PICTURE>
		<LAT>43.66725410239886</LAT>
		<LNG>-79.39352674845038</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210274-ZD164006</ID>
		<PNAME>Tweedsmuir Roof Rebuild</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to upgrade the aging underground electrical system in the community to help improve service reliability. This includes the rebuild of a cable chamber roof on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>TweedsmuirRoofRebuild.jpg</PICTURE>
		<LAT>43.6855603760964</LAT>
		<LNG>-79.41395859087173</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210014-E101501-LN010</ID>
		<PNAME>26 Greensboro Drive</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>26Greensboro.jpg</PICTURE>
		<LAT>43.70325414338701</LAT>
		<LNG>-79.56011643572513</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W12308</ID>
		<PNAME>Brookwell Drive</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables, replacing hydro poles and transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BrookwellDr.jpg</PICTURE>
		<LAT>43.74427125517368</LAT>
		<LNG>-79.49373471672942</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210098-XD136001</ID>
		<PNAME>83 Charles Street East Roof Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading the cable chamber roof on city-owned property near the lot</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>83CharlesStE.jpg</PICTURE>
		<LAT>43.66968787896515</LAT>
		<LNG>-79.38119501876906</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200193-ZD164016</ID>
		<PNAME>Broadview – First Roof Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BroadviewFirst.jpg</PICTURE>
		<LAT>43.664596597320525</LAT>
		<LNG>-79.35223647456489</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210096-XD136001</ID>
		<PNAME>King - Victoria Roof Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing the roof of a cable chamber on city owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KingVictoriaRoofRebuild.jpg</PICTURE>
		<LAT>43.64897765686264</LAT>
		<LNG>-79.37719370311632</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X17213</ID>
		<PNAME>Thorncliffe Park Phase 3 Electrical</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes the installation of civil infrastructure and upgrading electrical cables on city owned property. In addition, existing transformer vaults will be upgraded.  Toronto Hydro may require access if you have a transformer vault on the property.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ThorncliffeParkPh3El.jpg</PICTURE>
		<LAT>43.705505596293385</LAT>
		<LNG>-79.35071340516232</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-X10501-HN126</ID>
		<PNAME>92 Front Street East</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>92FrontStE.jpg</PICTURE>
		<LAT>43.65047141608346</LAT>
		<LNG>-79.3718922365348</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200219-ZDX99001-002</ID>
		<PNAME>O'Connor-St. Clair Phase 1C</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to rebuild the aging streetlighting infrastructure in the community to improve service reliability. This will include the installation of streetlighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Work</ACTIVITY>
		<TIMELINE>July 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>OConnorStClairPh1C.jpg</PICTURE>
		<LAT>43.71592952647885</LAT>
		<LNG>-79.30375511192324</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200023-W19101-HR001</ID>
		<PNAME>Shoreham Drive</PNAME>
		<DESCRIPTION>Toronto Hydro is temporarily relocating the electrical distribution system in the community for future work in order to support the City of Toronto’s Flood Protection Project. This relocation includes isolating overhead and underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Shoreham.jpg</PICTURE>
		<LAT>43.768854669748706</LAT>
		<LNG>-79.5203645310712</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X16745</ID>
		<PNAME>King- Bay</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KingBay.jpg</PICTURE>
		<LAT>43.648321536583296</LAT>
		<LNG>-79.3817948275792</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190070-X53601-HR031</ID>
		<PNAME>316-344 Dupont Street</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be upgrading overhead and underground electrical cables and installing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>316DupontSt.jpg</PICTURE>
		<LAT>43.674222560683326</LAT>
		<LNG>-79.40938471976183</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200020-ZX9905-000163</ID>
		<PNAME>Armada - Markham</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to rebuild the aging walkway lighting infrastructure in the community to improve service reliability. This will include the installation of walkway lighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ArmadaMarkham.jpg</PICTURE>
		<LAT>43.76662981676891</LAT>
		<LNG>-79.22720309440508</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200020-ZX9905-00018</ID>
		<PNAME>Gemini - Tollerton</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to rebuild the aging walkway lighting infrastructure in the community to improve service reliability. This will include the installation of walkway lighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>GeminiTollerton.jpg</PICTURE>
		<LAT>43.78807253679836</LAT>
		<LNG>-79.3894477097779</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E13040</ID>
		<PNAME>Ironside Crescent Phase 2</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and transformers on city-owned and private property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>IronsideCresPh2.jpg</PICTURE>
		<LAT>43.82555344810951</LAT>
		<LNG>-79.24429685110644</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200020-ZX9905-00017</ID>
		<PNAME>Vradenberg - Shrewsbury</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to rebuild the aging walkway lighting infrastructure in the community to improve service reliability. This will include the installation of walkway lighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>VradenbergShrewsbury.jpg</PICTURE>
		<LAT>43.773306903027</LAT>
		<LNG>-79.30842359246765</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-170623-ZD2991</ID>
		<PNAME>177 Caledonia Road</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>177CaledoniaRd.jpg</PICTURE>
		<LAT>43.680937368527076</LAT>
		<LNG>-79.456348276448</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200020-ZX9905-00021</ID>
		<PNAME>Falstaff Avenue</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Streetlighting is planning to rebuild the aging infrastructure in the community to improve service reliability. This will include the installation of streetlighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FalstaffAve.jpg</PICTURE>
		<LAT>43.71838814458523</LAT>
		<LNG>-79.4930301405504</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200020-ZX9905-00019</ID>
		<PNAME>Moore Park - Pleasant Avenue</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to upgrade the aging walkway lighting infrastructure in the community to improve service reliability. This will include the installation of walkway lighting on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>MooreParkPleasantAve.jpg</PICTURE>
		<LAT>43.792797596032734</LAT>
		<LNG>-79.42179714581005</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-024</ID>
		<PNAME>Meadowvale - Lawson</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>MeadowvaleLawson.jpg</PICTURE>
		<LAT>43.7806983286927</LAT>
		<LNG>-79.15503864031315</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-024</ID>
		<PNAME>Meadowvale - Lawson</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing underground transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>MeadowvaleLawson.jpg</PICTURE>
		<LAT>43.786574902996534</LAT>
		<LNG>-79.16061055610065</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-170491-ZD2991</ID>
		<PNAME>Jethro - Mayall</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>June 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>JethroMayall.jpg</PICTURE>
		<LAT>43.725989288645785</LAT>
		<LNG>-79.52090061241289</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190153-E18404-HR001</ID>
		<PNAME>Eglinton - Danforth </PNAME>
		<DESCRIPTION>Toronto Hydro is relocating hydro poles on city-owned property near the lot to enable Metrolinx to begin construction of the new Scarborough Subway Extension. This includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>EglintonDanforth.jpg</PICTURE>
		<LAT>43.73810138283375</LAT>
		<LNG>-79.24578996943853</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164021</ID>
		<PNAME>Dufferin-Apache-Reiber-Ferrand</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing existing aging transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Dufferin1.jpg</PICTURE>
		<LAT>43.71261822870692</LAT>
		<LNG>-79.45880867603788</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164021</ID>
		<PNAME>Dufferin-Apache-Reiber-Ferrand</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing existing aging transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Dufferin2.jpg</PICTURE>
		<LAT>43.73594268481107</LAT>
		<LNG>-79.4047201382876</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164021</ID>
		<PNAME>Dufferin-Apache-Reiber-Ferrand</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing existing aging transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Dufferin3.jpg</PICTURE>
		<LAT>43.72184281867606</LAT>
		<LNG>-79.33329382232742</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164021</ID>
		<PNAME>Dufferin-Apache-Reiber-Ferrand</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing existing aging transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Dufferin3.jpg</PICTURE>
		<LAT>43.7274652263768</LAT>
		<LNG>-79.32866501014074</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164021</ID>
		<PNAME>Dufferin-Apache-Reiber-Ferrand</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing existing aging transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Dufferin5.jpg</PICTURE>
		<LAT>43.79818132581821</LAT>
		<LNG>-79.33496913920284</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164021</ID>
		<PNAME>Dufferin-Apache-Reiber-Ferrand</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing existing aging transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Dufferin4.jpg</PICTURE>
		<LAT>43.794399267025945</LAT>
		<LNG>-79.3738668973427</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164021</ID>
		<PNAME>Dufferin-Apache-Reiber-Ferrand</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing existing aging transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>Dufferin6.jpg</PICTURE>
		<LAT>43.793812212040514</LAT>
		<LNG>-79.4192595425815</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-075</ID>
		<PNAME>Don Mills-York Mills Phase 2</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead and underground electrical cables and relocating hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DonMillsYorkMillsPh2.jpg</PICTURE>
		<LAT>43.7526514730381</LAT>
		<LNG>-79.34990230796005</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180261--Z19101-LR021</ID>
		<PNAME>TTC High Park Station</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to relocate the overhead and underground electrical system in the community in preparation for TTC’s High Park Station Construction.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>TTCHigh Park Station.jpg</PICTURE>
		<LAT>43.65358077132567</LAT>
		<LNG>-79.46703590519299</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-066</ID>
		<PNAME>Barber Greene-Prince Andrew Phase 1</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BarberGreenPrinceAndrew.jpg</PICTURE>
		<LAT>43.728262037703615</LAT>
		<LNG>-79.34502269529476</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-067</ID>
		<PNAME>Barber Greene-Prince Andrew Phase 2</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical switches on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BarberGreenPrinceAndrew2.jpg</PICTURE>
		<LAT>43.72915511892391</LAT>
		<LNG>-79.34755379378285</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-074</ID>
		<PNAME>Don Mills-York Mills Phase 1</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DonMillsYorkMillsPh1.jpg</PICTURE>
		<LAT>43.75786106871274</LAT>
		<LNG>-79.35396031067039</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200023-E19101-HR006</ID>
		<PNAME>85 Sweeney Drive</PNAME>
		<DESCRIPTION>Please be advised that as a result of the City of Toronto's construction plans within the neighbourhood, Toronto Hydro will require that a hydro pole be installed within the City-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Work</ACTIVITY>
		<TIMELINE>July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>85SweeneyDrive.jpg</PICTURE>
		<LAT>43.735265422602346</LAT>
		<LNG>-79.31509282116045</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W16325</ID>
		<PNAME>Benjamin Boake - Sentinel Phase 1</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and replacing hydro poles, transformers and tap boxes on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – February 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BenjaminBoakeSentinelPh1.jpg</PICTURE>
		<LAT>43.747718955747736</LAT>
		<LNG>-79.492835757682</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210022-ED151001 / E21082</ID>
		<PNAME>Brimley - Citadel</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – June 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BrimleyCitadel.jpg</PICTURE>
		<LAT>43.74181748275157</LAT>
		<LNG>-79.25550174319567</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E18069</ID>
		<PNAME>Challenger-Conlins Phase 2</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables and installing underground tap boxes on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – April 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>ChallengerConlinsPh2.jpg</PICTURE>
		<LAT>43.79022498369543</LAT>
		<LNG>-79.1855657315173</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164019</ID>
		<PNAME>Finch-Lawrence-Morningside</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing the existing transformer on the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FinLawMorn1.jpg</PICTURE>
		<LAT>43.80039318657983</LAT>
		<LNG>-79.3003025177085</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164019</ID>
		<PNAME>Finch-Lawrence-Morningside</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing the existing transformer on the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FinLawMorn2.jpg</PICTURE>
		<LAT>43.77944217188593</LAT>
		<LNG>-79.29727960753445</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164019</ID>
		<PNAME>Finch-Lawrence-Morningside</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing the existing transformer on the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FinLawMorn3.jpg</PICTURE>
		<LAT>43.828939871452135</LAT>
		<LNG>-79.22883757468128</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164019</ID>
		<PNAME>Finch-Lawrence-Morningside</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing the existing transformer on the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FinLawMorn4.jpg</PICTURE>
		<LAT>43.79441409007895</LAT>
		<LNG>-79.20238060827734</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164019</ID>
		<PNAME>Finch-Lawrence-Morningside</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing the existing transformer on the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FinLawMorn4.jpg</PICTURE>
		<LAT>43.79038356237905</LAT>
		<LNG>-79.20863367769357</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164019</ID>
		<PNAME>Finch-Lawrence-Morningside</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing the existing transformer on the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FinLawMorn5.jpg</PICTURE>
		<LAT>43.759113080042965</LAT>
		<LNG>-79.22891108505817</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210275-ED164019</ID>
		<PNAME>Finch-Lawrence-Morningside</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing the existing transformer on the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FinLawMorn6.jpg</PICTURE>
		<LAT>43.77654603342314</LAT>
		<LNG>-79.15301385334425</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-220175-ED151001</ID>
		<PNAME>Pharmacy - Huntingwood</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes replacing overhead transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>PharmHunt.jpg</PICTURE>
		<LAT>43.78215008455022</LAT>
		<LNG>-79.32181901388064</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210028-ZX9904-00007</ID>
		<PNAME>Yonge - Crescent</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Streetlighting is planning to relocate the overhead electrical system in the community in preparation for TTC’s Rosedale Station Construction. This will include the installation of streetlighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>YongeCres.jpg</PICTURE>
		<LAT>43.6770037108718</LAT>
		<LNG>-79.38924842097464</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210267-ZDX99001-001</ID>
		<PNAME>Lawrence - Guildwood Parkway</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to rebuild the aging streetlighting infrastructure in the community to improve service reliability. This will include the installation of streetlighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LawGuild.jpg</PICTURE>
		<LAT>43.75937219745859</LAT>
		<LNG>-79.18249189425275</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190566-WD191001-001</ID>
		<PNAME>Kingston - Lawrence</PNAME>
		<DESCRIPTION>Toronto Hydro is relocating existing Toronto Hydro infrastructure to accommodate traffic signals within the area. This includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>KingLaw.jpg</PICTURE>
		<LAT>43.76766561426768</LAT>
		<LNG>-79.18960439286347</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190566-WD191001-001</ID>
		<PNAME>Islington - Royal York West Section</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to rebuild the aging streetlighting infrastructure in the community to improve service reliability. This will include the installation of streetlighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>IslingtonRoyalYorkWest.jpg</PICTURE>
		<LAT>43.65179220572784</LAT>
		<LNG>-79.51950302195662</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-200219-ZDX99001-006</ID>
		<PNAME>Islington - Royal York East Section</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Streetlighting is planning to rebuild the aging infrastructure in the community to improve service reliability. This will include the installation of streetlighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>IslingtonRoyalYorkEast.jpg</PICTURE>
		<LAT>43.65422930198711</LAT>
		<LNG>-79.50784147128219</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210011-E10101-LN007</ID>
		<PNAME>15 Chestnut Park</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and installing underground tap boxes within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>15ChestnutPark.jpg</PICTURE>
		<LAT>43.678687863611</LAT>
		<LNG>-79.38779656311846</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210267-ZDX99001-002</ID>
		<PNAME>Lawrence - Sheppard Ave E</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Streetlighting is planning to rebuild the aging infrastructure in the community to improve service reliability. This will include the installation of streetlighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LawrenceSheppardAveE.jpg</PICTURE>
		<LAT>43.763453113310305</LAT>
		<LNG>-79.29134429369212</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210099-XD139001</ID>
		<PNAME>Bridgman Fibre Install</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the underground electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and  installing duct banks on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BridgmanFibre.jpg</PICTURE>
		<LAT>43.670501641815044</LAT>
		<LNG>-79.39222565145003</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200028-W19101HR013</ID>
		<PNAME>Eglinton - Croham</PNAME>
		<DESCRIPTION>Toronto Hydro has been requested to relocate poles along Eglinton Avenue West to accommodate a new building at 2280 Eglington Avenue West. This rebuild includes relocating hydro poles on the city-owned property at 2280 Eglington Avenue West.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – July 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>EglintonCroham.jpg</PICTURE>
		<LAT>43.693693196815445</LAT>
		<LNG>-79.46390986412658</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-220007-W10501</ID>
		<PNAME>Fima – Horner Civil Phase 3 Part 4</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be installing civil ducts on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Work</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FimaHornerPh3Pt4.jpg</PICTURE>
		<LAT>43.602373728746905</LAT>
		<LNG>-79.52698916332264</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-212222-WD124007</ID>
		<PNAME>Fima Horner Civil Phase 3 Part 3</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical and Civil Work</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FimaHornerPh3Pt3.jpg</PICTURE>
		<LAT>43.60568031144109</LAT>
		<LNG>-79.52758079677189</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-212222-WD124003</ID>
		<PNAME>Fima Horner Civil Phase 3 Part 1</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical and Civil Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FimaHornerPh3Pt1.jpg</PICTURE>
		<LAT>43.60663532977771</LAT>
		<LNG>-79.52344722991418</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-E10501-LS052</ID>
		<PNAME>Danforth Avenue Network Upgrade</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Work</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DanforthAveNetworkUpgrade.jpg</PICTURE>
		<LAT>43.68939184365329</LAT>
		<LNG>-79.29645957632493</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180240-Z18402-HD002</ID>
		<PNAME>Redlea - Steeles</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro will be doing some minor work in the community in preparation for the GO Expansion Electrification program.  This work involves removing electrical cables running in existing conduits on City owned property.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>August 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>RedleaSteeles.jpg</PICTURE>
		<LAT>43.822615446741686</LAT>
		<LNG>-79.3034797578154</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>E14251</ID>
		<PNAME>Tallpines - Bonnydon</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and installing tap boxes on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – September 2022</TIMELINE>
		<PSTATUS> Current</PSTATUS>
		<PICTURE>TallpineBonnydon.jpg</PICTURE>
		<LAT>43.800261628602016</LAT>
		<LNG>-79.15784369690107</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-220174-XD183001</ID>
		<PNAME>20 St Patrick Street</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>20StPatrickSt.jpg</PICTURE>
		<LAT>43.651057550407856</LAT>
		<LNG>-79.38968157081182</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190077-WX9902-HN001</ID>
		<PNAME>Lawrence Heights Demo Ph 1 and 2 </PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be upgrading the overhead electrical cables and installing hydro poles within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>LawHeights.jpg</PICTURE>
		<LAT>43.72257526401788</LAT>
		<LNG>-79.43886758008632</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-220176-XD163001 / P-220177-XD163001</ID>
		<PNAME>1140 Bloor Street West</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>July 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1140BloorStW.jpg</PICTURE>
		<LAT>43.6597443662093</LAT>
		<LNG>-79.43595235875722</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210066-Z13501-HN001</ID>
		<PNAME>1682 Victoria Park Avenue</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>August 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1682VictoriaParkAve.jpg</PICTURE>
		<LAT>43.73099484221502</LAT>
		<LNG>-79.30525338920663</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190417-ED151001 / E21088</ID>
		<PNAME>Pape Overhead Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and relocating hydro poles on city-owned property near the lot</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – April 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>PapeOverheadRebuild.jpg</PICTURE>
		<LAT>43.68897019586883</LAT>
		<LNG>-79.34868468713762</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190417-ED151001 / E21088</ID>
		<PNAME>Pape Overhead Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and relocating hydro poles on city-owned property near the lot</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – April 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>PapeOverheadRebuild.jpg</PICTURE>
		<LAT>43.68293818395083</LAT>
		<LNG>-79.35004513482512</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190417-ED151001 / E21088</ID>
		<PNAME>Pape Overhead Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and relocating hydro poles on city-owned property near the lot</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – April 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>PapeOverheadRebuild.jpg</PICTURE>
		<LAT>43.688658142983606</LAT>
		<LNG>-79.34263748809538</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190417-ED151001 / E21088</ID>
		<PNAME>Pape Overhead Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and relocating hydro poles on city-owned property near the lot</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – April 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>PapeOverheadRebuild.jpg</PICTURE>
		<LAT>43.679360370529956</LAT>
		<LNG>-79.3486869641131</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-212222-WD124006</ID>
		<PNAME>Fima - Horner Civil Phase 3 Part 2</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Work</ACTIVITY>
		<TIMELINE>August 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>FimaHornerPh3Pt2.jpg</PICTURE>
		<LAT>43.6063706499788</LAT>
		<LNG>-79.52451058145941</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-059</ID>
		<PNAME>Bartley - O'Connor Part 3</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and relocating hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – October 2021</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>BartleyOConnorPt3.jpg</PICTURE>
		<LAT>43.7163016550539</LAT>
		<LNG>-79.30744040670166</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-059</ID>
		<PNAME>Bartley - O'Connor Part 3</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and relocating hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – October 2021</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>BartleyOConnorPt3.jpg</PICTURE>
		<LAT>43.71968623403904</LAT>
		<LNG>-79.30576175191723</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-E10501-LN052</ID>
		<PNAME>890 Meadowvale Road</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and transformers within the city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Work</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>890MeadowvaleRd.jpg</PICTURE>
		<LAT>43.80463271413716</LAT>
		<LNG>-79.1671531331289</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190054-XD139001 / X19194</ID>
		<PNAME> Queens Quay E - Freeland</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – January 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>QueensQuayFreeland.jpg</PICTURE>
		<LAT>43.650866417040916</LAT>
		<LNG>-79.3659210729162</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190054-XD139001 / X19194</ID>
		<PNAME> Queens Quay E - Freeland</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – January 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>QueensQuayFreeland.jpg</PICTURE>
		<LAT>43.64739631075382</LAT>
		<LNG>-79.37302030820253</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190054-XD139001 / X19194</ID>
		<PNAME> Queens Quay E - Freeland</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – January 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>QueensQuayFreeland.jpg</PICTURE>
		<LAT>43.643997522968974</LAT>
		<LNG>-79.37270092109848</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-190054-XD139001 / X19194</ID>
		<PNAME> Queens Quay E - Freeland</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – January 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>QueensQuayFreeland.jpg</PICTURE>
		<LAT>43.644588556723484</LAT>
		<LNG>-79.36938695029141</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200232-E10502-HR004</ID>
		<PNAME>Sheppard - Brownspring</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to expand and connect overhead and underground electrical system in the community to enable Metrolinx to accommodate construction of the new Scarborough Subway Extension. This includes upgrading overhead and underground electrical cables, replacing hydro poles, installing switches, splice vaults and transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>August 2021 – November 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>SheppardBrownspring.jpg</PICTURE>
		<LAT>43.78875517944963</LAT>
		<LNG>-79.26296097757564</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190056-E10101-LS164</ID>
		<PNAME>185 Malvern Street Revised Timeline </PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and installing tap boxes on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>August 2021 – September 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>185MalvernSt.jpg</PICTURE>
		<LAT>43.79991639074012</LAT>
		<LNG>-79.23763062608337</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X21051</ID>
		<PNAME>Bloor Street West Network Unit Changeout</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Network Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – December 2021</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>BloorStWNetworkUnitChangeout.jpg</PICTURE>
		<LAT>43.66735955267404</LAT>
		<LNG>-79.40071043644369</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210083-WD161001</ID>
		<PNAME>Weston Road Spot Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables, replacing hydro poles, and replacing underground transformers on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – February 2022</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>WestonRdSpotReplacement1.jpg</PICTURE>
		<LAT>43.679866590461685</LAT>
		<LNG>-79.47508771722171</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210083-WD161001</ID>
		<PNAME>Weston Road Spot Replacement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables, replacing hydro poles, and replacing underground transformers on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – February 2022</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>WestonRdSpotReplacement2.jpg</PICTURE>
		<LAT>43.69967233472468</LAT>
		<LNG>-79.51487450103212</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X13470</ID>
		<PNAME>Dufferin - Wiltshire Revised Timeline Update</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>May 2020 – April 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>DufferinWiltshire.jpg</PICTURE>
		<LAT>43.66710371560335</LAT>
		<LNG>-79.4443961414043</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210064-Z10501-HN006</ID>
		<PNAME>Antler Street</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro is planning to rebuild Metrolinx’s existing service in preparation for the Metrolinx Go Expansion Electrification Program.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Work</ACTIVITY>
		<TIMELINE>September 2021 – December 2021</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>AntlerSt.jpg</PICTURE>
		<LAT>43.664356090660796</LAT>
		<LNG>-79.44842809547616</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190057-X10501-HN079</ID>
		<PNAME>25 Ontario Street</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This upgrade includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – March 2022</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>25OntarioSt.jpg</PICTURE>
		<LAT>43.65131911765251</LAT>
		<LNG>-79.36825679941803</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X19210</ID>
		<PNAME>Carlaw - Gerrard Phase 4</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot. Please be advised that throughout this project, planned power outages will not be required.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – May 2022</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>CarlawGerrardPh4.jpg</PICTURE>
		<LAT>43.66631995528182</LAT>
		<LNG>-79.34868381182054</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210067-X10502 / X19336</ID>
		<PNAME>187 Parliament Street</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the property to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – March 2022</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>187ParliamentSt.jpg</PICTURE>
		<LAT>43.65302449543458</LAT>
		<LNG>-79.37067358613652</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210067-X10502 / X19336</ID>
		<PNAME>187 Parliament Street</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the property to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – March 2022</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>187ParliamentSt.jpg</PICTURE>
		<LAT>43.65399181645</LAT>
		<LNG>-79.36674296296296</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>X18290</ID>
		<PNAME>Danforth 4kV Conversion Phase 2B Part 2</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – March 2022</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>DanforthAvePh2.jpg</PICTURE>
		<LAT>43.67669536424533</LAT>
		<LNG>-79.31629450424533</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-220016-X10501</ID>
		<PNAME>45 Parliament Street</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables within the city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Work</ACTIVITY>
		<TIMELINE>September 2021 – November 2021</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>45ParliamentSt.jpg</PICTURE>
		<LAT>43.65032167405007</LAT>
		<LNG>-79.37897936744558</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210028-ZX9904-00007</ID>
		<PNAME>1549 Royal York Road</PNAME>
		<DESCRIPTION>Please be advised that Toronto Hydro Streetlighting is planning to rebuild the aging infrastructure in the community to improve service reliability. This will include the installation of streetlighting infrastructure on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Work</ACTIVITY>
		<TIMELINE>August 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>1549RoyalYorkRd.jpg</PICTURE>
		<LAT>43.69583213079671</LAT>
		<LNG>-79.53253521231382</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210135-XD138001</ID>
		<PNAME>Harbord Street Roof Rebuild</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes replacing the roof of a cable chamber on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – February 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>HarbordStRoofRebuild.jpg</PICTURE>
		<LAT>43.66350561958048</LAT>
		<LNG>-79.40416762939962</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-190099-EX9931-HN001</ID>
		<PNAME>127 Bartley Drive</PNAME>
		<DESCRIPTION>Please be advised that as a result of construction to the neighbour’s property, Toronto Hydro will be replacing the existing electrical cables and hydro poles within the city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>August 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>127BartleyDr.jpg</PICTURE>
		<LAT>43.72270025190051</LAT>
		<LNG>-79.3085039169086</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-215000-ED166003-057</ID>
		<PNAME>Bartley - O'Connor Part 1</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – October 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BartleyOConnorPt1.jpg</PICTURE>
		<LAT>43.71970309468565</LAT>
		<LNG>-79.31450565974265</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-210014-W10501-LN024</ID>
		<PNAME>Bloor Street West Reinstatement</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading underground electrical cables on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – December 2021</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>BloorStReinstatement.jpg</PICTURE>
		<LAT>43.64106460048101</LAT>
		<LNG>-79.53877570463146</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-218000-WD124010</ID>
		<PNAME>Jane – Woolner Phase 2B</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. This rebuild includes upgrading overhead and underground electrical cables and replacing cable chambers on city-owned property near the lot. Toronto Hydro may also require access to the property to install an underground pipe connecting the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – October 2022</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>JaneWoolner2B.jpg</PICTURE>
		<LAT>43.67169227032049</LAT>
		<LNG>-79.49375788652985</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-200028-X19101-HR001 / C-200028-X19101-HR014</ID>
		<PNAME>Simcoe - Front Path Tunnel Phase 1-3</PNAME>
		<DESCRIPTION>Toronto Hydro is planning to relocate the overhead and underground electrical system in the community to accommodate construction of the new Pedestrian Tunnel for the Toronto PATH network. This includes upgrading overhead and underground electrical cables and replacing hydro poles on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Work</ACTIVITY>
		<TIMELINE>September 2021 – December 2022</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>SimcoeFrontPathTunnel.jpg</PICTURE>
		<LAT>43.645402507396454</LAT>
		<LNG>-79.38527117042543</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-160315-XD152002</ID>
		<PNAME>Forest Hill Civil Phase 2</PNAME>
		<DESCRIPTION>Toronto Hydro is rebuilding the electrical distribution system in the community to improve the reliability of the electrical service. The rebuild includes the relocation of hydro poles within the City of Toronto’s public property allowance and on private property. Please note that we may require access to the property to install an underground pipe that connects the meter at the home to the main electrical line.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>October 2021 – May 2022</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>ForestHillCivilPh2.jpg</PICTURE>
		<LAT>43.70419936343862</LAT>
		<LNG>-79.42434472216337</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>W12767</ID>
		<PNAME>Eva - Highway 427 Revised Timeline Update </PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground  Electrical Upgrade</ACTIVITY>
		<TIMELINE>August 2021 – February 2022</TIMELINE>
		<PSTATUS>Current</PSTATUS>
		<PICTURE>EvaHighway427.jpg</PICTURE>
		<LAT>43.640202748684956</LAT>
		<LNG>-79.56073533437161</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210344-ED164001</ID>
		<PNAME>Brimley-McCowan-Warden</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – December 2021</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>BMWBrimley.jpg</PICTURE>
		<LAT>43.766090632094496</LAT>
		<LNG>-79.25865400306918</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210344-ED164001</ID>
		<PNAME>Brimley-McCowan-Warden</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – December 2021</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>BMWWarden.jpg</PICTURE>
		<LAT>43.71918708589795</LAT>
		<LNG>-79.2828244839712</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210344-ED164001</ID>
		<PNAME>Brimley-McCowan-Warden</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – December 2021</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>BMWMcCowan.jpg</PICTURE>
		<LAT>43.79181350887098</LAT>
		<LNG>-79.26220629509235</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>P-210344-ED164001</ID>
		<PNAME>Brimley-McCowan-Warden</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading underground electrical cables and replacing transformers on city-owned property near the lot.</DESCRIPTION>
		<ACTIVITY>Underground Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – December 2021</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>BMWMcCowan.jpg</PICTURE>
		<LAT>43.78275305799883</LAT>
		<LNG>-79.25812259905341</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>
	<PROJECT>
		<ID>C-180013-X10101-LN005</ID>
		<PNAME>13 Winchester Street</PNAME>
		<DESCRIPTION>Toronto Hydro is upgrading the electrical distribution system in the community to improve the reliability of the electrical service. This includes upgrading overhead and underground electrical cables, replacing hydro poles and installing underground transformers on city-owned property near the lot. During construction, the installation of new poles and removal of existing poles will require temporary removals and modifications to any and all obstructions on the property line closest to the road.</DESCRIPTION>
		<ACTIVITY>Overhead and Underground Civil and Electrical Upgrade</ACTIVITY>
		<TIMELINE>September 2021 – October 2021</TIMELINE>
		<PSTATUS>Future</PSTATUS>
		<PICTURE>13WinchesterSt.jpg</PICTURE>
		<LAT>43.665641820833784</LAT>
		<LNG>-79.36963478159726</LNG>
		<LIVE>Yes</LIVE>
	</PROJECT>